HomeMy WebLinkAboutRIVERSIDE-J.L. WEST - MINOR SUBDIVISION - 58-94 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTDETENTION POND BASIN A-1 HIGH .WATER LINE
VOL. = 1/3 (AREA ABOVE) (DIFFERENCE IN COUNTOUR ELEV.)
2. FOR THE REMAIMDER OF THE VOLUMES BETWEEN CONTOURS (SECTION 9.2)
VOL. = DEPTH/6 (A + 4AB mean + B)
3. HWL=(VOL.REQ.—VOL.LOW CUML)*6/(AREA LOW+4*AVG.AREA+AREA HIGH)
56 95'= HWLPOND;
ORIFICE SIZING
ORIGINAL DESIGN DATA
0.90 = Allowable Des. Release Rate cfs
54.80 = Flowline Orifice Elevation ft
0.65 = Orifice Coefficient Cd
2.15 = Avaliable Driving Head ft
NOTE: 1. HORZ. PLATES WILL BE PLACED 6'
BELOW GRATE
2. VERT. PLATES WILL BE PLACED
AT PIPE FLOWLINE
VERT. CIRCULAR PLATE 11
IF VERT. SQUARE PLATE II
No Text
***** COMPUTATION OF POND SIZE
----------------------------------------------------
RAINFALL
RAINFALL
INFLOW
OUTFLOW
REQUIRED
DURATION
INTENSITY
VOLUME
VOLUME
STORAGE
MINUTE
INCH/HR
ACRE -FT
ACRE -FT
ACRE -FT
----------------------------------------------------
0.00
0.00
0.00
0.00
0.00
5.00
9.00
0.04
0.01
0.04
10.00
7.50
0.07
0.01
0.06
15.00
6.35
0.09
0.02
0.07
20.00
5.20
0.10
0.02
0.07
25.00
4.70
0.11
0.03
0.08
30.00
4.20
0.12
0.04
0.08
35.00
3.85
0.13
0.04
0.08
40.00
3.50
0.13
0.05
0.08
45.00
3.25
0.14
0.05,
0.08
50.00
3.00
0.14
0.06
0.08
55.00
2.80
0.14
0.06
0.08
60.00
2.60
0.15
0.07
0.08
65.00
2.47
0.15
0.08
0.07
-----------------------------------------------------
THE REQUIRED POND SIZE = .0847646 ACRE -FT
THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 35 MINUTES
3, 7OZ cv,. fit.
-----------------------------------
-----------------------------------
DETENTION POND SIZING BY FAA METHOD
Developed by
Dr. James Guo, Civil Eng. Dept., U. of Colorado
Supported by Denver Metro Cities/Counties Pool Fund Study
Denver Urban Drainage and Flood Control District, Colorado
------------------------------------------------------------------------------
------------------------------------------------------------------------------
USER=Stewart and Associates -Ft Collins Colorado...... .........................
EXECUTED ON 12-09-1994 AT TIME 14:28:31
PROJECT TITLE: J.L. West @ Lemay & Riverside
**** DRAINAGE BASIN DESCRIPTION
BASIN ID NUMBER = 1.00
BASIN AREA (acre)= 0.84
RUNOFF COEF = 0.80
***** DESIGN RAINFALL STATISTICS
DESIGN RETURN PERIOD (YEARS) = 100.00
INTENSITY(IN/HR)-DURATION(MIN) TABLE IS GIVEN
DURATION 5 10 20 30 40 50 60 80 100 120 150 180
INTENSITY 9.0 7.5 5.2 4.2 3.5 3.0 2.6 2.1 1.7 1.5 1.2 1.0
***** POND OUTFLOW CHARACTERISTICS:
MAXIMUM ALLOWABLE RELEASE RATE _ .9 CFS
OUTFLOW ADJUSTMENT FACTOR = .945
AVERAGE RELEASE RATE _ .8505 CFS
AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR.
DETENTION SIZING FOR
J.L. WEST
PROPERTY NW 1/49
S.E. CORNER LEMAY & RIVERSIDE
DRAINAGE CRITL ,A MANUAL
RUNOFF
50
30
F_ 2 0
z
w
U
a 10
z
w
a
OJ 5
w
cc 3
O
U 2
cc
w
t-
a
F�
1
�„'■■
A„'I•
r
. I
��r�I■�I�■■ilk
I����■■■■�
:'
WD
:1�C�:C■■■��
.2 .3 .5 1 'S 2 3 5 10 20
VELOCITY IN FEET PER SECOND
FIGURE 3-2. ESTIMATE OF _AVERAGE FLOW VELOCITY FOR
"i USE WITH THE RATIONAL FORMULA.
*MOST FREQUENTLY OCCURRING "UNDEVELOPED."
LAND SURFACES IN THE DENVER REGION.
REFERENCE: "Urban Hydrology For Small Watersheds" Technical
Release No. 55, USDA, SCS Jan. 1975.
5 -1-84
URBAN DRAINAGE & FLOOD CONTROL DISTRICT
No Text
Standard Form SF-9
Calc'ed.By: AVE
Date: 12-94
Checked By: FDB
J.L. West, Tract in the NW 1/4 Section, 18-7-68
Storm Drainage System Design
(Rational Method Procedure)
Job N o. 542
Project: J.L. West
Design Storm:2/ 10 / 100 Year
J.L. West is on the Southeast comer of Lemav and Riverside NOTE: TOC computations include overland, channel
• •
r,-
L-A
December 1994
Time Of Concentration/ Intensity Calculations
For: Developed Area for J.L. West
By: Stewart and Associates
T() = 1.87(l.1 -C*CQD ^ 1.2 (S - 1/3)
T(c) = Length / (Velocity 60)
Yard slopes are assumed to be 2% unless otherwise indicated.
0.58 = Runoff (C) for Basin
Sub -Basin Type Flow Length Slope Time (Ti) Channel Time (Tt) Total Time Comments
M sit ... ........
Y.
....... ...... ....... ..........
(feet) percen (min) Vel. (fps) (min) TOC,:(mih)j
t)
Historic Overland 185.0 0.51 16.7 2-yearTOC .1952
Grass Channel 0.0 0.01 0.0 0.0 3 42 0
... . ....... . .
Concrete Channel 170.01 1.01 2.0 1.4
0.20 = Runoff (C) for Basin
NOTES: Intensities are based
on information from the
City SDDCCKA Fin R-P 1
Developed A
Overland
20.01
1.01
7.51
... 10 ......
K
�ras Channel 1
0.01
1.01
1
0.01
0.1
92.1
10-yearTOC 1
�14.55:L:��::
:10.-.,...
0 cri
C C oncrete Channe�
195.01
1.01
1
2.01
161.:::.
...
H-I 47 16],:
10110
. .... .. 10
Future Total
Developed A
00 yr
Developed B
0.61 = Runoff (C) for Basin
Overland
45:0
1.0
6.11
.::2,75*,--.
Z,
Grass Channel
1 0.01
0.01
0.01
0.01
-ZO]
10-year TOC 11
4 75
104. c
I Concrete Channel
225.01
1.01
1 2.01
1.91
0.64 = Runoff (C for Basin
Overland
45.01
1.01
5.81
Grass Channel
0.01
0.01
1 0.01
0.0
1 10 yearTOC
434
10.
I Concrete Channel
225.01
1.01
1 2.01
1.9
.4
Future Total
..yr.. .......
0.25 = Runoff (C for Basin
Overland
20:0�-
1.0
1 7.11
8 7
Grass Channel
0.01
0.01
1 0.01
0.0
4 63
10 r
Concrete Channe
195.01
1.01
1 2.01
1.6
100 -year TOC
7.23
1W
0.76 = Runoff (C) for Basin
Overland 45:0:T-
1.0
4.21
rT7777M
Grass Channel 1 0.01
0.01
0.01
0.0
6.1
I
I Concrete Channel 225.01
1.01
1 2.01
1.91
100-year TOC
7.66
100-
0.80 = Runoff (C) for Basin
Overland 45.�O
1.0
3.81
1
77777771
Grass Channel 1 0.01
0.01
0.01
0
0.d
I Concrete Channel 225.01
1.01
2.0
1.9
100-year TOC
SITE HYDROLOGY FOR
J.L. WEST
PROPERTY NW 1/49
S.E. CORNER LEMAY & RIVERSIDE
December 1994
COMPOSITE RUNOFF CALCULATIONS
FOR J.L. West
By : Stewart and Associates b:\compositwk3
Area
"C"I Area
0.95
SUMMARY OF BASINS
NnTF-
N
3,200.0
640.0 0.20 111
Develo ed A
::i:<BASIN
36,514.0
22,238.3 - 0.61
--:�BASIN
39.714.0
25.510.8 0.64
Future
0.0
0.0
N/A = Total Construction Area N/A = Composite Site Runoff Coefficient
NOTE : — All composites are based on the equation in 3.1.6 SDDCCS Manual
BASIN CONSTITUENTS FOR
J.L. WEST
PROPERTY NW 1/49
S.E. CORNER LEMAY & RIVERSIDE
PAGE 26
0.40
0.35
0.30
0
0.25
0.20
O.Z
0.10
0. ff,
ESTABLISHED GRASS AND C-FACTORS
FORT COLUNS, COLORADO
..............
.............
.............
.............
.............
..............
.............
............
....... ....
.............
.............
I .............
.............
....
.............
.. .........
...............
....................
.............
.............
.............
.
. ......
.............
.............
.......
.............
.
...
.............
.............
.............
....
...
.............
-- ------
............
.............
............
.......... *'
.............
. .
.... . ......
.............
.............
.............
..........
.............
.............
..............
.............
......
.............
.............
.........
...... ....
.... . .....
..
0 20 30 40 50 60 70 80 90 100
ESTABUSHED CRASS GROUND- COVER (7)
FIGURE 5.1
PAGE 24
Table 5.2 C-Factors and P-Factors for Evaluating EFF Values.
Treatment C-Factor P-Factor
BARE SOIL
Packed and smooth . . . . . . . . . . . . 1.00 1.00
Freshly disked . . . . . . . . . . . . . . 1.00 0.90
Rough irregular surface . . . . . . . . . 1.00 0.90
SEDIMENT BASIN/TRAP. . . . . . . . . . . . . . 1.00 0.50(1)
STRAW BALE BARRIER, GRAVEL FILTER, SAND BAG. 1.00 0.80
SILT FENCE BARRIER . . . . . . . . . . . . . . 1.00 0.50
ASPHALT/CONCRETE PAVEMENT. . . . . . 0 0.1 1.00
ESTABLISHED DRY LAND (NATIVE) GRASS. . . See Figure' 1.00
SOD GRASS. . . . . . . . . . . . . . . . . . 0.01 1.00
TEMPORARY VEGETATION/COVER CROPS . . . . . . . 0.45(2) 1.00
HYDRAULIC MULCH @ 2 TONS/ACRE. . . . . . . 0.10(3) 1.00
SOIL SEALANT . . . . . . . . . . . . . . . 0.01-0.60(4) 1.00
EROSION CONTROL MATS/BLANKETS. . . . . . . . . 0.10 1.00
HAY OR STRAW.DRY MULCH 103- A O
After planting grass seed, apply mulch at
a rate of Z tons acre minimum) and adequately
anchor, tack or crimp material into the soil.
Maximum
Slope
Length
(q)
(feet)
1
to
5
400 . . .
. . . . ... 0.06
1.00
6
to
10
200 . . .
. . . . . . 0.06
1.00
11
to
15
150 . . .
. . . . . . 0.07
1.00
16
to
20
100 . . .
. . . . . . 0.11
1.00
21
to
25
75 . . .
. . . 0.14
1.00
25
to
33
50 . . .
. . . . . . 0.17
1.00
>
33
35
0.20
1.00
NOTE:
Use
of other
C-Factor or P-Factor values reported
in this
table
must be
substantiated
by documentation.
(1) Must be constructed as the first step in overlot grading.
(2) Assumes planting by dates identified in Table 7.4 thus dry
or hydraulic mulches are not required.
(3) Hydraulic mulches shall be used only between March 15 and
May 15 unless irrigated.
(4) Value used must be substantiated by documentation.
Effectiveness Calculation
Project: LS Standard Form B
By: Stewart & Associates Completed: ' P,141
103 S. Meldrum
Fort Collins, Colorado 80521 Date: It
Erosion Control
Method
C— Factor
Value
Y — Factor
Value
Conunenis:
GMZ; i-
koo
D-'?O
SLUT rtQ
1 •o0
0.5�
�r �yE�aNe Gauss0.
o
No�� �rKi. 1�SNQQ,Ftn� ��2ia:.
1�a�uc� �oc Ciao ._,ic
30 ooaS� - vNDMe 1000 S¢.
�-'Ooq
HDI/SF—B:1989
STEWART$,�S..JCIATE$ PH. 482 933D1RFAX 482 938OLLINS, CO 80521
Consulting Engineers and Surveyors
By: AU Q Date: 11- 3 - Client: 7 A- W e`T Sheet No. of
Project: 2 nF Ce�"C:, i �I S
Subject: SE7e�<z:
I.
I
I
III I,
I I E i
I I
I
I• i I I I I I i _'
lTE_ PrI, lht L?It1v/i+22_+_�F_�i1�E FLor�w2q
Au(L'W��. � j,YR��i �D. ...;le-•.�5'is7�cTloi� .`Wig i �(;E �A
�a� e2 I I� f C Cr�siwc�lo U- t U' c IILSS TH A i
I I
l,L i Y'�-Z I 1�I i_-117�.P'�'51
I I
I I,
A is( t�. 1ta- o.>i4 1 S0.» 4i C)es .Slag or-; sip
I
_O;c_i_r3�0C�- j�vNO�nno.i i
S..1.1�1h�Q Tr�i �P iL (° i
ODD; .mot Ll.
...CjZ.ao�cc...
��
SINCCu(Z,`ialCM' i�izS C(�itc D+��s�ll Fo' �-
I I � ,
L i4Z INl, t'(�
`� i zr i Ft) (-Lw
I
i
ili�!I,
II!!i
it
Ill.l�
I I
�I
I
I..
I
I I
,I
I I
I
I I
i
I
I
I
lil
I I
l
I I ( I
!I,I
�Illil
I
i
Vo
FLOW
LENGTH
(FT)
�100
200
300
400
500 .
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2500
3000
3500
4000
4500
5000
PERFORMANCE STANDARDS FOR FORT COLLINS, COLORADO
-- - --- ----------------------- ----------------------------------------------------------
SLOPE (%)
-
0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 6.0 7.0 8.0 9.0 10.0 20.0 30.0 40.0 50.0
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --------------------
70.9 74.6 76.8 78.4 79.5 80.3 81.1 81.6 82.1 82.5 83.0 83.4 83.6 83.8 8
72..0 76.3 78.2 79.5 80.5 81.2 82.1 82.5 82.8 83.2 83.6 83.9 84.0 84.2 8
72.4 77.0 78:8 80.0 80.9 81.6 82.5 82.8 83.1 83.5 83.8 84.1 84.2 84.3 8
72.6 77.4 79.1 80.3 81.2 81.8 82.7 83.0 83.3 83.7 84.0 84.2 84.3 84.4 8
72.7 77.7 79.4 80.5 81.3 81.9 82.8 83.1 83.4 83.8 84.1 84.3 84.4 84.5 8
72.8 77.9 79.5 80.6 81.4 82.0 83.0 83.2 83.5 83.9 84.1 84.3 84.4 84.5 8
72.8 78.0 79.-7 80.8 81.5 82.1 83.0 83.3 83.5 84.0 84.2 84.4 84.5 84.5 8
72.7 78.1 79.7 80.& 81.6 82.2 83.1 83.4 83.6 84.0 84.2 84.4 84.5 84.6 8
72.7 78.2 79.8 80.9 81.7 82.2 83.2 83.4 83.6 84.1 84.3 84.4 84.5 84.6 8
72.7 78.3 79.9 81.0 81.7 82.3 83.2 83.5 83.7 84.1 84.3 84.4 84.5 84.6 8
72.6 78.3 79.9 81.0 81.7 82.3 83.3 83.5 83.7 84.1 84.3 84.5 84.6 84.6 8
72.6 78.4 80.0 81.0 81.8 82.3 83.3 83.5 83.7 84.2 84.3 84.5 84.6 84.6 8
72.6 78.4 80'.0 81.1 81.8 82.4 83.3 83.6 83.8 84.2 84.4 84.5 84.6 84.6 8
72.5 78.5 80.1 81.1 81.8 82.4 83.4 83.6 83.8 84.2 84.4 84.5 84.6 84.7 8
72.4 78.5 80.1 81.1 81.9 82.4 83.4 83.6 83.8 84.2 84.4 84.5 84.6 84.7 8
72.4 78.5 80.1 81.1 81.9 82.4 83.4 83.6 83.8 84.2 84.4 84.5 84.6 84.7 8
72.3 78.5 80.1 81.2 81.9 82.4 83.4 83.6 83.8 84.3 84.4 84.5 84.6 84.7 8
72.3 78.6 80.1 81.2 81.9 82.4 83.4 83.7 83.8 84.3 84.4 84.5 84.6 84.7 8
72.2 78.6 80.2 81.2 81.9 82.5 83.5 83.7 83.9 84.3 84.4 84.5 84.6 84.7 8
72.2 78.6 80.2 81.2 81.9 82.5 83.5 83.7 83.9 84.3 84.4 84.6 84.6 84.7 8
71.9 78.6 80.2 81.3 82.0 82.5 83.5 83.7 83.9 84.3 84.5 84.6 84.7 84.7 8
71.6 78.7 80.3 81.3 82.0 82.5 83.6 83.8 84.0 84.4 84.5 84.6 84.7 84.7 8
71.4 78.7 80.3 81.3 82.0 82.6 83.6 83.8 84.0 84.4 84.5 84.6 84.7 84.7 8
71.1 78.6 80.3 81.3 82.0 82.6 83.6 83.8 84.0 84.4.84.5 84.6 84.7 84.8 8
70.9 78:6 80.3 81.3 82.0 82.6 83.7 83.9 84.0 84.4 84.6 84.6 84.7 84.8 8
70.6 78.6 80.3 81.3 82.0 82.6 83.7.83.9 84.0 84.4 84.6 84.7 84.7 84.8 8
------------------------
4.0
84.7
84.8
84.9
84.9
4.3
84.8
84.9
84.9
84.9
4.4
84.8
84.9
84.9
85.0
4.5
84.8
84.9
84.9
85.0
4.6
84.9
84.9
85.0
85.0
4.6
84.9
84.9
85.0
4.6
84.9
84.9
85.0
4.6
84.9
84.9
85.0
4.7,84.9
84.9
85.0
4.7
84.9
84.9
85.0
4.7
84.9
84.9
4.7
84.9
84.9
4..7
84.9
85.0
4.7
84.9
85.0
4.7
84.9
85.0
4.7- 84.9
4.7 84.9
4.7 84.9
4.7 84.9
4.7 84.9
4.8
4.8
4.8
4.8
4.8
4.8
Rainfall Performance Standard Evaluation
J.L. Wat 7
Project: S. �. CIM ,a (F } 21 �q, bE Standard Form A
By: Stewart & Associates Completed: N—C
103 S. Meldrum
Fort Collins, Colorado 80521 Date: I l / 3 / l
Developed
Subbasin
Erodibility
Zone
Asb
acres
Lsb
feet
Ssb
%
Lb
feet
Sb
%
PS
%
�t
t-10DC-ZIk-%F
Q ALL.
U.i.1
1�
C�,�
-71 ,0
HDI/SF—A:1989
STEWART&,S.,JC(ATES 10 S. ME 3DiFFAXFORT gOLLINS, CO80521
Consulting Engineers and Surveyors
By: Date: Client: 5•L• LJP-S i Sheet No. I of f
Project: ILa7i- N-NzVb Jr of p.,
Subject:
�•_�,.IAC.C43$�l�S4�.
} I
I I I, II,I I�. I il�lll I
I
Sig
;
' I
i ( I III: II
I ;
II- !� I I it j�lilillil';�,
I ' ;
i I
,
, I
I I I j
•• CONSTRUCTION SEQUENCE
PROJECT:
• STANDARD FURI.1 C
SEQUENCE. FOR 19 iS ONLY COMPLETED BY: DATE: 11 - Z-14
i.._icate by use of a bar line or symbols when erosion control measures will be installed.
Major modifications to an approved schedule may require submitting a new schedule for
approval by the City Engineer.
YEAR I 5S
MONTH�_�?__
OVERLOT GRADING � � ! ;. I - i
---{
WIND EROSION CONTROL
Soil Roughing
f
Perimeter Barrier
Additional Barriers {
Vegetative Methods
Soil Sealant
Other
RAINFALL EROSION CONTROL
STRUCTURAL:
Sediment Trap/Basin
Inlet Filters
Straw Barriers
Silt Fence Barriers
Sand Bags
Bare Soil Preparation
Contour Furrows
Terracing
Asphalt/Concrete Paving
Other
VEGETATIVE:
Pennanent Seed Planting
Mulching/Sealant
Temporary Seed Planting
-Sod Installation
Nettings/Mats/Blankets
Other I
---------------------------------
�i
I
I �
TRUCTURES: INSTALLED .BY 6 .0 . MAINTAINED BY
EGETATION/MULCHING CONTRACTOR �� Pt
ATE SUBMITTED \\ -14 APPROVED BY CITY OF FORT COLLINS ON
01 •-C:1989
i
'I
it
�I
EROSION CONTROL CALCULATION FOR
J.L. WEST
PROPERTY NW 1/4,
S.E. CORNER LEMAY & RIVERSIDE
EROSION CONTROL REPORT
The 0.91 acre site will not require any special means to
control potential for wind and rainfall erosion. Moderate wind and
moderate rainfall erodibility characterize the project area. The
site is surrounded by existing developed property that will need to
be protected during construction activity. This protection will
take the form of structural method identified in the SDDCCM.
Highest exposure to erosion during the construction will be at
the point of rough grading for the parking area. Before any
construction begins, a silt fence will be installed around the
perimeter of the project with a gravel inlet filter placed at the
Lemay Street curb inlet. These factors alone will suffice in
providing the performance standard, 71.0 percent, calculated for
the site. The effectiveness of these measures will be 94.8 percent,
well above what is required. With the accelerated construction
generally incorporated for this type of project no concern has
arisen because of erosion concerns. Please reference the erosion
calculations included as part of this total report submission
package.
Page 5
Final Storm Drainage Report
J.L. West
CONCLUSIONS
This use -by -right project does not present any concerns to the
adjacent land owners or land use. Detention is being provided
onsite with the undetained areas being subtracted at the 100-yr
rate from the 2-yr allowable historic release rate. No records are
available regarding the pipe network on the East side of Lemay.
This methodology will provide a level, of confidence that the
existing pipe network will not be overwhelmed in either the 2-yr or
100-yr events.
Should questions arise during your review for approval of this
storm drainage design please feel free to contact Alex Evonitz or
myself so we may help in your understanding.
Respectfully,
Richard A. Rutherford, P.E. & L.S. # 5028 qF R
• cs
5028 _
Page 4
Final Storm Drainage Report
J.L. West
DETENTION
A detention pond is being included,in the design of the J.L.
West property. The pond is being sized to account for future
development which has been conceptually shown by the architect.
Using the FAA method to establish the pond size, and the
2-yr historic rate minus the 100-yr undetained runoff led to a
volume of 3,702 cu.ft. being required. Under future condition the
runoff coefficient increased from the current developed value. This
increase went from a weighted value of 0.61 to a future value of
0.64. Weighting of these values is following the methods outlined
in the SDDCCM.
Inlet control is being used to regulate the outlet flow rate.
The 0.9 cfs was the result of the calculation 1.03 cfs(2-yr site
historic) minus the undetained (100-yr) 0.13 cfs equaling the 0.9
cfs rate. The pond release will be directed into the existing curb
inlet as mentioned, with a 12-in ADS pipe conveying the flow. No
information is available regarding the actual pipe network going to
the Poudre River, but this design method is sufficiently
conservative to assure no complications.
Page 3
Final Storm Drainage Report
J.L. West
There is a 12-inch outlet pipe exiting this inlet, that releases
into the Poudre River. The river is ± 500-ft north of the project
area and crosses Lemay. This inlet will be the point of release for
the newly constructed detention pond on this project. A new 12-in
ADS pipe will be connected to this inlet that will be installed as
the outlet to the detention pond. The following table is a summary
of the site hydrology:
HYDROLOGY SUMMARY TABLE J.L. WEST
BASIN
C
Q10 (cfs)
TOC(min)
Q100(cfs)
TOC(min)
COMMENTS
HISTORIC
0.58
* 1.0
18.1
N/A
N/A
* 2-YR (Q)
DEV."A"
0.25
0.06
9.2
0.13
8.7
UNDETAINED
DEV."B"
0.76
2.43
8.0
4.89
6.1
DETAINED
"UT Z; rur.ure aevelopmenti nets peen 111u.LUUeU ror ueLenLlon sizing,
and the release rate has been adjusted down for the 100-yr
undetained.
HYDRAULICS
No specific hydraulic design will be a part of this report.
The only hydraulic element that will be considered is the orifice
sizing on the outlet from the new pond. The orifice size will be
2.38-in radius for a round opening with the available driving head
at the pond HWL of 4956.95-ft. Because of the historic condition of
the site and the inability to identify specifics associated with
the piping to the Poudre River the approach taken is within the
criteria of the SDDCCM.
Page 2
Final Storm Drainage Report
J.L. West
HYDROLOGY
Historic hydrologic conditions on the site have been
established using the roofing company as existing. Years before the
improvements were made at the Riverside, and N. Lemay intersection
that land use, building and outdoor storage, existed. Using
information from topography collected in. 1980, the building was
6734-sq. ft. and the gravel covered the entire site. This led to a
historic runoff coefficient of 0.58 and a time of concentration
(TOC) for historic conditions of 18.1 minutes. Using "heavy soils"
with slopes of less than 2 percent, the Rational Method yielded
2-year direct runoff of ± 1.0 cubic feet per second (cfs). This
runoff was released as sheet flow into the flowlines of Riverside
and Lemay. Detention will now be provided for this site allowing
nothing greater than the 2-year historic mentioned.
Following construction of the current proposal and
anticipating the future development, the Rational Method showed
flows of 2.4 cfs and 4.9 cfs for the 10 and 100 year events
respectively. Important to note is that these runoff rates are
based on the additional parking and a second small structure
suggested on the architectural plan. Detention will be provided
with releases directed into the existing storm drainage collection
system along Lemay. At a location approximately 100-feet South of
the Lemay & Riverside intersection, on the East side of Lemay, is
a 3-foot combination inlet.
FINAL STORM DRAINAGE REPORT
FOR
NW 1/4 SECTION 18-7-68
Southeast corner of Lemay and Riverside
GENERAL SITE
The project proposed for this site is a drive thru restaurant
on the 0.91 acres parcel. This parcel is zoned C. commercial, and
the restaurant use proposed is consistent with current land use
planning. Land use is considered a "use -by -right," by the City of
Fort Collins Planning Department. Historically indoor storage for
B&M Roofing was housed in a metal building onsite, including a
gravel parking lot. In approximately 1991 the steel building was
dismantled and only a gravel parking along with some concrete pads
remain.
Adjacent land uses include the Fort Collins Firestone Tire
Store on the South off Lemay Avenue (Lemay) and Autobahn West car
repair shop on the East addressed off Riverside Avenue (Riverside).
Both existing businesses have been graded and built so that no
runoff from offsite will be directed onto this project. Following
the dismantling of the B&M Roofing facilities the site was left
with a rough irregular surface that has become overgrown with
dryland grasses and weeds.
I
r.
• •
-11 _
ss �-
bp
PROJECT , 9
SITE
-OUT
4*1
• � tip`
i - RH _ T •.
J • 1 � :I I'll �_� 1
.k(. �{
IG
iCCU
N
V, 1
Final.Storm'Drainage Report
for
J.L. WEST,
A TRACT OF LAND IN THE' NW 1/4;,
SECTION 18-7-68
Q U a
November 1994
^}Id
�r•$b a3M� f�`�`Z1.
yr.�.,..�r11.�,.......:. •'I': fN � ,,,. ' I I PuiiP�J�{
Wj'/Ill'1.'�� 1'II 141•..rl�llli 11 �� .t
ii x
Stewart & Associates
Consulting Engineers and Surveyors
103 South Meldrum Street
Fort Collins,. Colorado 80521
(303) 482-9331