Loading...
HomeMy WebLinkAboutNEW BELGIUM, 4TH FILING, PACKAGING HALL & BUCKINGHAM ST. - PDP & AMENDED ODP - 1-95F - SUBMITTAL DOCUMENTS - ROUND 2 - TRAFFIC STUDY0/10,000 Vine St. 30/3,775/10,000—� I, ,20/20/1,000 205/205/1,000 SITE 110/3,670/10,000 10/5,835/10,000 1,�v 90/1,745/10,000 > Logan Ave. 70/19,470/10,000 115/1,615/10,00072 tt M Lincoln Ave. LEGEND: Site— tal Roadway 350/6,755/25,000 = Generated /TrTaoffic Capacity Traffic 20/18, 090/10,000 — 5/8,225/10,000 20/18,395/10,000 Approximate Scak Scale: I'- OW Figure 11 Year 2010 Average Daily Traffic Impacts New Belgium Brewery Expansion (LSC #050700) �N RwoM�b\�%�NaMW�)OD9 ao �Vuve �c�ao T,.w�..mn -r -T- L Appivx1mate Scale Vine St. Scale.- 1'- 1,000' North Access SITE Buckingham St. ogan Ave. /X X XX(/ Lincoln Ave.. Figure 10 LEGEND: Year 2010 Traffic Signal Recommendations Stop Sign New Belgium Brewery Expansion (LSC #050700) / 10 ITO 5 B0 5 5 5 5 , i 5 5� r 5 S�frS 10 60 5 165 110 90 5 5 L S 5 fr10 40 65 30 175 / 5 5 5 5 5 80 \� 90 20 \ 30 \\ 30 5 15 10 , 90 50 130 50 30 5 30 60 LEGEND: 26 _ AM Peak —Hour Traffic --3T PM Peak —Hour Traffic / 715 / 550 55 180 20 1 15 r I L80 155 225 y r 255 40� k240 255 300 25 —i 50 280 285 '� f-155 215 30 40 75 90 20_� r15 80 40 11r 45 t 95 75 ApproxtmateScak 65 175 305 Scale: 1 *- 1,000, Vine St. 850 i i SITE �i1 �0 Buckingham St. 25 5 25 5 � 10 ��� 5 20 5 _ogan Ave. < 5 J 5 5 55� �10 5 t%f in y J BS 5 U 'g rM 60 1 f r 5 a Lincoln Ave. 65 380 15 / 1.070 / 10 10 I 40 20 40 r � 25 15 10 �— 40 40 --► f- 55 115 Figure 9 Year 2010 Total Traffic New Belgium Brewery Expansion (LSC #050700) �q{FO�KI��AYi=��tl111'�M1O��V�M1VPOq. 14 Vun��:naon'4�s�a�v / 89 \ 4 68 9 a 5 _�'r-26 \8 45 8 143 97 89 1 6 5 0 7 38 75 45 154 2 0 2 4 j 74 91 21 19 ` 35 5 23 9 , ` 72 59 ^\� 123 30 26 1%, 24 49 / 160 y 173 210 167 22 � � 49 30 \ 36 20 13 / 86 69 Vine St. SITE 5 4 \I 11 17 14 14 6 �— 6 46 36 y �— 52 108 LEGEND: \ 26 _ AM Peak —Hour Traffic � PM Peak —Hour Traffic Note: Traffic volumes rounded to the nearest five. 565 494 29 99 28 82 10 � 118 27 145 110 171 206 70—i `— 116 64 73 } 48 25 I r-21 ApproximateScek 40 290 86 Scale: /'_ 1,009 728 681 22 621 1 Buckingham St 8 24 I 0 4 1st + a 1 5 LE 8 3 51 5 4 6 2 79 Lincoln Ave. 60 323 15/ 848 Figure 8 Year 2005 Total Traffic New Belgium Brewery Expansion (LSC #050700) D:W} oY u%20DSWS 7M[1-1�. wvrw- 26 AM Peak —Hour Traffic _3T PM Peak —Hour Traffic note Scale /.- /,000. Figure 7 Itof affic New Belgium Brewery Expansion (LSC #050700) :usa+er�d��swso�amu�iamW�moywa �vvmsvess�nwr�.�w 4: LEGEND: Percent Directional 65% Distribution Approximate Scale Scale: I'-1,000' Figure 6 Directional Distribution of Site -Generated Traffic New Belgium Brewery Expansion (LSC #050700) D:45W*oF�611�N�a1UM�1-t60sWmA0J14�a �1/UIDi1:lSYl PM1 Mry Aw�Y 1k av,a..r. \� _ .B LEGEND: 1 = Romero 2 = Alta Vista 3 = Buckingham 4 = Fort Collins Heritage 5 = Lee Martinez _ — — — — — = Sidewalks (Continuous) Sidewalks (Intermittent) Trails On —Street Bike Lanes (Both Sides) 1 I I1= E. Yine Q. O 1 Budn� St � — Ir Lincdn Ave— — Approximate Scak Scale: 1*-25W i Figure 5 Existing Pedestrian and Bicycle Amenities New Belgium Brewery Expansion (LSC #050700) �:ySCfrop�m\2�U5\MA1M11�1605W50]WDd4 WVafb i:I5.DM1,Mry Sve•Y LEGEND: Ri ---- = R = R • = Bus cop Location North Transit Center Appmomate Scale Scale. 1 `-25W Figure 4 Existing Mass Transit Facilities New Belgium Brewery Expansion (LSC #050700) .�SCwoN�m\arospSoloW11-16Moso]oo o.a.¢ �Y4am �:�seMwrswev 105 s 80 s 5 5 j � L�5 5 5, 5 5-�frs 5 10 60 5 160 105 5 5 5 5 5 40 fr10 60 30 f77o / 5 5 5 5 5 5 80 \� 90 30 % 1 �fj 25 �1 30 5 15 10 1 85 45 130 35 25 5 5 \ 2s 50 i LEGEND: 26 _ AM Peak —Hour Traffic 3T PM Peak —Hour Traffic 71s 55 550 180 zo 180 1s �1�1. 155 240 225 225 40� i255 300 280 285 ~ r 215 20� ` 50 75� } �155 30 r 40 80 1 I r 90 20 1s ao as 9p 75 65 305 l 75 Approximate Scale Scale. I'- lOW Vine St. 650 SITE %1/1 izo Bucking am St 20 5 25 5 10 ��� 5 1 s, 5 Logan Ave. 5 5 5 5 E 50� f10 is U 'g 72 J 50 r 5 s N M Lincoln Ave. 60 380 15 1,070 5 5 I35 25 j �10 10 40 5 , 5 40 55 115 Figure 3 Year 2010 Background Traffic New Belgium Brewery Expansion (LSC #050700) :ySCNop[ b\�SW+'01 W i t l-�G-0A050)W y.A W. IYVa� T. �x a m, wy ]W �y EW / 85 \ 4 66 8U1 4 jjc `14(1) g 4 170) 5 �f 1230) 8 44 7-F2) 140 92 } i 85 1 6 5 0 fr-7 38 71 45 150 -r , / 563 / 2B 493 99 28 82 10 118 160 173 26110 , �145171 2l0 19� ` 48 167 J 206 ► ~ 116 28 1 r'. 35 70� �64 19 13 .{� 73 48 83 88 I 25 f �21 35 40 289 S6 Approximate Scale Vine St. 726 Scale: I-1,000' North 31405 '�+ Acces q 30 16,700 SITE 681 1 621 Buckingham St. 19 1 -11505 7 1-3I 0 4 30 1,490 1 1 16 i �— 4 s Logan Ave. � 3 48 � � 2 8 in til N To � J 44 1 f r- 4 6 N Lincoln Ave. 55 323 15 848 2 0 4 73 LEGEND: 19 �i� f 89 17 C 33 t9 = Traffic Signal 5 9 22 89 f = Stop Sign 56 2 1z2 17 22 1 35 = O Speed Limit 18 38 26 1 AM Peak —Hour Traffic (Heavy Vehicles) _ PR PM Peak —Hour Traffic (Heavy Vehicles) 10,165 = Average Weekend Traffic Figure 2 Existing Traffic, Traffic Control and Lane Geometry New Belgium Brewery Expansion (LSC #050700) �yAwoM«o\ID�s\owrMll-1605\O40AOaf.dq, WI/IIA T.tY.13 My Mry Gwrey �' �' � it It �' � �� � fO i ® � i fi i fi• i Table 3 Recommended Improvements Summary New Belgium Brewery Expansion Fort Collins, Colorado (LSC #050700; December, 2005) Improvement Description Rppncarn t,ununnou Classification --- -- Commited Master Planned and Location Traffic Light at Lemay Avenue Applicant should not contribute to the Traffic signal is needed due to and Buckingham Street cost of this traffic signal. the higher volume of background traffic. Northbound left -turn lane at the Applicant should not contribute to the Left -turn lane is needed due to approach of Lemay Avenue at the intersection of cost of this traffic signal. the higher volume of background Lemay Avenue/Buckingham St. traffic. Note: Attachment D Table 2 (1) Intersection Levels of Service Analysis New Belgium Brewery Expansion Fort Collins, Colorado (LSC # 050700, December, 2005) Year2005 Year2010 2005 Existing Plus Site Year 2010 Backgrund Plus Site Existing Traffic Generated Traffic Background Traffic Generated Traffic Level of Level of Level of Level of Level of Level of Level of Level of Traffic Service Service Service Service Service Service Service Service Intersection Location Control AM PM AM PM AM PM AM PM Lemav Avenue/Vine Street Signalized Eastbound Left C C C C C D C D Eastbound Through & Right C D C D D D D D Westbound Left C D C D F F F F Westbound Through & Right C D C D F F F F Northbound Left,Through, & Right A C A B A E A E Southbound Lef,Through, & Rightt B B B B D F D F Entire Intersection Delay (sec /veh) 20.7 22.2 20.7 22.3 47.0 92.8 47.3 93.2 Entire Intersection LOS C C C C D F D F Linden StreetNne Drive Unsignalized Westbound Left (NB Stop) A A A A A A A A Northbound Approach B B B B B C B C Crttical Movement Delay 11.1 13.0 11.2 13.2 12.2 17.1 12.3 17.5 Buckinchum Street/Linden Street Unsignalized Eastbound Approach (EB & WS Stop) A A A A A A A A Westbound Approach A B A B A B A B Northbound Left A A A A A A A A Southbound Left A A A A A A A A Critical Movement Delay 10.1 11.8 10.3 12.1 10.3 12.1 10.6 12.4 Buckinghum StreeULemav Avenue Unsignalized Eastbound Approach (EB & WB Stop) C E C E - - - - Westbound Approach D F D F - - - - Northbound Left A A A A - - Southbound Left A A A A - - - Critical Movement Delay 28.7 68.1 30.3 70.4 - - - - Buckinghum StreeULemav Avenue Signalized Eastbound Left,Through, & Right - - - - C D C D Westbound Left,Through, & Right - - - - C D C D Northbound Left - - - - A A A A Northbound Through & Right - - - - A B A B Southbound Lef,Through, & Rightt - - - - 8 A B A Entire Intersection Delay (sec /veh) - - - - 10.8 12.1 15.2 12.3 Entire Intersection LOS - - - - B B B 8 Linden Street/South Access Unsignalized Westbound Approach (WB Stop) A B A B A B A B Southbound Left A A A A A A A A Critical Movement Delay 8.7 10.2 8.7 10.3 8.9 10.4 8.9 10.5 Linden Street/Linden Center (North Acess) Unsignalized Eastbound Approach (EB & WB Stop) A A A A A A A A Westbound Approach A A 8 8 B B B B Northbound Left A A A A A A A A Southbound Left A A A A A A A A Critical Movement Delay 9.5 9.9 11.0 11.6 10.4 11.4 10.8 11.7 Buckinghum Street/West Access (Parking Lot) Unsignalized Eastbound Left (SB Stop) - - A A A A A A . Southbound Approach - - A A A A A A Critical Movement Delay - - &9 9.3 9.0 9.3 9.2 9.5 Note: (1) Using 2000 Highway Capacity Manual (HCM) methodology and Level of Service (LOS) definitions. Manufacturing (1) (2) Table 1 ESTIMATED TRAFFIC GENERATION New Belgium Brewery Expansion Fort Collins, Colorado (LSC #050700; December, 2005) 60 KSF (3) Trip Generation Rates (1) Vehicle - Trips Generated Average AM Peak Hour PM Peak Hour. Average AM Peak Hour PM Peak - Hour Weekday In Out In Out Weekday In Out In Out 3.82 0.56 0.17 0.27 0.47 229 34 10 16 28 Notes: (1) Source: "Trip Generation", Institute of Transportation Engineers, 7th Edition, 2003. (2) Land Use No. 140, Manufacturing (3) KSF = Thousand Square Feet IMs. Lora Heckman Page 12 December 5, 2005 1 for two of the five factors. The standard is not met for continuity and street crossings. However, due to the small number of trips the proposed expansion is expected to generate, no mitigation measures are proposed. With the recommendations contained herein, the adjacent road network can accommodate the traffic expected to be generated by the proposed expansion. We trust that this revised report will assist with planning for the proposed New Belgium Brewery expansion. Please call if we can provide additional assistance. Respectfully submitted, LSC Transportation Gr�s_itats; Inc': PIT it 34 e Dave L. DLR/wc Enclosures: Tables 1 through 3 Figures 1 through 11 Existing Traffic Count Data Capacity Analyses (Synchro Printouts) Public Transit LOS Worksheet Pedestrian LOS Worksheet Bicycle LOS Worksheet Z:\L9C\Projects\2005\050700\Report\R-NBBE_Nov 05.wpd IMs. Lora Heckman Page 11 December 5, 2005 Redwood Trail begins at Linden Street and East Vine Street which is about 2,100 feet from the ' proposed expansion. Heritage Park is located within 1,320 feet of the proposed expansion. Access to this park ' would be by way of Linden Street. For bicyclists, this access appears to be excellent due to the striping of an on -street bike lane on Linden Street. The bicycle LOS worksheet is attached to this report. Conclusions and Recommendations ' Based on the analyses presented herein, the following conclusions and recommendations are made with respect to buildout of the proposed New Belgium Brewery expansion: 1. When completed, the proposed New Belgium Brewery Expansion is planned to ' contain 60,000 square feet of manufacturing (packaging) space. This expansion is projected to generate 229 additional average weekday vehicle -trips (115 entering and 115 exiting). This total includes 34 vehicles entering and 10 vehicles exiting during the AM peak -hour and 16 vehicles entering and 28 vehicles exiting during the PM peak -hour. ' 2. The directional distribution of site -generated traffic is expected to be primarily oriented toward the south with 35 percent traveling south on Lemay Avenue and 43 percent traveling south on Linden Street. Ten percent is expected to travel west ' along East Vine Street. Ten percent is expected to travel north along Lemay Avenue. The remaining two percent will travel east on East Vine Street. ' 3. Most of the intersections analyzed in this report will operate at acceptable Levels of Service (LOS "D" or better) in the AM and PM peak -hours either with or without the traffic from the proposed New Belgium Brewery expansion. This applies to both 2005 and 2010. The only intersection that is expected to experience a problem is the intersection of Lemay Avenue and Buckingham Street, but the City of Fort Collins is expected to install a traffic signal at this intersection. ' 4. The intersection of Lemay Avenue/Vine Street will operate at poor Level of Service (LOS "F") during the PM peak -hour of Year 2010 either with or without the addition of site -generated traffic. Site -generated traffic will increase delay by less than one percent for either the AM and PM peak -hours. 5. A northbound left -turn lane on the northbound approach of Lemay Avenue at the t intersection of Lemay Avenue/Buckingham Street is recommended. The length of the turn lane should be 170 feet including 100 feet taper. The need for this left -turn lane is due to background traffic and not the traffic from the proposed expansion. ' 6. The public transit and bicycle LOS standards are met for the proposed expansion based on the existing public transit and bicycle facilities already available to ' residents. In the case of pedestrian facilities, the minimum LOS standard is not met 1 Ms. Lora Heckman Page 10 December 5, 2005 to the proposed expansion. For this area type, a Level of Service "C" has been established for all five factors. Based on the condition of the current street system serving the proposed expansion, the ' following Level of Service has been assigned for each of the five factors recommended by the City of Fort Collins for assessing the quality of the pedestrian facilities -- directness, continuity, street crossings, visual interest and amenity, and security: ' 1. Directness: Without a site plan showing the internal roadway system, it is difficult to assess this criteria. However, there do not appear to be any existing physical ' barriers for pedestrians to take the most direct path from the proposed expansion to other destinations. As such, a Level of Service "B" is felt to be appropriate. 2. Continuity: Due to a total lack of sidewalks on the major streets serving the proposed ' expansion, an unacceptable Level of Service (LOS "F") is felt to be appropriate. 3. Street Crossing: Most major street crossings are considered to be unacceptable from a pedestrian point of view. Therefore, Level of Service "F" is felt to be the most appropriate designation. ' 4. Visual Interest and Amenity: It is difficult to assess this factor. Linden Street and Buckingham Street both have street lighting but are lacking in other amenities. This factor is extremely subjective. A Level of Service "C" has been assigned to this factor. 5. Securi : This element is more subjective with no clear quantifiable measurements for determining Level of Service. The City of Fort Collins has established Level of Service "C" as the target Level of Service. It would appear that the major streets serving the proposed expansion fall short of this target LOS with a LOS "D" deter- mination. Overall, the assessment of the streets serving the proposed expansion from a pedestrian stand- point resulted in a determination that these streets do not meet the City of Fort Collins's target level of service. In most cases, these streets are well below the target level of service. However, due to the small number of trips that the proposed expansion is expected to generate, no mitigation measures are proposed. The pedestrian LOS worksheet is attached to this report. Bicycle Linden Street, Buckingham Street, and Lemay Avenue have striped bike lanes on both sides. Potential visitors and employees of the proposed expansion will have a number of on -street bike routes to use to access the rest of Fort Collins. The presence of these existing on -street facilities results in a base connectivity of LOS "A" whereas the minimum LOS is "C". rBesides these on -street facilities, there are two off-street facilities: Cache La Poudre Trail and Redwood Trail. Both of these trails can be accessed by existing on -street bike lanes. The Ms. Lora Heckman Page 9 December 5, 2005 day service, weekday frequency of service, travel time factor, and peak load factor. Two Level of Service rates have been established, one where the area is within 1,320 feet of a transit route(s) and the other where the area is within 2,640 feet of a transit route(s). ' The proposed expansion is within 1,320 feet of a transit route(s). The City of Fort Collins has established Level of Service "D" for the proposed New Belgium Brewery expansion. To meet this Level of Service, at least two of the four service level standards must be met. ' 1. Hours of Weekday Service: Route 14, which provides service along Lemay Avenue, provides about 18 hours of service each weekday. The standard for this service element is 16 hours. Therefore, this service level standard has been met. 2. Weekday Frequency of Service: Two routes provide service along Lemay Avenue, Route No 8 and 14. Route 8 arrives at Lemay and East Vine Street starting at 5:35 AM and every 60 minutes after that, while Route 14 arrives at this same intersection at 6:30 AM and every 30 minutes after that. Based on this frequency, this service level standard is not met. 3. Travel Time Factor: Based on the posted schedule, it takes the bus approximately 13 minutes to get from Lemay Avenue and East Vine Street to the North Transit Center. It takes about 6 to 7 minutes to make this same trip by car. This is based on a distance of 1.8 miles and an average speed of 20 miles per hour. This means the travel time factor is about 2.0. Based on this calculation, this service level standard has been met. 4. Peak Load Factor: The service level standard is 1.2 which is the total number of transit riders divided by the number of seats. Based on the latest ridership estimates from Transfort, the peak load factor is below this threshold. As such, this service standard has also been met. Three of the four service standards are met, meaning that the public transit Level of Service is estimated to be LOS "B." This is above the standard established by the City of Fort Collins. The public transit LOS worksheet is attached to this report. a Pedestrian I Considerable work is needed to construct sidewalks along the roadways serving the proposed expansion. There is a sidewalk on the south side of Buckingham Street directly in front of the manufacturing facility. There is no sidewalk on the north side of Buckingham Street. Linden ' Street has a few sections where sidewalks exists on one or both sides of it. In addition, there are no sidewalks along Lemay Avenue between Buckingham Street and Vine Street. ' Pedestrian level of service is calculated by five area types and five factors. The proposed expansion is not close to a pedestrian district. The proposed expansion is not within 1,320 feet of an activity corridor/center or transit center. The proposed expansion is more than 5,280 feet from an existing or planning school. Therefore, only the "other" area type applies Ms. Lora Heckman Page 8 December 5, 2005 As shown in Figure 11, by the Year 2010 site -generated traffic will represent less than four percent of the total traffic on Linden Street, eight percent on Buckingham Street, one percent on Lemay Avenue, and one percent on Vine Street. Access Recommendations The recommended traffic control and lane geometry for the Year 2010 are shown in Figure 10. As was stated earlier, a separate left -turn lane is needed on the northbound approach of Lemay Avenue at the intersection with Buckingham Street. Based on the design criteria found in the 2003 Colorado State Highway Access Code, the following turn -lane length is recommended: A northbound left -turn lane on the northbound approach of Lemay Avenue at the intersection with Buckingham Street. The length of the turn lane should be 170 feet including a 100-foot taper. Recommended Improvement Summary Recommended improvements are also summarized in Table 3 with the information of the parties responsible for the improvements. A traffic signal is recommended at the intersection of Lemay Avenue/Buckingham Street. The traffic signal is needed due to the higher volume of background traffic. Also, the northbound left -turn lane on the northbound approach of Lemay Avenue at the intersection of Lemay Avenue and Buckingham Street is needed due to the higher volume of background left -turn traffic. Therefore, it is recommended that the developer of the proposed New Belgium Brewery expansion should not be required to contribute to the cost of the traffic signal or northbound left -turn lane at the intersection of Lemay Avenue and Buckingham Street. Modal Analysis The City of Fort Collins requires an analysis of alternative transportation models as a part of the traffic impact study. What follows is an analysis of the mass transit, pedestrian, and bicycle facilities in and around the proposed New Belgium Brewery expansion. Mass Transit The proposed expansion is already served by two transit routes, Route Nos. 8 and 14. Route 8 already has an existing bus stop at the intersection of Linden Street/Buckingham Street, which is about 850 feet west of the western edge of the proposed site. Route 14 already has an existing bus stop located at the northeast corner of the proposed site. This route also has a bus stop located at First Street and Lincoln Avenue, which is about 0.25 miles south of the proposed site. The City of Fort Collins has established a method for determining the public transit Level of Service. The range in Level of Service is from "A" (all four service standards are met) to "F" (where none of the service standards are met). The four service standards are: hours of week- Ms. Lora Heckman Page 7 December 5, 2005 ground peak -hour traffic volumes, the average vehicle delay increases by about six seconds per vehicle. The poor performance of this intersection is due to background traffic and not the traffic from the proposed expansion. By the Year 2010, the City of Fort Collins plans on signalizing this intersection. As a signalized intersection, it is expected to operate at a very good Level of Service. (LOS "B" or.better) during the AM and PM peak -hours through the Year 2010. ' An analysis of this intersection was performed to determine if a separate northbound left -turn lane is needed. The methodology in the National Cooperative Highway 1 Research Program (NCHRP) Report 279 was used. The methodology in this report uses the number of left -turning vehicles, the. opposing through volumes, and the percent of left -turning vehicles as a percent of the total traffic. Based on the peak - hour traffic volumes depicted in Figure 9, a separate northbound left -turn lane is ' warranted. The need for this separate left -turn lane is due to background traffic and not the traffic from the proposed expansion. '• Linden Street/ South Access: All traffic movements at this unsignalized intersection are expected to operate at a very good Level of Service (LOS "B" or better) during both AM and PM peak -hours through the Year 2010. This applies either with or without ' the traffic from the proposed expansion. • Linden Street/North Access: All traffic movements at this unsignalized intersection are expected to operate at a very good Level of Service (LOS "B" or better) during both AM and PM peak -hours through the Year 2010. This applies either with or without the traffic from the proposed expansion. '0 Buckingham Street/West Access: All traffic movements at this unsignalized inter- section are expected to operate at an excellent Level of Service (LOS "A") during both ' AM and PM peak -hours through the Year 2010. This applies either with or without the traffic from the proposed expansion. An analysis of this intersection was performed to determine if a separate eastbound left -turn lane is needed. The methodology in NCHRP Report 279 was used. Based on the peak -hour traffic volumes depicted in Figure 9, a separate eastbound left -turn lane is not.warranted. Averaae Daily Traffic Impacts The traffic impacts of the proposed New Belgium Brewery expansion can also be expressed in terms of average daily traffic (ADT) volumes, in which site -generated traffic is shown as an increment of total traffic. These comparisons are shown in Figure 11. Traffic volumes for site - generated traffic and total traffic are also compared with anticipated roadway capacity estimates. U ' Ms. Lora Heckman Page 6 December 5, 2005 1 Estimated Traffic Impacts ' Based upon the peak -hour traffic volumes shown in Figures 2, 3, 8, and 9, signalized and un- signalized intersection capacity analyses have been performed, using procedures set forth in ' the 2000 Highway Capacity Manual. The concept of Level of Service (LOS) is used as a basis for computing combinations of roadway operating conditions. By definition, six different Levels of Service are used (A, B, C, D, E, and F) with "A" being a free -flow condition and "E" representing the "capacity" of a given intersection or traffic movement. Analyses have been performed for both the AM and PM peak -hours for the background (existing and future year) traffic conditions and the background traffic plus traffic generated by the proposed expansion. ' The existing lane geometry and traffic control depicted in Figure 2 were used for the Year 2005 analysis. Lane geometry and traffic control shown in Figure 10 were used for the Year 2010 analysis. The results of these capacity analyses (Synchro printouts) are attached to this report and are summarized in Table 2. • Lemav Avenue / Vine Street: This signalized intersection presently operates at a good Level of Service (LOS "C") with all traffic movements operating at an acceptable Level 1 of Service (LOS "D" or better) during both the AM and PM peak -hours. When the traffic from the proposed expansion is added to the existing traffic volumes, there is no change in the operation of this intersection. Under Year 2010 background traffic conditions, this intersection is expected to operate at an acceptable Level of Service (LOS "D") during the AM peak -hour and a poor Level of Service (LOS "F") during the PM peak -hour. When site -generated traffic is added to the background traffic volumes, this intersection is expected to continue to operate at a poor Level of Service (LOS "F") during the PM peak -hour. The average vehicle delay increases by about one second per vehicle as a result of adding the site - generated traffic to the background peak -hour traffic volumes. The poor performance of this intersection in the PM peak -hour is due to background traffic and not the traffic from the proposed expansion. Site -generated traffic results in an increase of less than one percent for both the AM and PM peak -hours. • Linden Street/Vine Street: All traffic movements at this unsignalized intersection presently operate at a good Level of Service (LOS "C" or better) during both AM and PM peak -hours either with or without the traffic from the proposed expansion. By the Year 2010, there is no change in the performance of this intersection. Linden Street/Buckingham Street: All traffic movements at this unsignalized inter- section presently operate at a very good Level of Service (LOS "B" or better) during both AM and PM peak -hours. When the traffic from the proposed expansion is added to the existing traffic volumes, there is no change in the performance of this inter- section. By the Year 2010, there is no change in the performance of this intersection. • Buckingham Street/Lemav Avenue: Some traffic movements at this unsignalized intersection presently operate at a poor Level of Service (LOS "E" or worse) during the PM peak -hour. When the traffic from the proposed expansion is added to the back- 0 Ms. Lora Heckman Page 5 December 5, 2005 Street. In addition, the Redwood Trail exists on the east side of Redwood Street. The trail ' begins at East Vine Street and travels north. There is a significant lack of pedestrian facilities, mainly sidewalks. An inventory of the streets in and around the proposed expansion found very few sidewalks, and the sidewalks that already exist would be considered to be sub- standard. This lack of adequate sidewalks makes pedestrian access to the existing parks extremely difficult. Figure 5 depicts the location of existing sidewalks and trails. A brief inspection of the area around the proposed expansion found more bicyclists than pedestrians. This is probably due to the presence of signed on -street bike lanes and the lack of adequate sidewalks. Estimated Traffic Generation The proposed New Belgium Brewery expansion is planned to contain 60,000 square feet of manufacturing (packaging) space upon completion. Using traffic generation rates found in Trip Generation, 7' Edition, published by the Institute of Transportation Engineers in 2003, Table 1 has been compiled. As indicated in Table 1, the proposed New Belgium Brewery expansion is projected to generate 229 additional average weekday vehicle -trips (115 entering and 115 exiting). This total includes 34 vehicles entering and 10 vehicles exiting trips during the AM peak -hour and 16 vehicles entering and 28 vehicles exiting during the PM peak -hour. Estimated Traffic Distribution and Assignment A key element in the determination of the proposed project's traffic impacts is the directional distribution of its traffic onto the surrounding roadway system. The relative location of the site, the type of land use, and specific characteristics of the roadway and access system will dictate what this distribution will be. Figure 6 illustrates the distribution expected to be applicable to the proposed expansion. It is expected that 35 percent will travel south on Lemay Avenue, 43 percent will travel south on Linden Street, ten percent will travel west along East Vine Street, two percent will travel east along East Vine Street, and the remaining ten percent will travel north along Lemay Avenue. Application of the percentage distribution projections shown in Figure 6 to the traffic generation estimates contained in Table 1 yields the traffic assignment of site generated traffic shown in Figure 7. I o Total Traffic Total peak -hour traffic volumes at the Buckingham Street/ Linden Street, Lemay Avenue/ Vine Street, Vine Street/Linden Street, Lemay Avenue/Buckingham Street, Linden Street/North Access, and the site access intersection along Buckingham Street are shown in Figures 8 and 9 for the Years 2005 and 2010, respectively. These volumes were derived by adding site - generated traffic to the background traffic. Figure 8 shows the assignment of site -generated traffic from Figure 7 added to the Year 2005 existing traffic from Figure 2. Figure 9 shows the assignment of site -generated traffic from Figure 7 added to the Year 2010 background traffic from Figure 3 r t ' Ms. Lora Heckman Page 4 December 5, 2005 Route 14 provides 60-minute service starting at the North Transit Center at 5:22 AM and ending at 10:17 PM at the North Transit Center. This route serves Downtown Fort Collins, Social Services, Poudre Valley Mobile Home Park, and hotels located along State Highway 14. At its closest point, this route operates along Lemay Avenue with an existing bus stop located at the northeast corner of the proposed expansion. The next closest point is at the intersection of Lemay Avenue and East Vine Street which is about 600 feet north of the proposed expansion. It is important to note that all Transfort buses are equipped with bike racks to allow bicyclists to bring their bikes with them. Each bus route is served by a wheelchair accessible bus. Special transportation to and from other locations is available for ADA eligible riders via the Dial -A -Ride service. There are a number of existing bus stops that are in close proximity to the proposed expansion. Bus stops currently exist at the intersections of East Vine Street/Linden Street, East Vine Street/Lemay Avenue, Linden Street/Buckingham Street, and Lemay Avenue/San Cristo Street. Figure 4 depicts the location of each bus route with respect to the proposed New Belgium Brewery expansion. Figure 4 also shows the location of the existing bus stops. Pedestrian / Bicycle Pedestrian/bicycle amenities can be grouped into two types — paths/trails and facilities. In the case of the proposed expansion, there are five existing parks that could be used by residents in the vicinity of the proposed New Belgium Brewery expansion — Alta Vista (0.63 acres), Buckingham (5.75 acres), Fort Collins Heritage (13.0 acres), Romero (0.15 acres), and Lee Martinez (89.56 acres). The number of facilities offered at each of these five parks varies significantly, ranging from playground and basketball (Alta Vista) to playground, shelters, restrooms, lighted baseball fields, lighted basketball courts, and lighted tennis courts (Lee Martinez). Figure 5 depicts the location of these five parks with respect to the proposed New Belgium Brewery expansion. The Lee Martinez, Romero, and Fort Collins Heritage parks are the closest existing parks to the proposed expansion. The proposed expansion is approximately one mile from Lee Martinez ' Park, directly across from Romero Park, and 0.6 miles from Fort Collins Heritage Park. These distances are measured from the center of the proposed expansion to the center of each park. ' Lee Martinez Park can be accessed from the proposed expansion in several ways. The most direct way would be to travel west along Buckingham Street to Linden Street, south on Linden Street to the Poudre Trail, and west to the park. Fort Collins Heritage Park can be most easily t accessed by going west along Buckingham Street to Linden Street then south on Linden Street where the park in located at the intersection of Linden Street and the Cache La Poudre River/ Poudre Trail. Romero Park can be accessed by just crossing Lemay Avenue. ' The streets in and around the proposed New Belgium Brewery expansion have striped bike lanes on both sides of the major roadways. The most important bike lanes that will serve the ' proposed expansion are East Vine Street, Buckingham Street, Lemay Avenue, and Linden I Ms. Lora Heckman Page 3 December 5, 2005 provided by the City of Fort Collins, these volumes accommodate the existing traffic, minor regional growth (i.e. developments without significant impacts), and already approved develop- ments. Year 2010 background traffic volumes at all other intersections were calculated by applying a two percent annual growth rate to the existing traffic for five years (equivalent annual growth factor of 1.1). This growth rate was assumed because the surrounding area is mostly developed. A comparison was made between the Lemay Avenue/Vine Street and Lemay Avenue/Buckingham Street intersections to make sure the peak -hour traffic volumes seem reasonable. Year 2010 background traffic volumes are shown in Figure 3. Note that the existing auto- mobile turning volumes at the Linden Street/North Access intersection were removed and added at the west access (existing fire lane access) intersection along Buckingham Street. This is because the north access road (westbound approach) will be restricted and only trucks will use this access to enter or exit the site. Existing Mass Transit and Pedestrian/Bicycle System Besides the existing roadway system serving the proposed expansion, the City of Fort Collins has made a major commitment to alternative modes of transportation, specifically pedestrian/ bicycle and mass transit. An inventory was made of these alternative modes. Mass Transit The City of Fort Collins' mass transit system, Transfort, has a total of 12 bus routes plus three specialized services operating in the Fort Collins area. Three routes provide direct service to the proposed New Belgium Brewery expansion. These routes are Route Numbers 8, 9, and 14. What follows is a short description of these three bus routes. • Route 8 provides 30-minute service starting at the North Transit Center, which is located between Maple Street and Laporte Avenue just west of North College Avenue, at 6:22 AM and ending at 6:49 PM at the North Transit Center. This route serves The Mission, Social Services, Downtown Fort Collins, and Poudre Valley Mobile Home Park. At its closest point, this route operates along Linden Street between Jefferson Street and East Vine Street. There is an existing bus stop located near the inter- section of Linden Street/Buckingham Street which is about 850 feet west of the western boundary of the proposed expansion. The next closest access point would be to the north at East Vine Street. • Route 9 provides 60-minute service starting at the North Transit Center at 6:22 AM and ending at 6:35 PM at the Edora Pool Ice Center (EPIC). This route serves the Poudre Valley Hospital, downtown Fort Collins, Lincoln Junior High School, and EPIC. At its closest point, this route is about 0.5 miles southwest of the proposed expansion. LSC TRANSPORTATION CONSULTANTS, INC. 1889 York Street Denver, CO 80206 (303)333-1105 FAX (303) 333-1107 E-mail: Isc@lscdenver.com Web Site: http://www.Iscdenver.com d 4C. December 5, 2005 Ms. Lora Heckman New Belgium Brewery 500 Linden Street Fort Collins, CO 80521 Re: New Belgium Brewery Expansion Fort Collins, Colorado (LSC #050700) Dear Ms. Heckman: We have completed our revised traffic impact analysis report for the proposed New Belgium Brewery expansion. This revision has been prepared to respond to a change in the site plan. The proposed expansion is located directly east of the existing brewery facility, which is located in the northeast corner of the intersection of Linden Street and Buckingham Street. When completed, the proposed expansion is planned to contain 60,000 square feet of manufacturing (packaging) space. Access to the site will be provided from Buckingham Street for employees (along the existing fire lane access) and from Linden Street for commercial vehicles (at the existing north access). Existing Roadways and Traffic Figure 1, enclosed, illustrates the location of the proposed expansion within the surrounding major roadway system in the City of Fort Collins. As indicated in Figure 1, the site is bounded by the City of Fort Collins facility on the north, Lemay Avenue on the east, Buckingham Street on the south, and Linden Street on the west. The most important roadways in the vicinity of the proposed New Belgium Brewery expansion are Lemay Avenue, Buckingham Street, Linden Street, and East Vine Street. • Lemay Avenue, which parallels North College Avenue, is a two-lane roadway that provides north/south continuity on the eastern edge of the City of Fort Collins. It is functionally classified as an arterial. It has a posted speed limit of 30 mph near Buckingham Street. The City of Fort Collins' Master Street Plan indicates that this roadway is to be widened to four lanes in its full length. The intersections with East Vine Street and Lincoln Avenue are controlled by traffic signals. No Text ' Ms. Lora Heckman Page 2 December 5, 2005 ' East Vine Street is a two-lane, east/west arterial roadway. This roadway begins at North College Avenue on the west and continues easterly. This roadway has a posted speed limit of 35 mph near Linden Street. The City of Fort Collins Master Street Plan indicates this roadway will be relocated to the north from North College Avenue to west of Linden Street. This plan also indicates that the roadway will be widened to ' four lanes. Just south of this roadway, the Burlington Northern Santa Fe railroad has railroad tracks. The intersection with Lemay Avenue is controlled by a traffic _ signal. The City of Fort Collins has just recently added eastbound and westbound ' left -turn lanes at Lemay Avenue. _ Buckingham Street is a two-lane collector roadway that begins on the west at Linden ' Street and ends on the east at Lemay Avenue. It has a posted speed limit of 30 mph. The roadway is controlled by Stop signs at Lemay Avenue and Linden Street. There are no plans by the City of Fort Collins to widen this roadway. The City of Fort Collins has programmed the installation of a traffic signal at Lemay Avenue. The exact timing for the installation of this traffic signal is not yet known. • Linden Street is a two-lane collector roadway that currently ends at East Vine Street. It provides a direct connection into the downtown area of Fort. Collins. It has a posted speed limit of 30 mph. The intersection with East Vine Street is currently unsignalized with Stop control on Linden Street. The City of Fort Collins Master Street Plan indicates this roadway will align with Redwood Street north of East Vine Street. Figure 2 shows peak -hour turning movement volumes at the intersections of Buckingham Street/Linden Street, Lemay Avenue/Vine Street, Vine Street/Linden Street, Lemay Avenue/ Buckingham Street, Linden Street/North Access, and Linden Street/South Access. These volumes are based on traffic counts conducted by Counter Measures, Inc. in May, 2005. Daily traffic counts were also collected along Linden Street, just north of the South Access; on Buckingham Street, just east of Linden Street and just west of Lemay Avenue; and on Lemay Avenue, just north of Buckingham Street. These daily traffic volumes are also depicted in Figure 2. Linden Street currently carries approximately 3,400 vehicles per average weekday, Buckingham Street currently carries approximately 1,500 vehicles per average weekday, and Lemay Avenue currently carries approximately 16,700 vehicles per average weekday. A summary of the raw count data is attached to this report. Existing traffic controls, lane geometry, and posted speed limits for the above mentioned intersections and roadways are also shown in Figure 2. Background Traffic Two analysis years were considered in the preparation of this report: the existing conditions and a short-term planning horizon. Staff from the City of Fort Collins felt that a long-range planning analysis was not needed due to the small size of the expansion. The short-term planning horizon was considered to be the Year 2010. Year 2010 background traffic volumes at the intersection of Lemay Avenue/Vine Street are based on the information provided by the City of Fort Collins. According to the information t a�iAa r V EAU 444, ♦lee : ri —' a• .Y�•'1`-vim. �. y7: Adx v+ ^"� i F,' !\.I-:y7�� `� {{ r ♦. 1 r,,� tea. \ar �lz�i ffi ." a� �, wl, I _ �i1i +!F i • • • , � 'I �i�� t trr \F(:�✓�_` G � ���xa_- \:,j�•.4w•}�ji^i.r-�wrC .--r. �z�`-"Sd+ax•' 4tvnA,'.rr_.a.�. .1 .�•.�---�++r bra,. ..., r