HomeMy WebLinkAboutBRIDGEFIELD P.U.D., PHASE I - FINAL - 45-94A - CORRESPONDENCE - CITY STAFF (3)Should you have any questions regarding this issue please contact me at 224-6035.
Sincerely,
Bas it Hamdan
Civil Engineer
xc: Mr. Bob Blanchard, Chief City Planner
Mr. Steve Olt, Planner
W. Jon Prouty
File
Utility Sei es
Stormwater
City of Fort Collins
January 27, 1995
Mr. Jack Blake, P.E.
Stewart and Associates
103 S. Meldrum St.
Fort Collins, CO 80521
Re: Bridgefield PUD (Phases 1 and 2) Final submittal
Dear Jack,
The Bridgefield PUD drainage report was submitted to the Stormwater Utility on Monday
January 23'. Upon a preliminary check of submitted materials it became obvious that this
submittal falls below the acceptable standards for a final submittal. According to Section 2.2.2.1
of the City of Fort Collins Storm Drainage Design Criteria manual all final submittals shall include
the calculations for the design of storm sewers. As presented the materials submitted omits this
part and does not size any of the storm drainage conveyance system shown on the overall Utility
Plan as well as on the Drainage Plan.
The proposed Bridgefield development should be given special drainage considerations due to the
relatively small size of streets. This smaller street standard precludes draining the major storm
flows through surface flow. Thus an extensive storm sewerage network will be required for this
development. That presents some difficulty since the storm sewer lines, as well as water and
sanitary sewers are to be located within this same smaller Right Of Way width of the streets. As
currently shown several storm sewers are located under and behind sidewalks and thus would be
infringing on Electric Utility easements. Additionally many inlets are shown to be located on
private property with no public easements.
It is City of Fort Collins policy to reject incomplete/madequate submittals within 48 hours from
submittal date. Since these issues were raised after this initial 48 hour period, this submittal will
be initially kept on the agenda of items to be discussed at Interdepartmental Review on February
6'e 1995 . However, speaking from a Stormwater Utility standpoint only, it will be required that
a complete drainage report (including the missing information noted above and accompanied by
a complete design of all utility lines that would resolve potential utility conflicts) be submitted to
the Stormwater Utility no later than 3:00 p.m. Wednesday February 1 ' 1995, for this item to be
recommended to be considered for the March P&Z hearing. Otherwise, the Stormwater Utility
will recommend that this item be continued to the April P&Z hearing and the new and complete
plans and report should be submitted no later than February 21' 1995.