HomeMy WebLinkAboutLINDEN GROVE PUD - PRELIMINARY - 49-94 - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETING15. What will be the impact of this development on the school system?
A. The City will notify the School District of this development. The school does its own
planning.
16. What about fire protection?
A. Poudre Fire Authority will also be routed the plans. It is their decision to build a new
fire station. If they believe there is a need, they will begin to look for a new site.
17. Why are the new houses being built? Is there a need?
A. We believe there is a need for this type of housing in the community.
18. How long will the project take?
A. Could be many years before it is built out.
19. When will realignment of the flood channel occur?
A. This is being evaluated by the feds and the City Stormwater Department . Possibly
within the next three to four years. This realignment would take Alta Vista out of the
flood plain.
20. What about the water in the Lake Canal?
A. We don't plan to change the way the Lake Canal operates. ,
3
5. Will there be a fence around the development?
A. Probably along Lemay. Probably not along South or West boundary, will be left up to
individual lot owners.
6. Would like a fence along Alta Vista property.
7. Would there be a connection to Alta Vista, for instance a street? We don't want one.
Our streets aren't built to handle additional traffic. People would cut through to get to
Vine Drive and miss the traffic signal.
A. The realignment of the flood channel would make it hard for one to have access to Alta
Vista. City wants us to consider pedestrian access.
8. Does this effect Redwood Street? Will it be put through?
A. Yes, it is planned to connect to Vine, someday. This development probably will not
trigger it.
9. Will there be a bike trail along the canal?
A. On the old master plan a bike path is shown. At this point we are not sure if it will go
in. City may have trail go up along Redwood.
10. What is the size of the park do you propose?
A. 200 ft. by 200 ft. or approximately one acre.
11. Has a traffic study been done?
A. One is currently being done.
12. We are concerned about traffic delays, especially on Lemay and conflicts with the
railroad.
13. Andersonville will be impacted the most by traffic.
14. Will an overpass be built over the railroad tracks?
A. Maybe someday, with new alignment of Lemay Avenue.
Oa
NEIGHBORHOOD MEETING MINUTES
PROJECT: Lindengrove, PUD
DATE: June 8, 1994-
APPLICANT: Cityscape Urban Design
CONSULTANT: Terence Hoaglund
PLANNER: Kirsten Whetstone
The meeting began with an introduction to the City of Fort Collins Planning Department and
their planning process. The property is owned by the Schlaegel's. They have proposed a
mixed residential development consisting of 213 units. There would be duplexes, single
family homes, patio homes, and a small park. There is a plan to realign Dry Creek and
Lemay Avenue.
QUESTIONS, CONCERNS, COMMENTS
1. How many duplexes are proposed?
A. 26 buildings with 52 units.
2. What will be the price range for the homes?
A. $125,000 to $180,000. This will be a mixed use development with an average of 3 1/2
dwelling units per acre.
3. Traffic Signals, location of.
a. At openings to Lemay
b. Left turn lanes
A. a. Only when warranted by traffic count and accident records.
b. May be necessary, depends on traffic study.
4. Show us duplexes and square footage.
1