HomeMy WebLinkAboutNEW BELGIUM BREWERY, PROCESS WATER FACILITY - PDP - 1-95D - CORRESPONDENCE - RESPONSE TO CITIZENNET THBORHOOD INFOW TATION MEETING
s for
Arm =�-mProject: 11e„� 8�las�� • SDP
u,. Meetin2 Location:_-�� 4-,b -
y o� � � h+•�
Citf Fort Collins
' Date: --/io,Li
- Attendees: Please sign this sheet. The information will be used to
.4 update the project mailing list and confirm attendance at neighborhood
meetings. Contact the Planning Department (221-6750) if you wish to Did You Receive Correct
receive minutes of this meetingWrittenNotiFcation Address.
;l
of this meeting?'
v
►%
Name Address Zip,
Yes
No
Yes
No
Gi►SG�d F�ilrMes (�ob�nSon . e'�y or Ff Ccl('�s
PS
�7 l�rtilcs (r7rT/vlie Fr� F1 rf sa
I
x
p� d
/f/jct
Uf
_ . 4 Cow a S 31
fp�a�I
X�
KA(C/ boo uriNul
r Z- z
X
�rnu A ormiin 3901 �u�on�u liar JJj Zoa CDsZ S
2„ �s
-
Comma y Planning and Environmental -vices
Current Planning
City of Fort Collins
Dear Resident:
July 26, 2001
Thank you for attending the neighborhood information meeting regarding the New
Belgium Brewery - Process Water Facility back on July 10, 2001. As a follow-up to
that meeting, both the City Current Planning Department and New Belgium Brewery
would like to make a correction to a statement that was made in response to a question.
The minutes to that meeting reflect an inaccuracy that needs to be clarified.
The original question was:
"How safe is the pond regarding seepage or other unsafe accidents?"
The original and misquoted answer that was provided was:
"All ponds have a state of the art metal lining with pressurized welds, not
concrete, so they have a longer life span (60 years).
The correct answer is:
All ponds will have a state of the art HDPE (plastic) lining with pressurized
welds. The life span of HDPE (plastic) is much greater than either metal or
concrete (60 years).
This letter is offered as a correction so that everyone has the most accurate information as
possible. If you have any further questions about the HDPE plastic liner, or about any
other aspect of the New Belgium Brewery operation, or the City review process, please
contact either of the two following persons:
Ted Shepard
City of Fort Collins
Chief Planner
281 N. College Avenue
Fort Collins, CO 80524
221-6750
Sincerely:
,*�V - jtx-f
Ted Shepard
Chief Planner
Fred Porter
New Belgium Brewery
Project Manager
500 Linden Street
Fort Collins, CO 80524
221-0524