Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY - OVERALL DEVELOPMENT PLAN - 1-95C - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWappropriate connections alone this common property houndar_v. Parking, building and landscape standards as defined in the Land Use Code will be accommodated in each site -specific project development plan for each phase. Please feel free to call if you have any questions or need additional information. Sincerely, bha design 'n Angela . Milewski design September 11, 2000 LANDSCAPE ARCHITECTURE URBAN DESIGN J Mr. Troy ones PLANNING Current Planning Dept City of Fort Collins 281 North College Avenue Fort Collins, CO 80521 RE: New Belgium Brewery ODP RNA DESIGN, INC. Dear Troy, 4805 INNOVATION DRIVE IT. COLLINS. CO A052S Thank you for the comments from the Conceptual Review meeting for the New TEL 970 E t 5 5" Belgium Brewery ODP project. All comments are understood and incorporated into EAR 97 0 223.1827 the ODP plans with the following exceptions or clarifications: Zoning — No exceptions. Many of the comments pertain to site -specific development concerns that will be addressed at the time of each Project Development Plan phase. Stormwater Utility Department —No exceptions. The civil engineer has met with the Stormwater Department to understand the specific requirements for the drainage report. Water and Wastewater Utility— No exceptions. Natural Resources — An ecological characterization study has been prepared as requested. Details for recycling facilities and grass species will be provided at the time of the site -specific project development plan for each phase. Fire Department — Buildings will be sprinkled as required. Chemical storage information and fire hydrant spacing will be defined at the time of the site -specific project development plan for each phase as required. Light and Power — No exceptions. Transportation — A Traffic Impact Analysis has been prepared based on the requirements specified. The feasibility for the potential rail spur connection to the north is continuing to be discussed between the property owner, the rail company, and the City of Fort Collins. Current Planning — We have illustrated access points into the property as defined at intervals not to exceed 660' on all boundaries with the exception of the north boundary. Since the existing facility to the north is a City of Fort Collins facility with secured access areas, we would like to work jointly with the City to develop the