HomeMy WebLinkAboutNEW BELGIUM BREWERY, PROCESS WATER FACILITY - PDP - 1-95D - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (3)51 Issue Contact. Jeff Hill
Provide a steel casing (including a detail) around 8-inch water main at the future
rail spur crossing. Maintain 15 feet separation between the center line of the
proposed rail spur and the water main.
Zoning
2 Issue Contact: Jenny Nuckols
Chain link fences are n t all ed - 3.8.11(B)
7-10-01 Is the chain link nce for screening purposes or security purposes?
3.8.11(B) does not al, . f r screening - please clarify.
4 \ Issue Contact. Jenny Nuckols
Site plan - need to see building envelope, dimension, distance to property lines
7-10-01 REPEAT COMMENT
6 Issue Contact: Jenny Nuckols
General notes #5 - refers to building and pole mounted lighting but I don't see
any lights referenced on the site plan or elevation - please review
7-10-01 REPEAT COMMENT
Be sure and return all of your redlined plans when you re -submit.
If you have questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
TED SHEPARD
City Planner
7 of 7
31
Issue Contact. Basil Hamdan
Floodplain Issues:
1. In the drainage report, describe the site as being 500-year floodplain and list the FEMA
map panel #, map date, and 500-year flood elevation. Include a copy of the FEMA map with
the site location marked on the map.
2. Please describe the critical facility floodplain regulation that applies to this site. Describe
what you did to mitigate (i.e. fill to remove yourself from the floodplain). Describe the
elevation of the ponds and the structure where chemical storage is located relative to the
500-year flood elevation.
3. On the drainage plan, please list the 500-year flood elevation.
4. Please submit a floodplain use permit with $25 permit fee. Include letter from Stuart and
Assoc. about the ponds. Include architectural elevations showing floor elevations of the
structure relative to the floodplain.
Transportation Planning
27 Issue Contact: Mark Jackson
-Need to make improvements to frontage on Buckingham, including connection
of sidewalk from its current termination at 1st street east to site boundary.
Improve sidewalk, parkway, bike lanes to Collector Street standards.
29 Issue Contact: Mark Jackson
Buckingham cross section shown in the TIS is incorrect. 4' Bike Lanes are not
satisfactory.
Water Wastewater
17 Issue Contact: Jeff Hill
Match the invert of the proposed sanitary sewer service to the crown of the
existing sanitary sewer trunk.
48 Issue. Contact: Jeff Hill
Show all water and sewer lines on the landscape plans and provide required
landscape/utility separation distances.
49 Issue Contact. Jeff Hill
Provide on site and offsite utility easements for the proposed water mains and
fire hydrant.
50 Issue Contact. Jeff Hill
Provide a flow monitoring/sampling manhole on the 6-inch sanitary sewer
service.
6of7
FA
24
25
26
Issue Contact: Basil Hamdan
Outfall Issues:
The plan does not address where the flows leave once they are released form
the site.
There seems to be several locations where undetained runoff could leave the
site.
Please direct all developed flows to proposed water quality/detention pond.
There is no planned outfall shown for the releease from the pond. As previously
mentioned at the ODP stage, the proposed pond would drain seemingly into the
existing borrow ditch along Lemay..
The City and the County have agreed that no new developed dtrainage should
be
directed toward the Lincoln Stret ditch since it is caiusing flooding in existing
County
businesses. Please contact City and County staff to schedule a meeting to
discuss
Issue Contact: Basil Hamdan
Landscape Plan issues:
The propsed landscape plan does not address what will be done as far
as landscaping in the proposed detention/water quality pond.
The seeding of native non -irrigated grasses as shown on the Landscape
Plan should be reflected on the Erosion Control Plan.
Issue Contact., Basil Hamdan
Report Issues:
Please stamp report.
Why were the release rate of 0.2 cfs for mainor storm and 0.5 cfs for major
storm
mentioned in the report ? This site is in Dry Creek Basin mostly and does not
have these
release criteria.
Please provide more discussion in the report for the proposed outfall
and where would the site drain.
5 of 7
20
21
22
23
Issue Contact: Basil Hamdan
Drainage issues:
The drainage plan should show flow arrows indicating the general direction of
flows.
A legend should be added to the drainage plan.
Please provide a drainage as well as a pond summary table on the drainage
plan.
The grading is such that there is nothing to prevent flows from the proposed
wastewater
treatment facility from flowing off -site undetained. Please correct.
Basin lines do not follow shown grading. Basin lines do not close.
It seems that more drainage sub -basins should be delineated to reflect the
proposed grading.
There are concentrated flows from the West that are being directed toward
Buckinqham Street; how will these flows be handled ?
Issue Contact. Basil Hamdan
Erosion Control issues:
All disturbed areas should be seeded and mulched.
Call out sediment trap at the water quality pond outlet.
Make sure silt fence is tied in continuously around the site.
Please make sure that construction schedule BMP's match
those shown on the plan.
Provided efficiency calcs do not reflect BMP's shown on the plan.
Please provide a security deposit cost estimate calculation in
the report.
Issue Contact: Basil Hamdan
Utility plan issues:
Please clarify on the utility plan what lines are existing and which one(s) is
proposed.
It seems that not all existing storm lines are shown as existing according to plan
key.
Please call out class of proposed storm sewer.
Issue Contact: Basil Hamdan
Detail sheet issues:
The provided detail for the detention/water quality outlet pond is generic.
Please provide all actual inverts and proposed water surface elevations
on the detail sheet in a form that can be built by the contractor.
Please show proposed water quality detail with proposed orifice sizing
as per calculation in the report on the shown detail.
Provide a spillway detail for the pond. The spillway should be protected
agianst rosion.
Please call out the pipe size on the trench drain detail.
4of7
PFA
7
8
11
12
13
Issue Contact., Ron Gonzales
ACCESS
A fire lane will be required. Submit a plan for review/approval prior to start of
construction.
Issue Contact: Ron Gonzales
WATER SUPPLY
A fire hydrant is required w/in 300 ft of the building. Thereafter, they are
located on 600 ft. centers down the street and/or fire lane.
Issue Contact. Ron Gonzales
FIRE SPRINKLERS
Sprinklers required for expansion fire protection.
Also required in H-7 Occupancy.
Issue Contact: Ron Gonzales
HAZMAT
Enough hazmat (corrosives) to warrant H-7 Occupancy. All UFC Art. 80
systems required for use and storage of corrosives.
KNOX BOX REQUIRED
Stormwater Utility
m
19
Issue Contact: Ron Gonzales
Issue Contact: Basil Hamdan
Plat issues:
Please dedicate on the plat all necessary drainage
easements for the proposed detention/water quality ponds on the property.
Please call out BFE and floodplain name on the plat. Show floodplain
limits if applicable.
Issue Contact., Basil Hamdan
Grading issues:
The grading plan does not match up with the drainage plan.
It seems that there are basin divides that are not indicated
by the drainage plan.
Call out spillway location and elevations on the grading plan.
The grading plan is missing some of the existing grading on sheet 4.
The slopes should be called out at several locations rather than the
generic indication of "slope varies".
3 of 7
37
38
39
40
41
42
43
44
45
Issue Contact. Sheri Wamhoff
Add notice to the plat regarding maintenance of private drives. (See attached
for copy)
Issue Contact: Sheri Wamhoff
Show the widths of the adjacent row. Provide easement for the ditch relocation
that is needed at the southwest corner.
Issue Contact. Sheri Wamhoff
Need to dedicate the 9-foot utility easement behind the row on Buckingham.
Issue Contact: Sheri Wamhoff
Need to show the connection over to the existing site on the site plan that is
shown on the utility plans. Need to show all improvements that are to be done
with this project.
Issue Contact: Sheri Wamhoff
Need to show the improvements to the frontage of the property that are to be
done
Issue Contact: Sheri Wamhoff
What are the things (structures?) associated with the rail spur?
Issue Contact: Sheri Wamhoff
What is to happen to the existing north fence where the rail spur will cross the
property lines?
Issue Contact: Sheri Wamhoff
It is not quite clear what is new and existing grading or structures.
Issue Contact: Sheri Wamhoff
Need to show an easement on the plat for the detention pond and outlet.
Natural Resources
30
Issue Contact. Doug Moore
Has the City Forester reviewed the two tree to be removed?
• Two Existing Plains Cottonwoods, one 24" and the other 36" are shown
as being removed. Has the City Forester look at these tree to determine
if they are consider significant under the Fort Collins Land Use Code? If
these trees are significant what mitigation or protection is being
recommended under the Tree Preservation Standards. 3.2.1(F)
2 of 7
STAFF PROJECT REVIEW
City of Fort Collins
BHA Design Date: 7/17/01
Luke Oldenburg
4803 Innovation Drive
Fort Collins, CO 80525
Staff has reviewed your submittal for NEW BELGIUM BREWERY - PROCESS WATER
FACILITY, PDP, #1-95D, and we offer the following comments:
ISSUES:
Engineering
32
Issue Contact: Sheri Wamhoff
Need to dedicate row for Buckingham with this plat. Needs to be adequate row
to accommodate a 58-foot flowline to flowline section. This will provide for a
parking lane on the south side of the street and for the center turn lane that is
needed as per the traffic study. The additional row needed for the for the left
turn lane will need to come from this property, since it is this property that is
requiring the left turn lane.
33 Issue Contact. Sheri Wamhoff
The row needed for the Lemay frontage will be looked at at the time that that
portion of land is developed. Hopefully at that time we will have a better idea of
what Lemay will look like adjacent to this property.
34 Issue Contact: Sheri Wamhoff
Improvements are needed on Buckingham to connect this site to the existing
improvements. Need to build the entire street section. Buckingham is a
collector and therefore is eligible for street oversizing reimbursement. The
developer is responsible for the costs for the local street portion. This treatment
facility is extends further south than what was discussed in prior meetings. Not
leaving a developable parcel between the south edge of the plant and
Buckingham therefore the adjacent street improvements need to be done at this
time.
35 Issue Contact: Sheri Wamhoff
The rail spur is shown on the utility plans, but is not shown on the site plans. If
this is to be approved as a part of this project it needs to be shown on both sets
of plans. Agreements will need to be worked out with streets facility for the rail
spur before it can be approved on these plans.
36 Issue Contact: Sheri Wamhoff
Please use the current general notes (see attached - I can also email a copy to
you if you like) for all projects submitted under the new street standards.
1 of 7