12. What about product quality? Will transporting beer through the overhead
pipe damage the quality?
A. We are very careful to take care of the quality of the beer. Straight piping
does not impact quality of beer. However, bends in line will. Engineers
are out of Kansas City.
13. The design concept looks very energy efficient with lots of indirect light
for the interior space.
A. We are working with Light and Power on energy conservation . In
addition, the overhang will accommodate wildlife and enhance design
feature of structure and will provide a protected walkway for employees.
14. 1 have noticed that there are prairie dogs on property.
A. Yes there are two groups of prairie dogs on site at this time but since they
are further east than planned development, construction should not be
issue at this time.
15. There is current construction occurring on site. When will this be
completed?
A. We are constructing the new Process Water Treatment Plant. We expect
to be operational in April 2006.
16. Which directions will trucks travel to gain ingress and egress to the
packaging hall? I'm concerned about trucks in the neighborhood.
A. We are planning a truck route so that access on Buckingham Street is as
far east as possible to avoid impacting the neighborhood. Trucks
presently use Linden and will probably continue to do so as it ties into
Riverside which is the main truck route through the City.
17. What about the irrigation ditch that runs along Buckingham Street?
A. We are working with the ditch company and will be placing ditch in a pipe.
18. What do you expect to build on the east edge of the site along Lemay?
A. We don't know at this time. The zoning is Industrial but no final decisions
have been made.
3
4. How many spaces in the new parking lot?
A. The new lot will have 121 parking spaces. The lot has been located as far
east as possible to minimize impacts to neighborhood.
5. What about public improvements on Buckingham Street?
A. N.B.B. will construct public improvements on the north side of Buckingham
Street east to Lemay. This may include an oversized sidewalk of eight
feet in fulfillment of the Northside Neighborhoods Plan to provide a safe
and direct connection from the neighborhoods to downtown. This may
also include new curb and gutter and on -street bike lanes. The
Transportation Impact Study has not been completed at this time and will
help guide us with the final engineering improvements.
6. What about on the south side of Buckingham?
A. This area may remain in an interim improvement until the abutting
property develops.
7. Any improvements to Lemay Avenue?
A. There may be a need for some improvements to the Lemay/Buckingham
intersection, especially for bikes and pedestrians. Since we are not
developing along the Lemay frontage, we may not construct any
improvements unless specifically required by the T.I.S.
8. Any improvements to Linden Street?
A. This frontage has been improved with earlier phases. We don't expect
any further improvements along Linden.
9. Any development plans for the east end of property along Lemay?
A. We have no immediate plans for eastside of the property.
10. Any changes required for the Overall Development Plan?
A. Yes, the ODP will need to be changed. For example, the community
center is still in plans but will be moved from the original location.
11. Will there be new employees for the packaging hall?
A. No new employees will be added at this time. We are just shifting current
employees to the new facility.
M
•
NEW BELGIUM NEIGHBORHOO MEETING
New Belgium Packing Hall
Neighborhood Meeting June 14, 2005
Attendees:
Ted Shepard, Chief Planner
Doug Moore, Natural Resource Planner
Angie Milewski — BHA Design
Luke Oldenburg — BHA Design
Jenn Orgolini — New Belgium Brewery
Jen Allen — New Belgium Brewery
QUESTIONS, CONCERNS, COMMENTS
1. With all the new impervious surface associated with the new building and
parking lot, what about stormwater detention?
A. There will new and enlarged stormwater detention pond.
2. Have you figured out what to do with the lime deposits?
A. The lime deposits will primarily remain undisturbed. With the Process
Water Treatment Plant, we were able to dilute some of the lime into the
landscape materials that make up the berms for the treatment ponds. We
hope to continue to dilute the material but there will still be a significant
amount of material remaining. Although lime does have a use, it is very
difficult to transport. In the short term, the lime deposits will remain in
place until we can find a practical use for it.
3. What is the height of the building?
A. At the south edge, the roof will be 22 feet in height. It will then slope up
towards the north to a height of 48 feet. Then the height with step back
again to the north where it will not visible from neighborhood to a height of
56 feet.