Loading...
HomeMy WebLinkAboutNEW BELGIUM, 4TH FILING, PACKAGING HALL & BUCKINGHAM ST. - PDP & AMENDED ODP - 1-95F - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETING`V�4-'I 6/t,6O4 AME0"7'iNG /.e/ c') 4 G S �yfrrt� ��otiEr.t &,+A fN 6 A"I Oe-v. ►I�'c..,C-. he Je►AVA IV, * New%AKG wi&%(A tv -,lnc.. 3elj, AAC:1,3 Qew-A—) V IAA ►.� M G -m-r S�.J �►l� t�-T� BdIL.1ti+�S �oNN �C,S 11.30 aPfa 12. What about product quality? Will transporting beer through the overhead pipe damage the quality? A. We are very careful to take care of the quality of the beer. Straight piping does not impact quality of beer. However, bends in line will. Engineers are out of Kansas City. 13. The design concept looks very energy efficient with lots of indirect light for the interior space. A. We are working with Light and Power on energy conservation . In addition, the overhang will accommodate wildlife and enhance design feature of structure and will provide a protected walkway for employees. 14. 1 have noticed that there are prairie dogs on property. A. Yes there are two groups of prairie dogs on site at this time but since they are further east than planned development, construction should not be issue at this time. 15. There is current construction occurring on site. When will this be completed? A. We are constructing the new Process Water Treatment Plant. We expect to be operational in April 2006. 16. Which directions will trucks travel to gain ingress and egress to the packaging hall? I'm concerned about trucks in the neighborhood. A. We are planning a truck route so that access on Buckingham Street is as far east as possible to avoid impacting the neighborhood. Trucks presently use Linden and will probably continue to do so as it ties into Riverside which is the main truck route through the City. 17. What about the irrigation ditch that runs along Buckingham Street? A. We are working with the ditch company and will be placing ditch in a pipe. 18. What do you expect to build on the east edge of the site along Lemay? A. We don't know at this time. The zoning is Industrial but no final decisions have been made. 3 4. How many spaces in the new parking lot? A. The new lot will have 121 parking spaces. The lot has been located as far east as possible to minimize impacts to neighborhood. 5. What about public improvements on Buckingham Street? A. N.B.B. will construct public improvements on the north side of Buckingham Street east to Lemay. This may include an oversized sidewalk of eight feet in fulfillment of the Northside Neighborhoods Plan to provide a safe and direct connection from the neighborhoods to downtown. This may also include new curb and gutter and on -street bike lanes. The Transportation Impact Study has not been completed at this time and will help guide us with the final engineering improvements. 6. What about on the south side of Buckingham? A. This area may remain in an interim improvement until the abutting property develops. 7. Any improvements to Lemay Avenue? A. There may be a need for some improvements to the Lemay/Buckingham intersection, especially for bikes and pedestrians. Since we are not developing along the Lemay frontage, we may not construct any improvements unless specifically required by the T.I.S. 8. Any improvements to Linden Street? A. This frontage has been improved with earlier phases. We don't expect any further improvements along Linden. 9. Any development plans for the east end of property along Lemay? A. We have no immediate plans for eastside of the property. 10. Any changes required for the Overall Development Plan? A. Yes, the ODP will need to be changed. For example, the community center is still in plans but will be moved from the original location. 11. Will there be new employees for the packaging hall? A. No new employees will be added at this time. We are just shifting current employees to the new facility. M • NEW BELGIUM NEIGHBORHOO MEETING New Belgium Packing Hall Neighborhood Meeting June 14, 2005 Attendees: Ted Shepard, Chief Planner Doug Moore, Natural Resource Planner Angie Milewski — BHA Design Luke Oldenburg — BHA Design Jenn Orgolini — New Belgium Brewery Jen Allen — New Belgium Brewery QUESTIONS, CONCERNS, COMMENTS 1. With all the new impervious surface associated with the new building and parking lot, what about stormwater detention? A. There will new and enlarged stormwater detention pond. 2. Have you figured out what to do with the lime deposits? A. The lime deposits will primarily remain undisturbed. With the Process Water Treatment Plant, we were able to dilute some of the lime into the landscape materials that make up the berms for the treatment ponds. We hope to continue to dilute the material but there will still be a significant amount of material remaining. Although lime does have a use, it is very difficult to transport. In the short term, the lime deposits will remain in place until we can find a practical use for it. 3. What is the height of the building? A. At the south edge, the roof will be 22 feet in height. It will then slope up towards the north to a height of 48 feet. Then the height with step back again to the north where it will not visible from neighborhood to a height of 56 feet.