Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY, PROCESS WATER FACILITY - FDP - 1-95E - CORRESPONDENCE - STAFF'S PROJECT COMMENTS56 rV Issue Contact: Mark Jackson Development agreement for Buckingham improvements Have development agreement in place that guarantees improvements to Buckingham, including connection to the existing sidewalk system, occur with the next phase of development and no later than a date to be specified by the City in conjunction with the developer. This is per our meeting with the applicant on June 25th. Sheri Wamhoff and Ted Shepard also were in attendance. Is it appropriate to have a note on the site plan referrinq to this aqreement? Issue Contact. Mark Jackson Repeat previous comment (7/17) re: developer agreement about Buckingham improvements Water Wastewater 77 78 79 80 Zoning 2 4 Issue Contact: Jeff Hill Water mains may not be located in the bottom of drainage swales. Issue Contact: Jeff Hill Provide all information necessary for the steel casing on the proposed water main at the rail spur crossing (Le. Diameter, wall thickness, etc.). Issue Contact: Jeff Hill Include the steel casing detail with the next submittal. if required, include the typical water service and meter pit details. Issue Contact. Jeff Hill Provide sufficient room in the proposed drive for the future water main extension. Issue Contact: Jenny Nuckols Chain link fences arilince owed - 3.8.11(B) 7-10-01 Is the chain for screening purposes or security purposes? 3.8.11(B) does not ascreening - please clarify. Issue Contact. Jenny Nuckols Site plan - need to see building envelope, dimension, distance to property lines 7-10-01 REPEAT COMMENT 3of4 6 Issue Contact: Jenny Nuckols General notes #5 - refers wilding and pole mounted lighting but I don't see any lights referenced on th ite plan or elevation - please review 7-10-01 REPEAT COMM 72 Issue Contact: Jenny Nuckols Above comments don't ap ea t have been resolved. If Planning has ok'd these items, please let me otherwise the above still need to be addressed. Be sure and return all of your redlined plans when you re -submit. If you have questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, TED SHEPARD City Planner 4of4 f Issue Contact: Ron Gonzales WATER SUPPLY A fire hydrant is required Win 300 ft of the building. T 11 Issue Contact. Ron Gonzales FIRE SPRINKLERS Sprinklers required for expansion fire protection. PO o a C T� n ,-rs P4�n,v Also required in H-7 Occupancy. 12 Issue Contact., Ron Gonzales HAZMAT Enough hazmat (corrosives) to warrant H-7 Occupancy. All UFC Art. 80 systems required for use and storage of corrosives. 13 Issue Contact. Ron Gonzales KNOX BOX REQUIRED 58 Issue Contact: Michael Chavez Refer to comments by Ron Gonzales posted 6-5-01 Stormwater Utility 75 Issue Contact: Basil Harridan The retention pond along Buckingham should be called out on the landscape plan and a wetland seed should be specified for that pond as was done for the north retention pond. As a reminder, the applicant will need to submit a floodplain use permit prior to issuance. All other comments by Stormwater were addressed. We are ready ready to accept utility plan mylars. Please provide two additional signed and stamped copies of the drainage and erosion control report along with the mylars for approval. Transportation Planning 27 Issue Contact. Mark Jackson -Need to make improvements to frontage on Buckingham, including connection of sidewalk from its current termination at 1 st street east to site boundary. S&F R Improve sidewalk, parkway, bike lanes to Collector Street standards. 29 Issue Contact: Mark Jackson Buckingham cross section shown in the TIS is incorrect. 4' Bike Lanes are not satisfactory. fgzv«6 ONE 'Osfe-c Z'e-r ck . 2of4 s V 6a STAFF BHA Design Luke Oldenburg 4803 Innovation Drive Fort Collins, CO 80525 %'-rG/� K< L Vic 6- d - PROJECT REVIEW o_3-01 Date: 8/8/01 Staff has reviewed your submittal for NEW BELGIUM BREWERY - PROCESS WATER FACILITY, PDP and FINAL COMPLIANCE #1-95D AND 1-95E, and we offer the following comments: ISSUES: Engineering 60 Issue Contact. Sheri Wamhoff Need to show the new row line on the site and landscape plans What is shown is not correct, per the plat the north half of the row will be 38 feet not 30 feet. 66 Issue Contact. Sheri Wamhoff The ditch easement on the plat is this part of the easement that was dedicated at reception # 9502257? Is this new? If it is new the ditch co will need to sign the plat accepting the easement. As shown the ditch co will need to sign the plat. Provide a signature block for there acceptance of the easement. 73 Issue Contact: Sheri Wamhoff See the plat - an additional foot of row is needed for a total of 22' 74 Issue Contact: Sheri Wamhoff comments on the prelliminary layout design - The 50 foot flow line needs to be measured from the current south flowline. The road section at the future access drive needs to include a 12 foot center turn lane. Shown, but not labeled correctly. The row cross section at this point is 82 feet not 81 feet. The flowline section is 6 feet wider than the standard section for a minor collector. The cross section label below the scale is incorrect. The section here would be the standard section. PFA 7 Issue Contact: Ron Gonzales ACCESS A fire lane will be required. Submit a plan for review/approval prior to start of construction. 1M S , —1-r- &,4,j 1 of 4