HomeMy WebLinkAboutBRIDGEFIELD P.U.D., PHASE I - FINAL - 45-94A - CORRESPONDENCE - CITY STAFFCity of Fort Collins
Cultural, )rary and Recreational Services
Forestry Division
MEMORANDUM
DT: February 9, 1995
TO: Steve Olt, City Planner
0
v
__
FR: Tim Buchanan, City Forester t5
S
0
r
w
RE: Bridgefield PUD
?
�s
All existing trees including those along the ditch need to be accurately located
o a
on the Site Landscape Plan. The row of Green Ash along the west property line
v
are significant and should be retained. To successfully preserve these trees,
li
close coordination of the Landscape and Utility Plans will need to occur. If the
r v
plans approved by the Planning and Zoning Board show the trees to be retained,
r
then it should be the expectations that adequate protection and engineering wi U—
` i
occur to insure they survive. If they can't be retained with this design,rthat
should be decided now and mitigation planned for. Each major tree needs to have
a undisturbed zone of 8-10 feet from the trunk in all directions.
The Forestry Division will not be able to provide maintenance or all the trees
on the right-of-way. This note needs to be added to the Landscape Plan.
4 Street trees along Prospect and Bridgefield on the right-of-way will be
maintained by the City Forestry Division. All other trees on this project
shall be maintained by the homeowners association.
/j
281 North College Avenue • Fort Collins, CO 80524 • (303) 221-6361