HomeMy WebLinkAboutNEW BELGIUM BREWERY, PROCESS WATER FACILITY - PDP - 1-95D - DECISION - FINDINGS, CONCLUSIONS & DECISION4
V.
i l!
i
''� �} oi''►� -So
2- H�TI vE- H_ E/�►R �w G
------- --- �-- -/VEl✓ -DEL G� � �"�- --13 iCEt,./E� % �'X PA/►L J'io^/
--------- 1 TE.D _ J'H�Pg�-�---�U�C.�6.N__? �c-.9�✓svi.vG---��'�% -
- 2- 2
Kas
-- _ � ��kT2-�cc�t�ocrGK__ i�b�.�r-t-1- s-r�rz-. �s��ra•---------- —
--------------------------- --- -
New Belgium Brewery Expanb,un-Process Water Facility PDP
Administrative Hearing
July 18, 2001
Page 8 of 8
A. The New Belgium Brewery Expansion, Process Water Facility, Project
Development Plan is subject to administrative review and the requirements of the
Land Use Code (LUC).
B. The proposed land uses comply with the New Belgium Overall Development
Plan.
C. The New Belgium Brewery Expansion, Process Water Facility, Project
Development Plan complies with the Development Standards for the Industrial
zoning district.
D. The New Belgium Brewery Expansion, Process Water Facility, Project
Development Plan complies with the General Development Standards of the
Land Use Code.
E. Future development of the property will be required to meet Land Use Code
Division 2.6 DEVELOPMENT CONSTRUCTION PERMITS; and, Division 2.7
BUILDING PERMITS.
DECISION
Based on the findings and conclusions, the request for the New Belgium Brewery
Expansion, Process Water Facility, Project Development is approved subject to the
following condition:
1. The Applicant shall provide a letter, acceptable to the City Engineer, clarifying the
location of street phasing for future improvements to Buckingham Street, prior to
submittal for any building permits for new construction.
Dated this 25th day of July 2001, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
Cameron Glo
Current Plann ng Director
New Belgium Brewery Expana.on-Process Water Facility PDP
Administrative Hearing
July 18, 2001
Page 7 of 8
Facility. The sidewalk will be constructed along this distance in phases. Phase One will
be constructed no later than June 30, 2002. Phase Two will be constructed no later
than June 30, 2006. In any event, a subsequent P.D.P. along Buckingham would
trigger sidewalk improvements in conjunction with any new development if it occurs
prior to these deadlines.
Funds needed to widen of the north half of Buckingham Street will be escrowed in
accordance with Section 3.3(E) and codified in a Development Agreement.
E. Emergency Access
There will be two points of access, one from Buckingham Street and one from Linden
Street. In addition, the building containing the chemical storage tanks will be equipped
with an automatic fire extinguishing system.
FINDINGS OF FACT
In evaluating the request for New Belgium Brewery Expansion, Process Water Facility,
P.D.P., Staff makes the following findings of fact:
A. The proposed land use is in compliance with the approved Overall Development
Plan.
B. The proposed land use is considered light industrial and is permitted in the
Industrial zone district as an administrative review.
C. The P.D.P. satisfies the Development Standards of the Industrial zone district.
D. The P.D.P. complies with the applicable General Development Standards.
STAFF RECOMMENDATION
Staff recommends approval of New Belgium Brewery Expansion, Process Water
Facility, P.D.P., #1-95D.
FINDINGS AND CONCLUSIONS
After reviewing the staff report and the record of the public hearing, the Hearing Officer
makes the following findings and conclusions:
New Belgium Brewery Expansion -Process Water Facility PDP
Administrative Hearing
July 18, 2001
Page 6 of 8
western portion of Lot One will remain undisturbed. Street trees along Buckingham will
be planted in the future at the time the street is widened and sidewalk installed.
Section 3.2.1(E)(1) requires that:
"Buffering Between Incompatible Uses and Activities. In situations where the Director
determines that the arrangement of uses or design of buildings does not adequately
mitigate conflicts reasonably anticipated to exist between dissimilar uses or building
designs, one (1) or more of the following landscape buffering techniques shall be used to
mitigate the conflicts.
As mentioned, there is 570 feet on the western portion of Lot One that is adjacent to the
R-L zone. Even thought the proposed development is west of this adjacency, the berms
and landscaping are designed and oriented to buffer the residential area. The berms
achieve a height of ten feet which is higher than the water surface elevation of the
ponds. The evergreen trees will be planted on the berms. This buffering will mitigate
any potential conflicts between the Treatment Facility and the neighborhood.
There are three existing trees that will be removed as a result of this P.D.P. As
mitigation, four 3-inch caliper shade trees will be planted as per the recommendation of
the City Forester.
B. Access, Circulation and Parking
The Treatment Facility will require the attention of one or two employees on a daily
basis. For this reason, there is no new circulation system for vehicles, bicycles,
pedestrians or transit. Access to the site will be via internal service roads that are not
available to the public. In fact, these service roads will be gated for security purposes.
C. Site Lighting
Security lighting will be down directional. All lighting is internal to the property. There
will be no illumination cast beyond the property line.
D. Required Improvements Prior to Issuance of Certificate of Occupancy
There is approximately 2,596 feet of frontage along Buckingham Street which is
presently not improved to the collector street standard. Since the Treatment Facility will
generate no new employees and is closed to the public, the required public
improvements along Buckingham will be phased in over a time frame not to exceed five
years.
Presently, the existing sidewalk on the north side of Buckingham Street terminates at
the eastern edge of the existing brewery, near the intersection with First Street. There
is approximately 1,583 feet of street frontage to the eastern property line of Treatment
New Belgium Brewery Expans.on-Process Water Facility PDP
Administrative Hearing
July 18, 2001
Page 5 of 8
Lot One is 1,583 feet in length along Buckingham Street. Only the westerly 570 feet are
adjacent to the Buckingham neighborhood zoned R-L, Low Density Residential. There
is no development within this 570 feet. In fact, the western edge of the proposed
development is an additional 320 feet east of the R-L zone district boundary line.
Even though there is no land development directly adjacent to the R-L zone, the P.D.P.
provides for landscape berms that achieve an overall height of ten feet between
Buckingham Street and the Treatment Facility. The landscaping consists of clusters of
evergreen trees to provide year-round screening. This combination of separation,
earthen berming and landscaping sufficiently screens the Treatment Facility from the R-
L zone.
Section 4.23(E)(3)(a)(3) requires that:
"A minimum eighty -foot deep landscaped yard shall be provided along any boundary
line that adjoins a residential land use or a zone district (whether within or beyond the
city's jurisdictional boundary) that is predominately characterized by residential uses as
permitted uses. This residential buffer yard may be reduced to thirty (30) feet if the
adjoining residential land use or zone district (whether within or beyond the city's
jurisdictional boundary) is separated by a public street.
Buckingham Street represents the zone district boundary line between the Industrial
and Low Density Residential zones. As mentioned, there is 570 feet on the western
portion of Lot One that abuts this zone district boundary line. In the area of this 570
feet, there is no land development. Therefore, the requirement for an 80-foot deep
landscaped yard is satisfied.
Section 4.23(E)(3)(b)(1) requires that:
"Storage, loading and work operations shall be screened from view along all
district boundary lines along all public streets."
As mentioned, Buckingham Street represents a district boundary line along a public
street for Lot One. The storage, loading and work operations for the Treatment Facility
are located on the northern portion of the site, not along Buckingham Street. For Lot
Two, a future P.D.P. will be required as this tract is only being platted, not developed, at
this time.
3. Compliance with Applicable General Development Standards:
A. Landscaping and Tree Protection
The primary purpose of the landscape plan is to screen the open ponds from
Buckingham Street by use of earthen berms and evergreen trees. Existing trees on the
New Belgium Brewery Expanwon-Process Water Facility PDP
Administrative Hearing
July 18, 2001
Page 4 of 8
2.) A Major Amendment to allow 16 fermentation tanks up to a height of 50
feet was approved in July of 1997.
3.) A Minor Amendment to allow construction of a 4,000 square foot central
utility plant was approved in September of 1997.
4.) A Project Development Plan for brewery, office, warehouse and parking
expansion on an additional 2.63 acres was approved in October of 1997.
5.) Six Minor Amendments have been approved between October of 1998
and February of 2000.
6.) An Overall Development Plan on the entire .49 acre site was approved on
June 21, 2001.
At this time, the current brewery operations consist of approximately 125,000 square
feet and takes up 7.17 acres located at the western edge of the property. The balance
of the property, which is the subject of this P.D.P., remains vacant.
Compliance with Overall Development Plan:
The O.D.P. designated a 6.99 acre parcel as "Process Treatment Facility" in the same
location as indicated on the P.D.P. The P.D.P., therefore, is in compliance with the
O.D.P.
2. Compliance with the Industrial Zone District:
A. Land Use
The proposed land use, a treatment facility for water used in the brewing process, is
considered to be "light industrial' which is a permitted use subject to administrative
review.
B. Development Standards
Section 4.23(E)(3)(a)(1) requires that:
"Industrial and commercial activities shall not be located adjacent to a residential
area unless the activities and related storage are contained within a building or
otherwise completely screened from view of the residential area."
New Belgium Brewery Expansion -Process Water Facility PDP
Administrative Hearing
July 18, 2001
Page 3 of 8
Public Comment:
Mr. Baca stated that he has been opposed to the brewery from the time of its original
construction and that the City approved the original development application despite
receiving a petition signed by more than 60 neighborhood residents. He raised concern
that increases in truck traffic due to past brewery expansions, and odor of the brewery
operation, are adversely impacting the adjacent neighborhood. It is his opinion that the
neighborhood opposes the brewery operation.
Further, he expressed opposition to the process water facility proposed under this PDP
application. It is his opinion that the proposed ponds will create additional odors and
that conditions are particularly offensive due to the prevailing winds toward the
northwest.
Applicant Response:
The Hearing Officer inquired about the increase in odor associated with the process
water facility. The applicant responded that the majority of the odor is caused in the
aerobic process and that a dome covers that particular basin. The system is sealed and
there is considerable effort made to contain the odor.
BACKGROUND
The staff report states the following:
1. Background
The surrounding zoning and land uses are as follows:
N: I; Outside Storage and Vacant (City of Fort Collins Streets Facility)
S: T; Vacant (Poudre Development "Oxbow" Parcel)
S: R-L; Existing Single Family (Buckingham)
S: I; Industrial (Phelps-Tointon Millwork and Vanworks)
E: R-L; Existing Single Family (Andersonville)
W: E; Existing Employment Park and Nightclub
The following approvals have been granted to New Belgium Brewery:
1.) Initially approved as an I-P Site Plan Review in March of 1995 on 4.54
acres.
New Belgium Brewery Expana„m-Process Water Facility PDP
Administrative Hearing
July 18, 2001
Page 2 of 8
STAFF RECOMMENDATION: Approval
HEARING OFFICER DECISION: Approval, with conditions
ZONING DISTRICT: ( I )- Industrial
NOTICE OF PUBLIC HEARING: Notice of public hearing was made on July 3, 2001 by
mailing to property owners within 1,000 feet of the subject property.
The public hearing was advertised in the Coloradoan.
PUBLIC HEARING
After reviewing the Staff Report and recommendation, a public hearing was held on the
subject application at 4:30 PM on July 18, 2001. The hearing was held in Conference
Room A at 281 North College, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The following is a list of those who attended the meeting:
From the City:
Ted Shepard, Chief Planner
Sheri Wamhoff, Development Review Engineer
From the Applicant:
Angie Milewski, BHA Design
Luke Oldenburg, BHA Design
Floris Delee, NBB
Fred Porter, NBB
Dennis Shipee, NBB
Kim Jordan, NBB
Patricia Kroetch, North Star Design
From the Public:
Tom Baca, Jr., owner and resident of 224 1st St.
Written Comments:
None
Commi y Planning and Environmental xvices
Current Planning
City of Fort Collins CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
HEARING OFFICER: Cameron Gloss
Current Planning Director
PROJECT NAME: New Belgium Brewery Expansion — Process Water
Facility, Project Development Plan
CASE NUMBER: #1-95D
APPLICANT: New Belgium Brewery
C/o BHA Design
4847 Innovation Drive
Fort Collins, CO 80525
OWNER: New Belgium Brewery
500 Linden Street
Fort Collins, CO 80524
PROJECT DESCRIPTION:
This is a request for a Process Water Treatment Facility, consisting of a series of ponds
and a small building, for the purpose of treating water that has been used in the brewing
process. There would be chemical storage within the proposed building. The site is 42
acres in size divided between two lots. The Treatment Facility would be on Lot One.
Lot Two would remain undeveloped at this time subject to a future P.D.P. The site is
located on the north side of Buckingham Street between the existing brewery on the
west and Lemay Avenue on the east. The parcel is bounded by the City of Fort Collins
Streets Facility on the north. The site is zoned, I, Industrial.
SUMMARY OF RECOMMENDATION AND DECISION:
The proposed land use is considered light industrial and complies with the approved
Overall Development Plan and is a permitted use in the Industrial zone district. The
P.D.P. complies with Development Standards of the Industrial zone. The P.D.P. also
complies with the applicable General Development Standards.