Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY, PROCESS WATER FACILITY - PDP - 1-95D - CORRESPONDENCE - RESPONSE TO CITIZENNET THBORHOOD INFOW TATION MEETING s for Arm =�-mProject: 11e„� 8�las�� • SDP u,. Meetin2 Location:_-�� 4-,b - y o� � � h+•� Citf Fort Collins ' Date: --/io,Li - Attendees: Please sign this sheet. The information will be used to .4 update the project mailing list and confirm attendance at neighborhood meetings. Contact the Planning Department (221-6750) if you wish to Did You Receive Correct receive minutes of this meetingWrittenNotiFcation Address. ;l of this meeting?' v ►% Name Address Zip, Yes No Yes No Gi►SG�d F�ilrMes (�ob�nSon . e'�y or Ff Ccl('�s PS �7 l�rtilcs (r7rT/vlie Fr� F1 rf sa I x p� d /f/jct Uf _ . 4 Cow a S 31 fp�a�I X� KA(C/ boo uriNul r Z- z X �rnu A ormiin 3901 �u�on�u liar JJj Zoa CDsZ S 2„ �s - Comma y Planning and Environmental -vices Current Planning City of Fort Collins Dear Resident: July 26, 2001 Thank you for attending the neighborhood information meeting regarding the New Belgium Brewery - Process Water Facility back on July 10, 2001. As a follow-up to that meeting, both the City Current Planning Department and New Belgium Brewery would like to make a correction to a statement that was made in response to a question. The minutes to that meeting reflect an inaccuracy that needs to be clarified. The original question was: "How safe is the pond regarding seepage or other unsafe accidents?" The original and misquoted answer that was provided was: "All ponds have a state of the art metal lining with pressurized welds, not concrete, so they have a longer life span (60 years). The correct answer is: All ponds will have a state of the art HDPE (plastic) lining with pressurized welds. The life span of HDPE (plastic) is much greater than either metal or concrete (60 years). This letter is offered as a correction so that everyone has the most accurate information as possible. If you have any further questions about the HDPE plastic liner, or about any other aspect of the New Belgium Brewery operation, or the City review process, please contact either of the two following persons: Ted Shepard City of Fort Collins Chief Planner 281 N. College Avenue Fort Collins, CO 80524 221-6750 Sincerely: ,*�V - jtx-f Ted Shepard Chief Planner Fred Porter New Belgium Brewery Project Manager 500 Linden Street Fort Collins, CO 80524 221-0524 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020