February 20, 2001
LANDSCAPE ARCHITECTURE
Mr. Ted Shepard
URBAN DESIGN
City of -Fort Collins
PLANNING
281,North College Avenue
Fort Collins, CO: 80521,
RE: New, Belgium Brewery ODP -
Dear Ted,
`
BHA UESIGN,'INC. •
•. '. "
Thank you for your,comments on the New Belgium Brewery Overall Development
4803 INNOVATION DRIVE
CALL NS.,GD ROS l3
" Plan. Since receiving the'redlined plans, we have miet with various, city departments
TE, 9)U 2l3.7577
to clari fy comments made during the review; We would like to submit the enclosed
FAX 970 333-1917
drawings for your review. All comments were corrected on the plans with the
following exceptions or clarifications:
Comment #/Response
4."` We `met with staff regarding the offset drive access along. Buckingham
Street. We have shown the'access centered between2nd Street and 3rd
Street, and have included additional turning analysis information as
requested by Traffic and Engineering Departments. We understand that if
"
the access location is approved on the ODP, New Belgium will be still be
required to pursue avanance request at the time of the'Project
Development Plan for this development•area. -
5., While New Belgium owns the'entire 'property east to Lemay Avenue; they
have immediate plans -for expansions that would encompass only the west
' half of the site. We have indicated these areas,in more detail on the ODP
plan (brewery/warehouse expansion, community center, and wastewater
facility).'East of this area is'shown_as Industrial' use, but at this time -it is
unknown how this will be developed. For this reason, ibis difficulfto '
predict which access points, will be required exclusively for truck use or
' `haul routes'. Wehaveidentified the truck access points that are planned to
service the north side of the brewery facility and the wastewater treatment
facility„ and have shown the, employee/visitor; entrances, but have, given no,
.
further,indication of the future of the access points on the east half of the
site:
I1. The civilengineer has added a note to the"drainage plans -regarding this,
issue. A meeting will be held'prior_to submittal of any Project Development
Plan for the site that would impact this downstream outfall: