Loading...
HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, BIGHORN OFFICE BUILDING (LOT 2) - PRELIMINARY/FINAL - 43-94E - DECISION - FINDINGS, CONCLUSIONS & DECISIONDEC-04-1997 14:09 WW REYNOLDS FT COLLINS P.02 The Applicant is requesting to exceed the 40 foot height restriction to allow a hipped shaped roof to be built and used as a mechanical screen. This is being requested primarily to create a more aesthetic building. The main building mass would be approximately 40 feet tall with the hipped shaped mechanical screen an additional 8' in height, Please refer to the mass model drawings and shadow analysis on a separate sheet. The applicant feels that the hipped roof option creates a more aesthetic building. Please refer to the photos taken around this site and those locations noted on the area plan drawing. Photo #1 was taken directly outside the windows of the building immediately east of this site facing west. The views from the family medical building are mainly northwest and would look directly towards and through the landscaped area at the northeast corner of the applicants property_ This view would be only minimally affected by the applicants new building. The main mass of the applicant's building is located on the far west side of the site to minimize the scale of the building as it affects the family medical building. The applicant has chosen a hipped roof screen with lighter color concrete roof tile to further reduce the apparent mass of the building. As can be seen in the models, the building mass and placement would be identical in both scenarios. The only difference being in the height of the hipped roof mechanical screen itself. The increased height of the proposed roof would be barely perceptible by both pedestrians and motorist. TOTAL P.02 uses which are contained in the industrial uses section of the E - Employment zoning district, is appropriate. 5. A modification of building height limits is appropriate since the purpose of the proposed building height above 40 feet is to screen the rooftop mechanical equipment. DECISION Based on the findings and conclusions, the request to develop a building on lot 2 of the Horsetooth East business Park located at the southeast corner of the intersection of Bighorn Drive and Automation Way, file #43-94E is APPROVED WITH THE FOLLOWING CONDITIONS: Building tenants shall be limited to those uses which are contained in the industrial uses section of the E - Employment zoning district. 2. The applicant will be responsible for building the sidewalk adjacent to Automation Way south of the subject property to a point where it connects with the existing sidewalk. Dated this 4th day of December, 1997, per authority granted by Sections 1.4.9(E) and 2..1 of the Land Use Code. Robert E. Blanchard, AICP Current Planning Director docfiMean ngs\43-94E. hrg property is located is C. Since the Level of Service standard is not met, this project cannot proceed without completing the gap in the sidewalk system. This need is recognized with a condition of approval. Section 4.22 (EE)(2). Building Design This standard within the E - Employment zoning district contains two criteria: the first is the same as Section 3.5.1(D) discussed above. The second requires that to the maximum extent possible, buildings must be oriented to face the adjacent street with no intervening front yard parking. The proposed project is designed with 35 parking spaces between the building and Automation Way. This clearly does not meet the building design criteria. However, the applicant contends that because the use is industrial in nature (ie. light industrial and research and development), this parking is appropriate. In fact, it is noted that the same uses, when located in the I - Industrial zoning district, do not have to comply with criteria. It is clear that the intent of the E - Employment district is to create a district with pedestrian benefits and an attractive streetscape that includes buildings being placed in close proximity to the sidewalks or, at least, with no intervening parking. However, in the case of this particular application, due to processing irregularities, it is felt that a conditional approval, limiting the use of this building to overlapping uses contained in both the E - Employment and the I - Industrial zoning districts, is appropriate. FINDINGS, CONCLUSIONS AND DECISION FINDINGS AND CONCLUSIONS After reviewing the staff report and the record of the public hearing, the Hearing Officer makes the following findings and conclusions: The proposed Bighorn Building development proposal contains permitted uses in the E - Employment zoning district that are subject to administrative review. 2. The project meets all applicable standards contained in the General Development Standards, Article 3 of the Land Use Code. 3. The project meets all standards contained in Section 4.22, E - Employment zoning district except for Section 4.22 (E)(2)(b). 4. Due to irregularities contained in the processing of this application, it is determined that a conditional approval, limiting the use of this building to 3.5.1 (D) Building Orientation Section, 3.5.1(H) Building Height Review, Section 3.6.4 Transportation Level of Service Requirements and Section 4.22 (E)(2) Building Design. Section 3.5.1(D), Building Orientation This section of the Code states that the main entrance is to face a connecting walkway with a direct pedestrian connection to the street without requiring all pedestrians to walk through parking lots or cross driveways. This project complies with this criteria by providing a walkway from the northwest corner of the building to the sidewalk on automation way. Even though there is a vehicular connection between the western parking area and the northern parking area, it is narrowed at the point of the walkway to just the width of a drive aisle. This section of the site also has additional landscaping. With the special treatment of the walkway, including the use of brick and raising the walkway above the parking lot surface, it is felt that automobile traffic is less likely to use this connection since it is clearly a pedestrian area. With these considerations, the site meets Section 3.5.1(D). Section 3.5.1(H) Building Height Review This section of the Code establishes a special process to review buildings or structures that exceed 40 feet in height. Building elevations indicate the main portion of the building is approximately 40 feet tall with an eight foot tall hipped shaped extension to screen the rooftop mechanical equipment. Section 3.5.1(H)(1)(c) allows for either increasing or decreasing the height limits contained in individual zoning districts for a number of purposes. One of these purposes specifically allows rooftop building extensions to incorporate HVAC equipment. Since the purpose of the proposed building height above 40 feet is to screen the rooftop mechanical equipment, it meets the requirements of this section. Section 3 6 4 Transportation Level of Service Requirements The General Standard contained in this Code section is that all development plans must adequately provide vehicular, pedestrian and bicycle facilities necessary to maintain the adopted transportation Level of Service standards contained in Part II of the City of Fort Collins Multi -modal Transportation Level of Service Manual. While no Transportation Impact Study was included in this application, it has been determined that the pedestrian Level of Service standard is not met since there is a gap in the sidewalk adjacent to Automation Way directly south of the subject property. The pedestrian LOS chapter of the Multimodal Transportation Level of Service Manual identifies five standards, one of which is continuity. Continuity is defined as the completeness of the sidewalk/walkway system with avoidance of gaps. When breaches to the pedestrian network exist, the continuity Level of Service standard is rated as D/E. The required continuity Level of Service Standard for the type of area where the subject PUBLIC HEARING After reviewing the Staff Report and recommendation, a public hearing was held on the subject application at 1:45 PM on December 4, 1997. The hearing was held at 281 North College Avenue, Fort Collins, Colorado. HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE: The following is a list of those who spoke at the meeting: From the City: Steve Olt, City Planner From the applicant: Libby Glass, W.W. Reynolds Company From the Community: None Written Comments: None BACKGROUND This site is part of the three lot Horsetooth East Business Park Minor Subdivision that was approved on February 17, 1995. The development proposal is for a three story, 33,000 square foot building to be used for light industrial and research and development uses with ancillary offices. The property is located in the E - Employment zoning district. The project was reviewed against the General Development Standards contained in Article 3 of the Land Use Code and the District Standards contained in Division 4.22 (the E - Employment zoning district) of the Code. Three sections of the Land Use Code are of specific interest for this project: Section City of Fort Collins Commu y Planning and Environmental •vices Current Planning CITY OF FORT COLLINS ADMINISTRATIVE HEARING OFFICER TYPE I ADMINISTRATIVE HEARING FINDINGS, CONCLUSIONS AND DECISION HEARING OFFICER: Bob Blanchard Current Planning Director PROJECT NAME: Horsetooth East Business Park, Lot 2, Bighorn Office Building CASE NUMBER: 43-94E APPLICANT: Layne Mitchell 4875 Pearl East Circle, #300 Boulder, CO 80301 PROJECT DESCRIPTION: Request for a Project Development Plan (PDP) for the proposed Bighorn Building (Pad H) on Lot 2 of the Horsetooth East Business Park. The site is located at the southeast corner of the intersection of Bighorn Drive and Automation Way. SUMMARY OF RECOMMENDATION AND DECISION: Staff recommendation Hearing Officer Decision ZONING DISTRICT: Approval Approval with conditions E - Employment NOTICE OF PUBLIC HEARING: Notice of public hearing was made on November 19, 1997 by mailing to property owners within 500 feet of the subject property. The public hearing was advertised in the Coloradoan on November 26, 1997. 281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020