Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY - OVERALL DEVELOPMENT PLAN - 1-95C - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT EXTENSIONFebruary 8, 2001 Mr. Ted Shepard, Chief Planner City of Fort Collins Planning Department 281 North College Avenue Fort Collins, CO 80521 RE: New Belgium Brewery ODP Dear Ted, We would like to request an extension to the resubmittal deadline for the New Belgium Brewery Overall Development Plan. Since receiving city comments on November 13, 2000, we have met with city staff on several occasions to review outstanding issues including storm drainage, traffic, and issues relating to road locations. New Belgium and the Neenan Company have been working concurrently on designs for the proposed Wastewater Treatment facility that will be an initial construction phase in the ODP area. They have recently returned from a trip to Germany where they researched several types of similar facilities. There is still some discussion of which design would be most suitable for the New Belgium site. Some of the design types would affect the size required for the facility (open ponds vs. underground), or its location in relation to the 500-year floodplain. Since we are now illustrating the approximate size and location of the facility on the ODP plan, we would like to be able to correctly reflect this information based on the design chosen by New Belgium. Since it is City policy that plans be resubmitted within 90 days of the date of the review letter, our resubmittal is due by Friday, February 9, 2001. We are requesting a 30-day extension to the resubmittal deadline to help resolve this issue. Sincerely, bha design inc. by Q IvVl� Angela IC. Milewski CC" Kim Jordan, New Belgium Brewery Bob Mooney, Neenan Company Fred Roberts, Neenan Company LnN Dse ArE ARI"NIIEC.TURE LIR9AN VENIGN PLANNINL: UNA W514S.N. INC. •A01 INNOVATION DRIVE rt. eo L.." en AAa,a 1EL 07R 111.7177 IA[ n,R 221.1A27 2'd L281-6221OL6) WSIS3Q HH8 eag:60 10 BO cla3