Loading...
HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, 2ND FILING - FINAL - 43-94D - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (3)16. Control monuments must be described on the Plat. Also, the west boundary of this property appears to be into the Otter Drive R.O.W. Has Otter Drive been vacated? If so, the vacation. ordinance must be noted, as well as the reception number for the off -site easement along the west boundary. 16. The legal description has a typo in the next to the last line (00? 111 3611). 17.. Is this a replat of the Horsetooth East Business Park or South Collins Technical Center? 18. The remainder of note #5 on the cover sheet of the Utility Plans needs to be added. The standard note regarding groundwater seepage also needs to be added to the cover sheet. 19. The Utility Plans need to better clarify if the sidewalk, curb, and gutter is existing or proposed to be built. 20. Please make corrections to the Detail drawings as indicated by the Engineering Department on the redline copy of the Utility Plans. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the May 22, 1995 Planning and Zoning Board hearing: Plan revisions are due by 5:00 p.m.. on May 3, 1995. Please contact me for the number of folded revisions required for each document. PMT1s, renderings, and 8 folded copies of final revisions are due. by 3:00 p.m. on May 15, 1995. Please contact me at 221-6206 if you have any questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. Sincerely; . i el Ludwig ct Planner xc: Kerrie Ashbeck Stormwater Utility file/Project Planner 4. The site shall be accessible to persons with disabilities in accordance with Uniform Building Code Section 3103 and UBC Appendix -Section 3106 Provide designated and marked accessible routes between buildings and the public way and accessible parking and the buildings. Provide parking and signs per Appendix Section 3107. 5. All required exits and all building entrances located within six inches of grade must be connected to the public way by an "accessible route" complying with the American National Standards, Institute publication A117.1-1992 titled Accessible and Usable Buildings and Facilities. 6. Storage or use of hazardous materials must be in compliance with the Fire Code and Chapter 9 of the 1991 Uniform Building ,Code as adopted by the City of Fort Collins. A list of such materials with quantities and classifications should be submitted for review at the time of building permit application. 7. More details are needed regarding the "stock" which is proposed for the trellis. What type of stock? Is it pressure treated? 8. It appears that due to the large size of the proposed roof, the "forest green" color may be inappropriate. Is it compatible with the other structures in the P.U.D.? Please provide colored roofing samples. 9. Soap and water from the carwash facility must drain into the sanitary sewer, not into the storm sewer or street. 10. A fire hydrant must be added on the east side of the full movement entrance/exit on Big Horn Drive. 11. Six parking spaces may not be adequate for all of the uses proposed with this application. Also the dry -off area conflicts with the four parallel parking spaces. 12. Are the shaded areas shown on the site plan and landscape plan display areas for classic or restored cars? Are these areas 'grass-crete"? What constitutes classic or restored? Are 4these cars for sale? No auto sales will be allowed on this site. 13 More Colorado Blue Spruce trees are needed for buffering the use from Timberline Road. The City Forester requests that the two Mayday Trees along Big Horn be changed to Spruce or Pine trees and that an additional shade tree and plantings be added along the north property line. Also, vertical relief is needed on the north side of the car wash building. Are berms proposed along Timberline Road? U14. Please coordinate the landscape design with RBD Engineering to provide 10' separation for trees and 4' separation for shrubs from water/sewer mains and services, meter pits, fire hydrants, gas lines, etc. Com. city Planning and Environmeni ,3ervices Current Planning April 14, 1995 Tyco Oil Company c/o Cityscape Urban Design, Inc. 3555 Stanford Road, Suite 105 Fort Collins, CO 80525 Dear Eldon, Staff has reviewed your documents for the Horsetooth East Business Park, 2nd Filing Final P.U.D., Carriage Wash, that were submitted March 20, 1995, and would like to offer the following comments: 1. The Planning Department is not aware of this item being presented at conceptual review. If so, please notify staff of the date. This pad site received preliminary approval for a convenience store with a one -bay carwash. The use as proposed would require an amended preliminary and final submittal. The mitigation of a six -bay carwash will be much more significant than for a convenience store and one -bay car wash. Also, this development application/must comply with the preliminary drainage plan. The proposed one-w y entrance off of Big Horn Drive is in conflict wih the detention pond design and will not be allowed by the Stormwater Utility Department. The Transportation Depart�ent has noted that this access is inappropriate, not ne ded and will not be allowed. Please contact Mike Ludwig at12�-6206 to set up a meeting with City Staff to discuss the status of this development application as the proposed landuse is inconsistent with the approved Preliminary P.U.D. 4,2. Please submit a completed Activity D, "Auto -Related and Roadside Commercial" use point chart as this was not included with the initial application submittal. 3. U S WEST offers the following comment: "Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. U S WEST will provide telephone service in accordance with the rates and tariffs on file with the Colorado Public Utilities Commission. The owner is responsible for provision of all conduit, ditch, and street crossings for telephone facilities within the project. The owner also provides terminal room space (usually 411x 4') and power for the main terminal at one building on each property, generally in a'janitors' closet or utility room. The owner's vendor provides all facilities beyond the main terminal. Contact the U S WEST engineer for conduit specifications for the main telephone entrance cable." 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 FAX (303) 221-6378 • TDD (303) 224-6002