HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK, 2ND FILING - FINAL - 43-94D - SUBMITTAL DOCUMENTS - ROUND 1 - LDGS ACTIVITY FORMCARRIAGE WASH AT HORbETOOTH EAST BUSINESS PARK 2ND FILING - FINAL PUD
Activity A: ALL DEVELOPMENT CRITERIA
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the criterion
applicable?
Will the criterion
be satisfied?
If no, please explain
Pre-
irril-
nary
Final
Not
Ap-
Ph-
Ca
bl�
Yes
No
Al. COMMUNITY -WIDE CRITERIA
1.1 Solar Orientation
X
1.2 Comprehensive Plan
X
X
1.3 Wildlife Habitat
X
1.4 Mineral Deposit
X
1.5 Ecologically Sensitive Areas
reserved
1.6 Lands of Agricultural Importance
reserved
1.7 Energy Conservation
X
X
1.8 Air Quality
X
X
1.9 Water Quality
X
X
1.10 Sewage and Wastes
X
X
A2. NEIGHBORHOOD COMPATIBILITY CRITERIA
2.1 Vehicular, Pedestrian, Bike Transportation
X
X
2.2 Building Placement and Orientation
X
X
2.3 Natural Features
X
X
2.4 Vehicular Circulation and Parking
X
X
2.5 Emergency Access
X
X
2.6 Pedestrian Circulation
X
X
2.7 Architecture
X
X
2.8 Building Height and Views
X
2.9 Shading
X
X
2.10 Solar Access
X
X
2.11 Historic Resources
X
2.12 Setbacks
X
X
2.13 Landscape
X
X
2.14 Signs
X
X
2.15 Site Lighting
X
X
2.16 Noise and Vibration
X
X
2.17 Glare or Heat
X
2.18 Hazardous Materials
X
X
A3. ENGINEERING CRITERIA
3.1 Utility Capacity
X
X
3.2 Design Standards
X
X
3.3 Water Hazards
X
3.4 Geologic Hazards
X
54