Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY, PROCESS WATER FACILITY - PDP - 1-95D - CORRESPONDENCE -Sent By NEW BELGIUM BREWING; 970 221 0524; Jul-2-01 4:22PM; Page 4/4 �} Diesel Fdel to be stored outside above 500-yr flood plain. tus we discu%ed I would like to wait until July 20*' 2001 to submit a final HMMP this will allow for pdated drawings. If I don't hear anything to the contrary form you I will assume that this is okay ith you_ feel that it i* important that you know we have the utmost respect for by Poudre Fire Authority and all of yot firefighters we know that have an extremely dangerous job to do. With this nderstandinO we will meet all written specifications forwarded by to us by August 1, 2001 from e by Poudrii Fire Authority. Please don't hesitate to offer any feedback or suggestions that you ay have. Ted Shepard City of Fort Collins, Planning Department Sent By: NEW BELGIUM BREWING; 970 221 0524; Jul-2-01 4:21PM; Page 3/4 St. 80524 BREWING COMPANY, INC. 500 Linden Street Fort Collins, Colorado 80524 USA Phone-, (970) 221-0524 fax'(970) 221-0535 www.newbeigium.com Hazardous Material Management Plan (HMMP) for process water treatment plant on Thursday we have made some Changes to the proposed plant, which will P. Below I have listed all of the hazardous materials and quantities that will be Hazard ` us Material Maximum Quantity Storage Location iu o><Wo (NoOH) 1500gal Chemical Storage Building dr ; lock aGd (HCL) IlWgat Chemical Storage Building eC�'Wide (FeCI�) F 1500 gal Chemical Storage Building Methane(CH.)) 23,000 fe Outside contained In anaerobic basin Fuel 500 gal _- outside storage tank Chemicaistorage building will be above 500 year flood plain Concentration of Ferric Chloride is unknown. Awaiting response from vendor on availability of different Ooncentretions. Bio-Gas krill be stored outside above the anaerobic lagoon_ The maximum pressure of bladder 411 be 0.05 psi above atmospheric pressure. Gas will be transported into operations building tb gas compressors which will be located on lower level then to brewery via buried pipe liner All gas pipes will be pressure tested to meet specification forwarded by Poudre Fire Authority. There wibe a flare on -site for burning Bio-gas during periods of poor quality gas production and at s up. The intention is to use 100% of the Bio-gas for production of electricity. Howeverhe co -generation equipment will not be completely installed until march of 2002. so all gas that is produced until that time will be burned in the flare. The flare will burn 3530ft3/hr at a pres re of 0.7 psi. Sent By: NEW BELGIUM BREWING; 970 221 0524; Jul-2-01 4:21PM; Page 2/4 30, Of Fort C�Ilins Collins, tQk� 80524 BREWING COMPANY, INC. 500 Linden Street Fort Collins, Colorado 80524 USA Phone: (970) 221-0524 fax:(970) 221-0535 www.newbeloium.wrn ou. r° t0D t�' J' e: Street improvement schedule for Buckingham Street ,ear Sheri, s we discus4od at the meeting on June 25'" I have put together a schedule for the improvemcnts on uckingham %. on the south side of the brewery property. The improvements would start whoro the idewalk end%adjacent to First Street and continue based on the schedule below. We propose the following -hedule: T/Mr N V =SJ vE" The first „Iq0 id, starting at the end of the current sidewalk adjacent to first street to a point Pr approxim4 00' ast This would be completed with the Process Water Treatment Plant project W r -r K H approxim4 y 112002.� G M1 IA .LK ) The next 0-foot sa�Eion progressing eastward would be completed 2 years later. Approximately P-.) S (, 112004. > P P. S � t ) The final j00-f0ot section would be completed 2 years later. Approximately 112006. 0 G r, v� he improverriBnts included in this proposal would be the same as those shown on the horizontal street detail rovided by N6rth Star design. Drawing Ill_. Belgium Brewing Co. Inc. Is committed to being a responsible corporate citizen and we understand the for partitpating In projects such as this_ We are a growing ousiness and as such we are investing all of ee capitt into our faclilty, which increases the tax base and creates jobs for the community. We .clate youp help In working with us to create a time schedule that will allow us to complete these ivementsJrvithout constraining us to a point where we need to slow our expansion and possibly lose et share. ,,As you know we are already committed to installing a state of the art process water treatment y to lessgh our impact on the city utilities. The timeframe that I have laid out above will allow us to Bete the street improvements that Buckingham street needs while at the same time we will be able to rid rapidly, enough to maintain our markets. I appreciate your willingness to work with us on this. Ted Shepaid City of Fort Collins, Planning Department Sent By: NEW BELGIUM BREWING; t Ili 970 221 0524; Jul-2-01 4:21PM; Page 1/4 -J of DRINK GOOD BEER ERCYYING COMPANY, INC. 500 Linden Street •-Fort Collins. Colorado 80524 USA (970) 221-0524 . (970) 221-0535 www newbelgium.com 0 including thls cover: 1V HUTT JUL 0 2 2001 D Fax Number: % ! za 0 Phone Number: Date: lL flCiy 4r �1'1C hR,f Ile s//slV•s p/t..re C4 BIG FAT FUN