Loading...
HomeMy WebLinkAboutLINDEN GROVE PUD - PRELIMINARY - 49-94 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSPlease contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. Sincerely, 4 F a Steve Olt Project Planner xc: Bob Blanchard, Chief Planner Kerrie Ashbeck Advance Planning Stormwater Utility Transportation Parks & Recreation Natural Resources Donald Schlagel TST Engineers file/Project Planner 12. The Lake Canal has not yet been notified, to my knowledge, of this development proposal. ,The plans were mistakenly sent (by the City) to the Pleasant Valley & Lake Canal Company, who understandably has stated that this development will have no impact on their ditch. We (the Planning Department) are in the process of correcting this error. 13. The southwesterly portion of the property is in the Dry Creek floodway and the mid -section of the proposed development is in the floodplain. No building can occur in the floodway, any development in the floodplain must be elevated, and no basements can occur in this area. The designations on the Site Plan should be changed to reflect the correct information, i.e.: The line shown near the Redmond Lane location is the floodplain and. the line near the active open space on the south property boundary is the floodway. The site Plan revisions should clearly reflect the fact that the portion of the development that is currently in the floodway (Little Leaf & Basswood Courts and all the dwelling units accessed by these streets) can go to the Planning and Zoning Board for preliminary approval; however, they cannot be submitted to the City for final consideration until the proposed Dry Creek Channel realignment is completed, thereby taking this area out of the floodway. This should be noted on the Site Plan, the Landscape Plan, the subdivision plat, the utility plans, and the grading & drainage plans. Also, a letter of understanding from the Schlagels to the City is needed. 14. The City would like to provide for a bicycle/pedestrian connection along the Lake Canal. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the November 14, 1994 Planning and Zoning Board hearing: ****************************************************************** Plan revisions are due no later than the end of the working day, October 26, 1994. Please contact me for the number of folded revisions required for each document. PMT's, renderings, and 8 folded copies of final revisions (for the Planning and Zoning Board packets) are due by 3:00 p.m. on November 7, 1994. l� 5. The Transportation Department has stated that a vehicular connection to Alta Vista should be provided. Also, the vehicular connection of Redmond Lane (by whatever name it ends up being) across the Lake Canal must be made and tied into the Redwood P.U.D. street system. Please contact Tom Vosburg, at 221-6608, if you have questions about these traffic comments. 6. The Engineering Department has the following comments to offer: a) All the appropriate signature blocks and dedication statement must be included on the Final Site Plan. b) Add a north arrow and scale to the Vicinity Map on the Site Plan. c) Signature blanks, surveyor's disclaimer, and dedication statement are needed on the Final subdivision plat. d) Show the northern boundary of the 100-year floodplain on the utility plans. e) Show cross -sections of North Lemay Avenue. f) Identify deteneion ponds and outlets to Dry Creek. Please contact Kerrie Ashbeck or Sheri Wamhoff, at 221-6750, if you have questions about these comments. 7. Is the property across North Lemay Avenue, to the east, really named Boneville Acres? 8. The Natural Resources Division has stated that they need to be involved with the review of the Dry Creek Channel realignment. To date they have not received the engineering plans and they need to review these plans within the context of the overall Dry Creek design. 'Please contact Rob Wilkinson, at 221-6600, to coordinate this review. 9. The developer should contact Tim Buchanan, the City Forester, for an evaluation of existing trees on this site. Tim can be reached at 221-6640 for scheduling a time to meet on -site. 10. This area will be served by the Redwood Bicycle connection to the west. The City would like public access between Lots 61 & 62, at the end of Little Leaf Court, for access to and across the Lake Canal. 11. Although there are no apparent problems with the Preliminary P.U.D. plans, the developer and landscape architects should be aware of the fact that the Final P.U.D. plans will be subject to and reviewed against the Water Conservation Standards for Landscapes, being part of City Ordinance #76, 1994, which are attached to this letter. Communit, Tanning and Environmental Se. :es Planning ,Department City of Fort Collins October 5, 1994 Eldon Ward Cityscape Urban Design, Inc. 3555 Stanford Road, #105 Fort Collins, CO. 80525 Dear Eldon, Staff has reviewed your development plans for the Linden Grove P.U.D. - Preliminary that were submitted to the City on September 12, 1994, and would like to offer the following comments: 1. Public Service Company of Colorado has these comments to offer: a) Utility easements adjacent to all street rights -of -way need to be such that the distance from back of walk to the rear line of the easement is 13' minimum. b) Open spaces should also be designated as utility easements. c) No trees may be planted within 4' of gas lines. 2. Columbine CableVision has these comments to offer: a) They would like to see the open spaces marked as Open Space & Utility Easements. They will need a continuous easement at Lots 25, 26, 32 & 33. b) They will need a rear lot easement on Lots 38 & 39. In addition, they need an easement outside of the Lake Canal that is adjacent along the length of the northwest side of this,development. 3. A copy of the comments received from the Building Inspection Department are attached to this letter. 4. The following streets need to be renamed due to sound -a -likes: * Redmond Lane & Circle (Redman Drive already exists). * Greenspire Court (Greenbriar Road already exists). * Glenlevin Court (Glen Haven & Glenlyon already exist). 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750