HomeMy WebLinkAboutLINDEN GROVE PUD - PRELIMINARY - 49-94 - SUBMITTAL DOCUMENTS - ROUND 1 - LDGS ACTIVITY FORMq
Linden Grove Preliminary.PUD
Activity A: ALL DEVELOPMENT CRITERIA
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the aftedon.
appiicabla7
Wpl the arftedo
be 3a(Wed7
;)
If no, please explain
s
Yes
No
Al. COMMUNITY -WIDE CRITERIA
1.1 Solar Orientation
X
I
X
1.2 Comprehensive Plan
x
X
1.3. Wildlife Habitat
X
1.4 Mineral Deposit
X
1.5 Ecologically Sensitive Areas
reserved
reserved
1.6 Lands of Agricultural Importance
1.7 Enercv Conservation
X1
I
x-I
I-
1.8 Air Quality
X
0
1.9 Water Qualitv
I
x
1.10 Sewaae and Wastes
X
I
Ix
A 2: NEIGHBORHOOD COMPATIBILITY CRITERIA
2.1 Vehicular. Pedestrian. Bike Transoortation
x
X
2.2 Buildina Placement and Orientation
X
X
2.3 Natural Features
X
X
2.4 Vehicular Circulation and Parking
X
X
2.5 Emergency Access
X
X
2.6 Pedestrian Circulation
x
x
2.7 Architecture
X
X
2.8 Building Height and Views
X
2.9 Shading
X.
X
2.10 Solar Access
X
X
2.11 Historic Resources
X
2.12 Setbacks
X
X
2.13 Landscape.
X
x
2.14 Sions
X
2.15 Site Lighting
x
X
2.16 Noise and Vibration
X
x
2.17 Glare or Heat
2.18 Hazardous Materials
X
A 3. ENGINEERING CRITERIA
3.1 Utility Capacity
X
X.
3.2 Design Standards
x
x
3.3 Water Hazards
X
X
3.4 Geologic Hazards
x
54