Number: 18 Created: 9/1/2005
[9/1/05] Is the intent to keep the wastewater from this building separate from the brewing
process waste?
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility plans
Number: 12 Created: 9/1/2005
[9/1/05] The proposed water meter may not be located in the detention pond. Contact Terry
Cox at 221-6700 for current city of Fort Collins meter pit details.
Number: 13 Created: 9/1/2005
[9/1/05] Pothole the existing 24-inch ELCO water line and the City 4-inch water line now to
finalize the fire line and water service designs. Will the fire line and water service need to be
lowered as it crosses the detention pond? Will there be a conflict between the fire
line/water service and the proposed irrigation line?
Number: 14 Created: 9/1/2005
[9/1/05] Maintain 4 feet of cover over the existing sanitary sewer main as it crosses the
proposed detention pond.
Number: 15 Created: 9/1/2005
[9/1/05] Maintain the required landscape/utility separation distances on the landscape
plans.
See the site, landscape and utility plans for other comments.
Department: Zoning
Topic: zoning
Number: 9
[8/31/05] No Comment
Number: 30
[9/9/05] no comment
Issue Contact: Gary Lopez
Created: 8/31 /2005
Created: 9/9/2005
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
T
Ted Shepard
City Planner
Page 7
[9/1/05] Please include the low retention area just to the west of the east parking lot
entrance as a drainage easement.
It is OK to vacate the existing swale easement, and not dedicate a new one for the new
swale as long as all the flows in that swale originate from New Belgium Brewery property.
Topic: Water Quality
Number: 4 Created: 8/29/2005
[8/29/05] The plan calls for porous concrete pavement and interlocking concrete pavers.
These alternative water quality enhancement features are welcome and appreciated. A
water quality outlet structure would still be required at the pond, however a 12 hour
residence time rather than the standard 40 hour extended detention time can be used in
calculating water quality volume.
Department: Transportation Planning Issue Contact: David Averill
Topic: Buckingham Street Plans
Number: 34 Created: 9/13/2005
[9/13/05] Buckingham Road Improvements planset - show a Type III barricade at the east
end of the 8' walk where it terminates. Thanks.
Topic: General
Number: 8 Created: 8/30/2005
[8/30/05] The TIS as submitted is incomplete. There is a narrative that addresses
Bike/Ped/Transit LOS but none of the worksheets to support those conclusions are inluded.
Please have your consulting traffic engineer contact me directly so that we can adequately
address this issue. Thanks.
Department: Water Wastewater Issue Contact: Roger Buffington
Topic: Buckingham Street Plans
Number: 47 Created: 9/14/2005
[9/14/051 Label the 24-inch water main as a North Weld County Water District main.
Number: 48 Created: 9/14/2005
[9/14/05] In addition the the City 12-inch main, show the existing 4-inch main that extends
to the west from Second Street.
Number: 49 Created: 9/14/2005
(9/14/05] Identify valve boxes and manhole covers that may fall within the milling area and
add appropriate notes on adjustment, etc.
Number: 50 Created: 9/14/2005
[9/14/05] See plans for other,comments.
Topic: General
Number: 19 Created: 9/1 /2005
[9/1 /05] We will attempt to work with the pipe bridge as shown. I will check with the City
Attorney's office to see if there may be any special requirements such as hold harmless
agreements, etc.
Topic: Utility plans
Number: 17
Created: 9/1 /2005
Page 6
owner's private property; Maintenance for such a bio-swale would be the property owners's.
Please note that this concept is welcome by the City and is not being discouraged.
Number: 53 Created: 9/15/2005
[9/15/05] A represenative of the Coy Ditch Company will need to sign off on the plans.
Topic: Detention Pond
Number: 6 Created: 8/29/2005
[8/29/05] Since the site is using innovative water quality features, the City will not require
that the volume for water quality detention be added to the overall required detention
volume. This volume can be combined into the required water quantity detention volume.
Please specify where the revised detention pond will overflow to and provide a spillway
design. If the detention pond is to serve as a multi use area, please maintain a minimum 2
% grade across the pond, the swale on the south side of the pond may need to be lined or
landscaped appropriately. Please specify at what slope that swale is currently designed at.
The outlet from the subdrain in the parking lot into the pond is currently shown to be rip
rapped, since the velocities will be small, can rip rap be eliminated and the use of softer
erosion control methods such as mats or fabrics be used instead?
Topic: Drainage Plan
Number: 5 Created: 8/29/2005
[8/29/05] Basin 4 has no outlet, however since this basin is limited in geographical terms
and in order to save the existing tree vegetation, and since no added impervious area
contributes to this basin, the no outlet condition will be allowed. Please adjust planting to
accommodate such a condition.
Topic: East parking lot entrance drainage flows
Number: 10 Created: 9/1/2005
[9/1/05] Please clarify where the flows from that area will go to, if they are designed to go to
the no outlet basin, that would be allowed as long as that is kept at a minimum. Please
clarify the grades around the entrance.
Topic: F/oodp/ain Comments
Number: 2 Created: 8/29/2005
[8/29/05]
Because the packaging facility and associated chemicals already exist on the site, per City
Code Section 10-46, a non -conforming critical facility can be relocated with in the same
parcel of land and not lose its legal non -conforming status. To document this, please
complete a floodplain use permit ($25 permit fee). The Hazardous Materials Impact
Analysis will be attached to the permit as this documentation. Contact Marsha Hilmes-
Robinson at 224-6036 for questions.
Topic: Irrigation Line
Number: 3 Created: 8/29/2005
[8/29/05] The proposed plan would enclose the existing Coy Ditch irrigation ditch into a
pipe. Please provide a signature on the plans from representatives of the ditch company.
Topic: Plat
Number: 11
Created: 9/1 /2005
Page 5
[9/20/05] KNOX BOX:
Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new
building equipped with a required fire sprinkler system or fire alarm system.
1997 UFC 902.4; PFA POLICY 88-20
Number: 58
[9/20/05] FIRE LINE REQUIREMENT:
Created: 9/20/2005
Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line unless
hydraulic calculations can support a smaller fire line.
Number: 59 Created: 9/20/2005
[9/20/051 HAZARDOUS MATERIALS:
Corrosive, flammable liquids, reactive, or toxic materials (As defined in the Uniform Fire
Code) if used, stored or handled on site must have a Hazardous Materials Impact Analysis
(HMIA) completed and supplied to the Planning Department and the Fire Department.
FCLUC 3.4.5 (C)
Department: Police
Topic: General
Issue Contact: Joseph Gerdom
Number: 16 Created: 9/1/2005
[9/1/05] Building surrounds and parking lot/drives require minimum of 1.Ofc.
Department: Stormwater Utility
Topic: Buckingham Street Plans
Issue Contact: Basil Harridan
Number: 37 Created: 9/13/2005
[9/13/05] Ditch Company will need to sign off on plans. Please add ditch company
signature.
Number: 38 Created: 9/13/2005
[9/13/05] Please clarify what plantings are proposed with the bio-swale.
Number: 39 Created: 9/13/2005
[9/13/05] Please use the concrete sidewalk detail for flows coming off -of Buckingham
Street.
Number: 40
Created: 9/13/2005
[9/13/05] Please provide rip rap at the downstream end of the pipe across Buckingham.
Provide pipe profile. Provide capacity calculations for swale and pipe.
Number: 51 Created: 9/15/2005
[9/15/05] Please provide street and inlet capacity calculations.
If these improvements will be done separately then a separate erosion control plan and
report would be required, otherwise, preferably, these improvements can be incorporated
into the Packaging Hall facility overall erosion control measures.
Number: 52 Created: 9/15/2005
[9/15/05] If the Engineering Department does not grant the varinace to allow the bio-swale
in the right of way, as they indicate in their comments, and the applicant decides to go with
the option of diverting flows off the street into a bio-swale that would be constructed on the
Page 4
[9/2/05] The plat indicates an "irrigation easement" which appears to be dedicated with the
plat. As the dedication statement dedicates all easements to the City, it appears this ditch
easement should be indicated otherwise. More than likely, an easement will need to be
dedicated to the Coy Ditch Co. by separate document, with the recording information
provided on the plat.
Topic: Utility plans
Number: 26 Created: 9/2/2005
[9/2/05] The grading plan appears to show with contours that flows are being directed out of
the driveway across the sidewalk in excess of our 750 sq. ft. area requirement.
Department: Light & Power
Topic: General
Number: 7
Issue Contact: Janet McTague
Created: 8/30/2005
[8/30/05] The existing electric line that crosses the property north of first street isn't
indicated on the Utility Plan. It isn't really necessary since the 6' easement is shown as long
as the applicant is aware that it exists.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 1 Created: 8/25/2005
[8/25/05] No issues. Nice planting design and project.
Department: PFA
Topic: Buckingham Street Plans
Number: 54
Issue Contact: Michael Chavez
Created: 9/20/2005
[9/20/05] REQUIRED ACCESS:
A fire lane is required. The fire lane shall be visible by painting and signage, and maintained
unobstructed. 1997 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC
The criteria for a required fire lane contain several conditions that must be met.
1. The minimum width shall be 20 feet.
2. Inside turning radius shall be 25 feet and outside turning radius shall be 50 feet.
3. Compacted road base shall be used during the construction phase only. The
permanent fire lane shall consist of asphalt or concrete and shall be required to support 40
tons
4. The fire lane shall be platted as an "Emergency Access Easement" on the final plat.
Buildings three stories or more in height must have access to a 30 foot unobstructed access
roadway on at least (1) one side for aerial operations. PFA Policy 85-5 (B)
Number: 55
Created: 9/20/2005
[9/20/051 WATER SUPPLY: Commercial
No commercial building can be greater then 300 feet from a fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway.
Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual
pressure of 20 psi. 1997 UFC 901.2.2.2
Number: 56 Created: 9/20/2005
[9/20/05] SPRINKLER REQUIREMENTS:
This proposed building shall be fire sprinklered.
Number: 57 Created: 9/20/2005
Page 3
Number: 43 Created: 9/14/2005
[9/14/05] Correct the scale label on sheet 4 (1"=50')
Number: 44 Created: 9/14/2005
[9/14/05] At time of final plan, provide cross sections along Buckingham Street at 50'
intervals.
Number: 45 Created: 9/14/2005
[9/14/05] At time of final plan, provide a driveway detail for the easternmost driveway.
Number: 46 Created: 9/14/2005
[9/14/05] Provide flowline curve/line table data for verification. The inset parking narrowing
appears fine bt I'd like to see the radii specified just to be sure.
Topic: General
Number: 20 Created: 9/2/2005
[9/2/05] Please clarify the limits of public improvements on the plans. The 8' concrete
sidewalk along Buckingham is not clear as to how far east it extends.
Number: 21 Created: 9/2/2005
[9/2/05] As offsite work is being shown to the west, a letter of intent from the property owner
is required prior to hearing. Given it is the same owner, I do not envision this to be an issue.
Number: 22 Created: 9/2/2005
[9/2/05] Please revise the vicinity maps of the plat and site plan to show that the boundary
of this development does not extend to Lemay Avenue.
Number: 23 Created: 9/2/2005
[9/2/05] Show the eastern lot line boundary on the site plan, landscape plan, and
construction plans to verify how the improvements coincide with the eastern boundary of Lot
1 of this development.
Number: 24 Created: 9/2/2005
[9/2/05] Provide information regarding the undergrounding of the overhead line as it lies
within the proposed street improvements.
Number: 25 Created: 9/2/2005
[9/2/05] Please clarify the site and landscape plan with regards to the Coy Ditch crossing of
Buckingham Street tying into existing drainage pipes. It appears on the site and landscape
plans that an inlet box is proposed within the street.
Number: 27 Created: 9/2/2005
[9/2/05] A letter of intent is required from the Coy Ditch Company for the work proposed by
the development.
Topic: Plat
Number: 28 Created: 9/2/2005
[9/2/05] The Coy Ditch Company will need to sign off on the plat.
Number: 29
Created: 9/2/2005
Page 2
` STAFF PROJECT REVIEW
Cityof� Fort Collins
BHA DESIGN, INC. Date: 09/21/2005
LUKE OLDENBURG
4803 INNOVATION DR.
FORT COLLINS, CO 80525
Staff has reviewed your submittal for NEW BELGIUM BREWERY, PACKAGING HALL &
BUCKINGHAM ST PDP & AMENDED ODP - TYPE II, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Marc Virata
Topic: Buckingham Street Plans
Number: 31 Created: 9/13/2005
[9/13/05] The variance request regarding the use of .4% flowline grades instead of .5% was
approved on September 8 and an approval letter was sent. Please note the variance
approval on the general notes.
Number: 32 Created: 9/13/2005
[9/13/05] The variance request regarding the elimination of the curb and gutter section for
Buckingham Street was denied on September 9 and a letter explaining this denial was sent.
As a consequence, low points (such as 18+72.13) without inlets/culverts will need to be
relooked at. Perhaps additional discussion should take place as we see options for a
bioswale behind the sidewalk with culverts taking flows from the street (with curb and gutter)
out across the parkway and under the sidewalk as a possibility.
Number: 33 Created: 9/13/2005
[9/13/05] For the low points along the flowline that collect into sidewalk culverts, the culverts
are required to be concrete not metal.
Number: 35 Created: 9/13/2005
[9/13/05] We will need buy off from the utility companies that the 9' utility easement behind
the irrigation easement is acceptable given that the utility easement is no longer joined by
street right-of-way.
Number: 36
[9/13/05] For the Lemay Avenue widening,
4' asphalt shoulder.
Created: 9/13/2005
a 2' gravel shoulder is required in addition to the
Number: 41 Created: 9/13/2005
(9/13/05] The amount of cover over the crossing in which the realigned ditch ties into is less
than standard. That combined with the structure being corrugated metal raises a general
concern. We'd would want to see the corrugated metal pipes removed and replaced with
twin elliptical pipes (RCP?) to achieve better cover and provide a pipe type that is to
standard.
Number: 42 Created: 9/14/2005
[9/14/05] Please show lot lines and PDP boundaries on the street plans (such as to help
illustrate that the sidewalk along Buckingham Street ends at a property line).