Loading...
HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, BIGHORN OFFICE BUILDING (LOT 2) - PRELIMINARY/FINAL - 43-94E - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESCAn@@P@ urban design, inc. HORSETOOTH EAST BUSINESS PARK MINOR SUBDIVISION LOT 2 PDP and Final Statement of Planning Objectives October 27, 1997 This phase of the Horsetooth East Business Park - proposed as a 32000 t sq. ft. Light Industrial/R&D building is a continuation of the successful development program being implemented at Horsetooth East by the W. W. Reynolds Companies. The project, located at Big Horn Drive and Automation Way, is in keeping with adopted City Policies, and the goals established for Horsetooth East. These include encouraging the development of a well planned Industrial Business Park with integrated office, industrial, and business service users; and promoting efficient utilization of the existing and proposed street and utility systems. The proposed office building is consistent with City Land Use Policies which promote development near transportation facilities, and where existing infrastructure is in place. Primary entrances to the building open directly onto a walkway that has direct linkage to the intersection of the two adjacent street sidewalks, without requiring pedestrians to cross intervening driveways or parking lots. This is accomplished through the provision of a raised walkway connection between the street corner and the building corner, designed to emphasize pedestrian use, while allowing vehicles to cross over the walk if necessary. The site design also provides an internal pedestrian network that functions as an additional alternative to the street sidewalk by connecting building entries and directly connecting to common destinations in the district. Construction is scheduled to begin in the fall of 1997. Up to 150 people are projected to be employed at this facility.