Loading...
HomeMy WebLinkAboutBRIDGEFIELD P.U.D., PHASE I - FINAL - 45-94A - CORRESPONDENCE - STAFF'S PROJECT COMMENTSA I � This completes the review comments at this time. Additional comments may be forthcoming as the various. departments and reviewing agencies continue to review this request. With your consent, this item has been continued from the March Planning and Zoning Board public hearing to the April Board public hearing. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the April 24, 1995 Board hearing: ****************************************************************** Plan revisions are due no later than the end of the working day, April 51 1995. Please contact me for the number of folded revisions required for each document. PMT's, renderings, and 8 folded copies of final revisions (for the Planning and Zoning Board packets) are due by 3:00 p.m. on April 17, 1995. Please contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. Si ely, Steve Olt Project Planner xc: Kerrie Ashbeck Stormwater Utility Transportation Parks & Recreation Natural Resources Vaught -Frye Architects o Linda Ripley Stewart & Associates file/project planner I 9. There is the potential for heavy erosion problems to occur on the Phase III portion of the site, south of the Larimer County Canal No. 2. There appear to be about 15,000 cubic,yards of dirt to be distributed there. 10. There appear to be some storm sewer inlets on private lots (property). Also, the storm sewers appear to be higher than grade in some locations. 11. The four parallel parking spaces along Bridgefield Drive, adjacent to Lots 1 & 34, will create safety problems and cannot occur. 12. A phase line between Phases I & II should be shown on the plans. Also, it would be helpful to indicate in the Land Use Breakdown on the Site Plan that Phase I is Lots through and Phase II is Lots _ through _ 13. Phase III, as shown on the Site Plan, should be identified as "Not a Part of This Final P.U.D.". It, however, is still part of the overall Bridgefield P.U.D. that has preliminary approval. 14. The Landscape Plan shows special paving treatment at numerous intersections and the Site Plan does not reflect the same treatment. Please be aware that special paving cannot extend into the public street rights -of -way. 15. The .Parking Data under the Land Use Breakdown on the Site Plan indicates 63 guest parallel parking spaces outside of the lots. There appears to be 67 parking spaces shown and some of them are perpendicular to the streets/drives. 16. The Land Use Breakdown on the Site Plan indicates the average single family lot size to be 6,500 square feet. The subdivision plat shows the largest lot in the development to be 3,940 square feet in size. 17. General Note 6 on the Site Plan refers to fencincr cruidelines that will set a consistent design. These guidelines should be submitted to the City for review with the final P.U.D. 18. General Note 10 on the Site Plan, referencing the solar lot compliance, should state that a variance to the Solar Orientation Ordinance was granted with the preliminary P.U.D. approval. 19. The labeling for the existing residence at the northeast corner of this development should be expanded to include "single family". 20. What is the existing land use at the northeast corner of West Prospect Road and South Bryan Avenue? Commun 'Tanning and. Environmental SE `--es Planning Department City of Fort Collins March 8, 1995 Jon Prouty Lagunitas Company 3307 South College Avenue, #200 Fort Collins, CO. 80525 Dear Jon, As was stated in my response letter dated February 23, 1995, additional comments are now forthcoming on the Bridgefield P.U.D., Phases 1 & 2 - Final development review submittal to.the City: 1. It is important to review the conditions of preliminary approval to be assured that they have been addressed and met prior to this item going before the Planning and Zoning Board for a final decision. 2. There appear to be problems/concerns with the street rights - of -way as shown on the Site Plan and subdivision plat. They are inconsistent throughout the development. 3. There is a proposed one-way street system in a portion of the development that the City has concerns about. This system does not function well from a safety standpoint. 4. No current soils report was submitted with the final P.U.D. documents on January 23rd. 5. A connection for looping the water main is needed. 6. There should be a fire hydrant at Red Fox Way and Bridgefield Drive; however, there should not be a hydrant at Bridgefield and Deer Run Drive. . 7. The storm sewer system had not been sized or modeled with the original submittal of the final P.U.D. The method used to model the system was incorrect. There will potentially be a very large stormwater discharge (16 feet per second) into the Larimer County Canal No. 2, to the south of Phases I & II. 8. The proposed narrow streets provide very little surface stormwater drainage capabilities, thereby requiring an extensive (underground) storm sewer system. 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6750 FAX (303) 221-6378 TDD (303) 224-6002