Loading...
HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, BIGHORN OFFICE BUILDING (LOT 2) - PRELIMINARY/FINAL - 43-94E - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: I I -T:1 Planner: C�,14— Traffic Operations: Engineer: Items Requested Redlined It( Site land Plat Utility Drainage Rpt Other Items Required Site land Plat Engineering ,< x X Stormwater ->< X X Water/Wastewate X x X TrafTic Operations Trans. Planning Tran*rt Natural Resources Park Planning Other: Note: All redlined items should be returned with the mubmittal/ revisions. Date: ' —e-1► ) <3 7— ms Being Returned Revisions Routiong Sheet MINI FILE: PROJECT PLANNER ENGINEERING: PAVEMENT BUILDING INSPECTION mm MAPPING / DRAFTING ADVANCE PLANNING m R.O.W. PLANNING WATER CONSERVATION POST OFFICE PUBLIC SERVICE SCHOOLS: POUDRE/I�iOMPSON STATE HIGHWAY DEPARTMENT m m DITCH COMPANY DOE ::::'......... .... iiiNo m�� ............�