HomeMy WebLinkAboutNEW BELGIUM BREWERY, PROCESS WATER FACILITY - FDP - 1-95E - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTSubmittal Checklist �-
Final Compliance Review
The following information is required to be submitted, unless waived, with all applications.
Any item waived must be dated and initialed by a planner with the City of Fort Collins
Current Planning Department.
'5k 4- " Application form and filing fee.i I oa-�) - ,1 - .
M k'_-E Final site plan(30 copies). Seethe submittal requirements which outline information
to be presented on the final site plan. 24"x36" (folded)
•3iz '-E] Subdivision Plat (23 copies). (folded)
7VN� Architectural elevations (6 copies). (folded)
Y,NA_� Landscape Plan (20 copies). See the submittal requirements which outline information
to be presented on the landscape plan. (folded)
TN(- ? Soils report (2 copies).
N Drainage and erosion control report (4 copies).
�! ABC [IAn update of the Transportation Impact Analysis (TIA) (6 copies).
Final utility and drainage plans (4 copies). (unfolded)
t/ Subsurface Hydrologic Study (4 copies). i t-\ SUL:6 4 p
/V/A ❑ Other information Director may require.
_Natural area or environmental study
�)H A-'E Name and address of each owner of property within the boundaries of the
development plan area.
V'>Hkk� List of names of all general and/or limited partners, managers and directors and/or
officers and directors of the corporation involved as either
applicants or owners.
NS ❑ Executed deeds of dedication (contingent on final approval).
A/S ❑ Executed recorded agreements (12 copies).
99