HomeMy WebLinkAboutBRIDGEFIELD P.U.D., PHASE I - FINAL ..... APRIL 24 & MAY 8, 1995 P & Z BOARD HEARINGS - 45-94A - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSSCHOOL PROJECTIONS
PROPOSAL: BRIDGEFIELD PUD, Phases I & II
DESCRIPTION: 62 housing units on 8.22 acres
DENSITY:
General Population
7.54 du/acre
284 (units) x 3.5 (persons/unit) = 994
School Age
Population
Elementary -
62 (units) x
Junior High -
62 (units) x
Senior High -
62 (units) x
.450
(pupils/unit) =
27.9
.210
(pupils/unit) =
13.02
.185
. (pupils/unit) =
11.47
iTk/ �ry y/Y v.V v, I. - , r 11
FtiA: ALL DEVELOPMENT CRITERIA
CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the criterion
aepiicablV
Will the criteria
be satisfied?
If no, please explain
o � s
a Yes
No
Al. COMMUNITY -WIDE CRITERIA
1.1 Solar Orientation
I I
I
I
I
1.2 Comorehensive Plan
✓I
V/
1.3 Wildlife Habitat
I V1
j V/
1.4 Mineral Deposit
1
1.5 Ecologically Sensitive Areas __reserved1
reserved
I
6 Lands of Agricultural Imoorance
1.7 Enerov Conservation
I ✓I
✓
1.8 Air Quality
I
1.9 Water Qualitv
I ✓I
1.10 Sewace and Wastes
1 ✓I
I
1 Water Conservation
Ivl
✓
1.12 Residential Density
2. NEIGHBORHOOD COMPATIBILITY CRITERIAI
2.1 Vehicular. Pedestrian. Bike Tfansoortation
I
I
I ✓
2.2 Building Placement and Orientation
I
I
I v 1
2.3 Natural Features
I I ✓I
I✓ I
I
2.4 Vehicular Circulation and Parking
t/I
✓
2.5 Emergency Access _
12.11
V/2.6
Pedestrian Circulation
I✓
I I
✓ I
2.7 Architecture
2.8 Building Height and Views I
I
2.9 Shading
2 10 Solar Access
1 v
1
✓ I
Historic Resources
1
2.12 Setbacks I
I,/
2.13 Landscape 1
1
2.14 Sicns
2.15 Site Lighting
2.16 Noise and Vibration I
I t/
2.17 Glare or Heat
2.18 Hazardous Materials
A 3. ENGINEERING CRITERIA
3.1 Utility Capacity
3.2 Design Standards
IVI I
L/
3.3 Water Hazards
IV/
3.4 Geologic Hazards
-
Land Development Guidance System for Planned Unit Developments
The City of Fort Collins, Colorado, Revised ch 1994
-61-
UPI
S. BRYAN A'VP
H
o
f ,.
,I
L i.
The Bridges F
LEGEND
IN MU
/v
AP
YIM�.fI['xAl[
<Ii•.W[
SIII
W/MIT
Wwe Y.ew.w
Y m
i' [al
M1YnO IIM.n
trnwnl.lwh.m
_
w Y�y��
Rw. [wml/.ra
Pwrr
rrw
-I h'm
e�Mw
1-1 /I'ml
Sw.e•e .��lal.
Ja..n.[. i.r'lll.[ •
1-t/t'eel
1
Na w
ow n�Y.
.vlrlr.lr
w
•..1Y9 4..w!
Poli
welil
e v . .. PIO
11.. QI. Ywlw♦ Jwlr
] q
27
J 0.m�r[...wrw� M Ilwl
P.r/w�n.wne6r
� WI
Y
PLANT NOTES
DECIDUOUS TREES
ORNAMENTAL TREES
EVERGREEN TREES
manic mes
� summ .sn
Q nounw .sn
O x.u.xr ,;w
� women rnr '
ros� c� s O
� srnwew.n Wane
On exmrom rtns
O s.e¢ sxow aee
PCRCNNIALS
rw[eer
. wrues .xo ortu.en*u wsxe
wex o.x
O
wil,R R..IG .�n
O cw.wn
snRues
camas neclmevr
®O
muax neee we
O . a .n.v
xmYaso vises
O x[N10xr .Wn
D e o ow
npKiLOLUsi
LECEND
gSTREET UGMT
00 ELECTRIC VAULT
YT
ilRrfna'L
BRIDGEFIELD P.U.D.
.Nu
FORT COLLINS COLORADO
wmsceR nAn
o �
RWLEY ARBOOIATES
omo�_
19.f—
.u.iPa
-4
HaatheL�e Lake
Cord,
c"ll
1. As=l MV^l� �W
31 36
J,
Cl
<
0 116 @ II 7
x r i
Z,
0 5,t
Pond 0
T D;bc-�)"
Faw�iew WAO
West 30
Subd,vision U
31
PHASE 11
10 1 200
15 i
Foothills Green
1st Filing
C)
44,
The Bridges P.U.D.
IFI
wiwi
T
11—W. .--
A
�AIONNG M ZC*Nal
�AMAIWMVAJ.
0
LAM USE BREAKDOWN
lAAP BRIDGERELD P.U.D.
0MIlUng MnFl A�
6L as FORT COLLINS OOLORADO
L
C>
SCHOOL PROJECTIONS
PROPOSAL: BRIDGEFIELD PUD, Phases I & II
DESCRIPTION: 62 housing units on 8.22 acres
DENSITY:
General Population
7.54 du/acre
284 (units) x 3.5 (persons/unit) = 994
School Age
Population
Elementary -
62 (units) x
Junior High -
62 (units) x
Senior High -
62 (units) x
.450
(pupils/unit) =
27.9
.210
(pupils/unit) =
13.02
.185
(pupils/unit) =
11.47
I Isi '..-
moll s
A WN�
DRUM
back 20 feet and leaving the street narrow at 20 feet.
3. Add parking spaces to Bridgefield Drive
We are requiring that five parking bays be added to
Bridgefield Drive to present a street that shows users
where parking is allowed. The developer's design was
just a 20 foot wide street with two parking bays over a
three block length. To allow a street this narrow,
additional bays must be provided in order to have a
street where drivers have a clear picture of where it is
acceptable to park and not park in the 20 foot wide drive
isle.
4. The developer has proposed that Racoon circle be
designated a Oneway street.
it is our opinion that not enough traffic will use the
street to justify a Oneway street. With too little
traffic the Oneway will not be self enforcing. It will
be too easy for users to violate the Oneway control.
Also, it will be too inconvenient for some users to
follow the Oneway restriction. The decision to use a
Oneway or not should be left to the Transportation
Department to determine.
The Board may want to add conditions to support these items.
Transport in Services
Engineering Department
City of Fort Collins
MEMORANDUM
DATE: April 20, 1995
TO: Steve Olt, City Planner
FROM: Mike Herzig, Development Engineering Manager��
RE: Bridgefield P.U.D.
The Engineering Department has reviewed the developer's additional
variance requests and other unique features for this proposed
development related to the proposed public streets. We believe the
approved features, when designed and shown on the plans, will be
okay for the City acceptance of certain streets as public streets
for the City to maintain. The following is a summary of the
requested variances and the conditions for their approval.
1. Request for three streets (Daemian Way, BrynnCourt and
Marmot Way) to deadend in non-standard methods.
The developer requested the use of a "hammer head" turn
around at the end of the deadend streets instead of a
standard cul-de-sac. Mike Pretz, the Fire Marshall, has
stated that the Poudre Fire Authority will not fight
fires in these deadend streets. Therefore, the standard
cul-de-sac is not needed for their purposes. For public
turn around purposes, we have agreed to allow the hammer
head only because of the unique design of this
development. This type of turn around was approved for
Indian Hills P.U.D. as an experiment. This is extending
that experiment. This approval in no way indicates we
will approve this type of design again. We need to see
results from these experimental approvals.
2. Several garage entrances were proposed to front on public
streets with setbacks 3 feet from the back of curb.
The proposed design was a problem for drivers backing a
vehicle out of the garages, not having visibility backing
into the public street. We agreed to a proposal to widen
the 20 foot wide drive area to 27 feet along the areas of
garage frontage and increasing the setback to 5 feet. I
cannot say this is a good design, but we will try it.
Our preference would have been to have the garages set
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6605
Bridgefield P.U.D., Phase I - Final, *45-94A
April 24, 1994 P & Z Meeting
Page 6
If the staff and the developer disagree over the provisions to
be included in the development agreement, the developer may
present such dispute to the Board for resolution. The Board
may table any such decision, until both the staff and the
developer have had reasonable time to present sufficient
information to the Board to enable it to make its decision.
(If the Board elects to table the decision, it shall also, as
necessary, extend the term of this condition until the date
such decision is made.)
If this condition is not met within the time established
herein (or as extended, as applicable), then the final
approval of this planned unit development shall become null
and void and of no effect. The date of final approval for this
planned unit development shall be deemed to be the date that
the condition is met, for purposes of determining the vesting
of rights. For purposes of calculating the running of time for
the filing of an appeal pursuant to Chapter 2, Article II,
Division 3, of the City Code, the "final decisions' of the
Board shall be deemed to have been made at the time of this
conditional approval; however, in the event that a dispute is
presented to the Board for resolution regarding provisions to
be included in the development agreement, the running of time
for the filing of an appeal of such 11final decision" shall be
counted from the date of the Board's decision resolving such
dispute.
2. The design and resulting mitigation measures for storm
drainage facilities, on both the Phase I and Phase II portions
of Bridgefield P.U.D., shall be approved by the Stormwater
Utility and the Natural Resources Division prior to approval
of the utility plans. Also, the utility plans must be reviewed
and approved (with signatures) by the New Mercer and Larimer
County Canal No. 2 ditch companies prior to final utility plan
approval by the City of Fort Collins.
Bridgefield P.U.D., Phase I - Final, #45-94A
April 24, 1994 P & Z Meeting
Page 5
FINDINGS of FACT/CONCLUSIONS:
In evaluating the request for the Bridgefield P.U.D., Final, staff
makes the following findings of fact:
* It is in conformance with the Bridgefield P.U.D.,
Preliminary.
* It meets the applicable All Development Criteria in the
L.D.G.S.
* The eight conditions of preliminary approval have been
met.
* The lots in this development will gain their vehicular
access from internal public and private local street via
a single point of access from West Prospect Road.
* The City Natural Resources Division is actively
negotiating with the developer to purchase a portion of
the property located south of the Larimer County Canal
No. 2 and north of the existing pond in the Heatheridge
Lake Condominiums for use as a natural area. If the
natural areas purchase is completed, the project will
remain in conformance with the City's rules and
regulations.
RECOMMENDATION:
Staff recommends approval of the Bridgefield P.U.D., Phase I -
Final - #45-94A, with the following conditions:
1. The Planning and Zoning Board approves this planned unit
development final plan upon the condition that the development
agreement, final utility plans, and final P.U.D. plans for the
planned unit development be negotiated between the developer
and City staff and executed by the developer prior to the
second monthly meeting (June 26, 1995) of the Planning and
Zoning Board following the meeting at which this planned unit
development final plan was conditionally approved; or, if not
so executed, that the developer or the City staff, at said
subsequent monthly meeting, apply to the Board for an
extension of time. The Board shall not grant any such
extension of time unless it shall first find that there exists
with respect to said planned unit development final plan
certain specific unique and extraordinary circumstances which
require the granting of the extension in order to prevent
exceptional and unique hardship upon the owner or developer of
such property and provided that such extension can be granted
without substantial detriment to the public good.
Bridgefield P.U.D., Phase I - Final, #45-94A
April 24, 1994 P & Z Meeting
Page 4
affect the Phase I development plan and, therefore, the condition
of preliminary approval relating to the no granting and no vesting
of the layout and density is a mute point relative to Phase I.
The Canal Importation Basin floodplain is contained in the area
south of the Larimer County Canal No. 2, which would be Phase II of
the Bridgefield P.U.D. if City acquisition were not to occur. The
63 lots in Phase I are not impacted by this floodplain; therefore,
the condition of preliminary approval relating to delineation of
the floodplain is not relevant to the Phase I approval.
The Bridgefield P.U.D. utility plans have some storm drainage
design features that could impact the potential natural area south
of the Larimer County Canal No. 2 if it is acquired by the City.
Staff is recommending a that condition be placed on the final
approval requiring that the design and resulting mitigation
measures for such a design be approved by the Stormwater Utility
and the Natural Resources Division prior to approval of the utility
plans. Also, the utility plans must be reviewed and approved by the
New Mercer and Larimer County Canal No. 2 ditch companies prior to
final utility plan approval by the City of Fort Collins. This
condition will satisfy the condition of preliminary approval
concerning a provision for legal agreements from the Larimer County
Canal No. 2.
7. Resource Protection:
The City Natural Resources Division is actively negotiating with
the developer to purchase the portion of the property located south
of the Larimer County Canal No. 2 and north of the existing pond in
the Heatheridge Lake Condominiums, containing single family/duplex
lots, for use as a natural area (shown as Phase II, not a part of
the Phase I final P.U.D.). In the event that the City is successful
in negotiating a purchase, then the lots and street/facility
infrastructure would not occur. At that time the completed
Bridgefield P.U.D. would consist of only the 63 lots on the
remainder of the property between West Prospect Road and the
Larimer County Canal No. 2 (Phase I). This revised project would
still meet the requirements of the L.D.G.S. with a density of 7.66
dwelling units per acre.
The first three Natural Resources Division conditions of
preliminary approval (concerning stormwater management and water
quality issues, a buffer zone between roads and an existing pond,
off -site landscaping) are not relevant if the City acquires the
portion of the property south of the Larimer County Canal No. 2
(Phase II of Bridgefield P.U.D.). The fourth condition (concerning
a tree management program for the buffer zone) is being met with
the preparation of a tree management program being created by the
City Forester and the developer.
Bridgefield P.U.D.,
April 24, 1994 P &
Page 3
3. Design:
Landscaping:
Phase 2 - Final, #45-94A
Z Meeting
Deciduous canopy trees will be provided along the West Prospect
Road frontage and a combination of canopy and ornamental trees will
be along the internal local street frontages. There will also be
canopy trees on the rear of the lots along the private driveways.
Evergreen and deciduous ornamental trees will be included in the
common open space areas for accent.
Parking:
The developer is providing 2 parking spaces per lot, totalling 126
spaces, for the proposed 63 dwelling units. There will be 62 guest
parking spaces provided in parallel parking areas along the street
frontages, in front of the homes. These parking areas will be
alternated with landscape islands. The parking spaces are proposed
to be 7' in width, which is less than the City standard of 8'. The
Planning and Zoning Board granted a variance for the decreased
parking width with the Bridgefield P.U.D., Preliminary.
Solar orientation:
A variance to the Solar Orientation ordinance was granted with the
approval of the Bridgefield P.U.D., Preliminary.
5. Transportation:
The lots in this development will gain their vehicular access from
internal public and private local street via a single point of
access from West Prospect Road, directly opposite of and aligned
with South Bryan Avenue to the north.
6. Engineering:
The Engineering Department's engineering -related comments and means
of addressing the condition of preliminary approval concerning the
elimination of the proposed street hammerheads (resulting in the
possible deletion of two lots) are included in a letter from Mike
Herzig of the Engineering Department to the Planning Department
(attached to this staff report).
6. Storm Drainage:
Stormwater detention requirements for this development will be
provided on the lower portion of the property, south of the Larimer
County Canal No. 2, that is currently in acquisition negotiations
between the City and the developer. This detention pond will not
Bridgefield P.U.D., Phase I - Final, #45-94A
April 24, 1994 P & Z Meeting
Page 2
COMMENTS:
1. Background•
The surrounding zoning and land uses are as follows:
N: RL; existing single family residential
S: RP; undeveloped (Bridgefield P.U.D., Phase II)
E: RP; existing multi -family residential (Heatheridge Lake
Condominiums)
W: rp; existing multi -family residential, natural area (The
Bridges Condominiums)
The Planning and Zoning Board approved the Bridgefield P.U.D.,
Preliminary on November 21, 1994 for 99 single family and duplex
dwelling units on 16.93 acres. There were several conditions
attached and they dealt with:
Four Natural Resource conditions concerning stormwater
management and water quality issues, a buffer zone
between roads and an existing pond, off -site landscaping,
and tree management program for the buffer zone.
- Provision for legal agreements from the Larimer County
Canal No. 2.
- Preparation of a study to delineate the Spring Creek
floodplain.
- A redesign to eliminate the hammerheads on the streets,
possibly deleting two lots.
No granting and no vesting of the project's layout and
density.
2. Land Use•
This is a request for final P.U.D. approval for 63 single family
and duplex dwelling units on 8.22 acres, for a gross residential
density of 7.66 dwelling units per acre. There will be 37 single
family detached dwelling units on 37 lots and 26 duplex dwelling
units on 13 lots. This request is in conformance with the
Bridgefield P.U.D., Preliminary and meets the applicable All
Development Criteria of the L.D.G.S.
r
ITEM NO. 16
MEETING DATE 4/24/95
STAFF Steve Olt
City of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Bridgefield P.U.D., Phase I - Final - #45-94A
APPLICANT: Jonathan J. Prouty, President
Lagunitas Company
3307 South College Avenue
Fort Collins, CO. 80525
OWNER: Same As Applicant
PROJECT DESCRIPTION:
This is a request for final planned unit development (P.U.D.)
approval for 63 single family and duplex dwelling units on 8.22
acres located on the south side of West Prospect Road between South
Shields Street and South Taft Hill Road. The property is zoned RLP,
Low Density Planned Residential.
RECOMMENDATION: Approval with conditions
EXECUTIVE SUMMARY:
This request for final P.U.D. approval:
* Is in conformance with the approved Bridgefield P.U.D. -
Preliminary;
* meets the applicable All Development Criteria in the Land
Development Guidance System (L.D.G.S.);
* has addressed the eight conditions of preliminary
approval.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750
PLANNING DEPARTMENT