[9/1/05] Maintain the required landscape/utility separation distances on the
landscape plans.
See the site, landscape and utility plans for other comments.
Comments from Current Planning
1. The Lighting Plan indicates that two of the pole -mounted parking lot fixtures are
to feature a "curvilinear "cut-off luminaires. These are not allowed. Such
fixtures must feature full cut off with flat lens luminaires.
2. The cut sheet describing the Kim Lighting fixtures (pages 1 — 6) indicates that
the lamp types are the E2 and E3 as called out in the Luminaire Schedule on
the Lighting Plan. It appears that these pages are describing fixtures labeled as
E1 and E2.
3. The cut sheet describing the UCMH3 50-watt should indicate that it is
describing the fixture labeled as E3.
4. Be sure to indicate the mounting pole height of the parking lot fixtures.
5. The fixtures labeled as P6 face south. Be sure to indicate that these fixtures
will be sharp cut-off and down -directional. If they are to be angled, they can
only be angled to the north.
6. The fixtures labeled as W8 will also be visible from the neighborhood and must
also be sharp cut-off and down -directional. Please note that these fixtures will
be column -mounted.
7. On the Landscape Plan, please indicate the mitigation schedule for the riparian
forest.
8. On the Architectural Elevations, we are missing sheet 1 of 2.
9. On the Site Plan, please label the neighborhood streets and call out the width of
the sidewalk connecting the southwest corner of the building to Buckingham
Street.
10. There are no comments on the Amended O.D.P.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Page 5
Topic: Water Quality
Number: 4 Created: 8/29/2005
[8/29/05] The plan calls for porous concrete pavement and interlocking concrete
pavers. These alternative water quality enhancement features are welcome and
appreciated. A water quality outlet structure would still be required at the pond,
however a 12 hour residence time rather than the standard 40 hour extended
detention time can be used in calculating water quality volume.
Department: Transportation Planning Issue Contact: David Averill
Topic: General
Number: 8 Created: 8/30/2005
[8/30/05] The TIS as submitted is incomplete. There is a narrative that addresses
Bike/Ped/Transit LOS but none of the worksheets to support those conclusions are
included. Please have your consulting traffic engineer contact me directly so that we
can adequately address this issue. Thanks.
Department: Water Wastewater Issue Contact: Roger Buffington
Topic: General
Number: 19 Created: 9/1 /2005
[9/1/05] We will attempt to work with the pipe bridge as shown. I will check with the
City Attorney's office to see if there may be any special requirements such as hold
harmless agreements, etc.
Topic: Utility plans
Number: 17 Created: 9/1 /2005
[9/1/05] Will this domestic service be strictly for the packaging facility?
Number: 18 Created: 9/1 /2005
[9/1/05] Is the intent to keep the wastewater from this building separate from the
brewing process waste?
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility plans
Number: 12 Created: 9/1 /2005
[9/1/05] The proposed water meter may not be located in the detention pond.
Contact Terry Cox at 221-6700 for current city of Fort Collins meter pit details.
Number: 13 Created: 9/1 /2005
[9/1/05] Pothole the existing 24-inch ELCO water line and the City 4-inch water line
now to finalize the fire line and water service designs. Will the fire line and water
service need to be lowered as it crosses the detention pond? Will there be a
conflict between the fire line/water service and the proposed irrigation line?
Number: 14 Created: 9/1 /2005
[9/1/05] Maintain 4 feet of cover over the existing sanitary sewer main as it crosses
the proposed detention pond.
Page 4
pond may need to be lined or landscaped appropriately. Please specify at what
slope that swale is currently designed at.
The outlet from the subdrain in the parking lot into the pond is currently shown to be
rip -rapped, since the velocities will be small, can rip rap be eliminated and the use of
softer erosion control methods such as mats or fabrics be used instead?
Topic: Drainage Plan
Number: 5 Created: 8/29/2005
[8/29/05] Basin 4 has no outlet, however since this basin is limited in geographical
terms and in order to save the existing tree vegetation, and since no added
impervious area contributes to this basin, the no outlet condition will be allowed.
Please adjust planting to accommodate such a condition.
Topic: East parking lot entrance drainage flows
Number: 10 Created: 9/1 /2005
[9/1 /05] Please clarify where the flows from that area will go to, if they are designed
to go to the no outlet basin, which would be allowed as long as that is kept at a
minimum. Please clarify the grades around the entrance.
Topic: Floodplain Comments
Number: 2 Created: 8/29/2005
[8/29/05]
Because the packaging facility and associated chemicals already exist on the site,
per City Code Section 10-46, a non -conforming critical facility can be relocated with
in the same parcel of land and not lose its legal non -conforming status. To
document this, please complete a floodplain use permit ($25 permit fee). The
Hazardous Materials Impact Analysis will be attached to the permit as this
documentation. Contact Marsha Hilmes-Robinson at 224-6036 for questions.
Topic: Irrigation Line
Number: 3 Created: 8/29/2005
[8/29/051 The proposed plan would enclose the existing Coy Ditch irrigation ditch
into a pipe. Please provide a signature on the plans from representatives of the
ditch company.
Topic: Plat
Number: 11 Created: 9/1 /2005
[9/1 /05] Please include the low retention area just to the west of the east parking lot
entrance as a drainage easement.
It is OK to vacate the existing swale easement, and not dedicate a new one for the
new swale as long as all the flows in that swale originate,from New Belgium Brewery
property.
Page 3
Topic: Plat
Number: 28 Created: 9/2/2005
[9/2/05] The Coy Ditch Company will need to sign off on the plat.
Number: 29 Created: 9/2/2005
[9/2/05] The plat indicates an "irrigation easement" which appears to be dedicated
with the plat. As the dedication statement dedicates all easements to the City, it
appears this ditch easement should be indicated otherwise. More than likely, an
easement will need to be dedicated to the Coy Ditch Co. by separate document, with
the recording information provided on the plat.
Topic: Utility plans
Number: 26 Created: 9/2/2005
[9/2/05] The grading plan appears to show with contours that flows are being
directed out of the driveway across the sidewalk in excess of our 750 sq. ft. area
requirement.
Department: Light & Power Issue Contact: Janet McTague
Topic: General
Number.' 7 Created: 8/30/2005
[8/30/05] The existing electric line that crosses the property north of First Street isn't
indicated on the Utility Plan. It isn't really necessary since the 6' easement is shown
as long as the applicant is aware that it exists.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 1 Created: 8/25/2005
[8/25/05] No issues. Nice planting design and project.
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 16 Created: 9/1 /2005
[9/1/05] For safety purposes, lighting the building surrounds and parking lot/drives
are recommended to achieve a minimum of 1.Ofc.
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Detention Pond
Number: 6 Created: 8/29/2005
[8/29/05] Since the site is using innovative water quality features, the City will not
require that the volume for water quality detention be added to the overall required
detention volume. This volume can be combined into the required water quantity
detention volume.
Please specify where the revised detention pond will overflow to and provide a
spillway design. If the detention pond is to serve as a multi use area, please
maintain a minimum 2 % grade across the pond, the swale on the south side of the
Page 2
�„r I STAFF PROJECT REVIEW
City of 1'ort Collins
BHA DESIGN, INC. Date: 09/08/2005
LUKE OLDENBURG
4803 INNOVATION DR.
FORT COLLINS, CO 80525
Staff has reviewed your submittal for NEW BELGIUM BREWERY, PACKAGING
HALL & BUCKINGHAM ST PDP & AMENDED ODP - TYPE II, and we offer the
following comments:
ISSUES:
Department: Engineering Issue Contact: Marc Virata
Topic: General
Number: 20 Created: 9/2/2005
[9/2/05] Please clarify the limits of public improvements on the plans. The 8'
concrete sidewalk along Buckingham is not clear as to how far east it extends.
Number: 21 Created: 9/2/2005
[9/2/05] As offsite work is being shown to the west, a letter of intent from the
property owner is required prior to hearing. Given it is the same owner; I do not
envision this to be an issue.
Number: 22 Created: 9/2/2005
[9/2/05] Please revise the vicinity maps of the plat and site plan to show that the
boundary of this development does not extend to Lemay Avenue.
Number: 23 Created: 9/2/2005
[9/2/05] Show the eastern lot line boundary on the site plan, landscape plan, and
construction plans to verify how the improvements coincide with the eastern
boundary of Lot 1 of this development.
Number: 24 Created: 9/2/2005
[9/2/05] Provide information regarding the under -grounding of the overhead line as it
lies within the proposed street improvements.
Number: 25 Created: 9/2/2005
[9/2/05] Please clarify the site and landscape plan with regards to the Coy Ditch
crossing of Buckingham Street tying into existing drainage pipes. It appears on the
site and landscape plans that an inlet box is proposed within the street.
Number: 27 Created: 9/2/2005
[9/2/05] A letter of intent is required from the Coy Ditch Company for the work
proposed by the development.