HomeMy WebLinkAboutNEW BELGIUM BREWERY, 4TH FILING, PACKAGING HALL - FDP - 1-95G - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (3)Number: 104 Created: 4/11/2006 [4/11/06] Add Detail 4B which pertains to water main lowerings. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: / ; Ted Shepard Chief Planner Page 5 Department: Stormwater-Water-Wastewater Topic: Sediment/Erosion Control Number: 97 [4/ 10/06] April 10, 2006 Issue Contact: Basil Hamdan Created: 4/10/2006 1. There should be a note on the E.C. plan indicating that disturbed areas are to be seeded and mulched (the pond ?) or landscaped. 2. The report indicates silt fencing on the north south and east sides, the plan shows it only on the north and east. You probably don't need it on the south because of the pond. Please make sure the report, plans, and calculations are consistent in BMPs used. Topic: Utility plans Number: 101 Created: 4/11/2006 [4/11/06) Please specify what will be done to the abandoned storm drain outlet for the detention pond. Are street improvements being built with this project or escrowed for ? At the very least, the new pipe outlet from the detention pond will need to be built with the Packaging Hall project. If street improvements are not done now, show phasing including stub from proposed pipe in Buckingham. Please provide a phasing plan showing what will be done with interim improvements and ultimate improvements. The interim plan should cover both grading and utilities. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Water/WW Number: 69 Created: 12/21 /2005 [4/11/061 Table with elevation data for pipes needed. [1/25/061 Provide details on any lowerings needed. [12/21/051 Is there a conflict between water service/fire line and the NWCWD 24-inch main? Pothole now. Number: 86 Created: 1 /25/2006 [4/11/06) Has this been answered? [1/25/06) Check with New Belgium on 3-inch water service. They are reviewing options. Number: 87 [4/11/06] Created: 1 /25/2006 [1/25/06] Complete the easement vacation for the pipe bridge. Number: 88 Created: 1/25/2006 [4/11/06] [1/25/06] See utility plans for other comments. Page 4 in - Show Buckinghman right-of-way in the same manner as the 3rd Filing. - A monument is needed at intervals not to exceed 1400' -What is "(R1)"? - Bearing and distance information is missing at the First Street intersection. - An area is drawn but isn't indicated along Linden Street. - See redlines for further comments. Number: 102 Created: 4/11/2006 [4/11/06] "PIE" for the realigned ditch doesn't appear to be defined anywhere. Number: 110 Created: 4/19/2006 [4/19/06] If "PIE" is intended as an easement dedicated to Coy Ditch then the Certificate of Dedication on the plat will need to be looked at and possibly amended as the Certificate of Dedication spells out that streets and easements on the plat are dedicated and conveyed to the City. Department: Stormwater-Water-Wastewater Issue Contact: Basil Harridan Topic: Easements Number: 99 Created: 4/11 /2006 [4/11/06] Please provide easement for the temporary off -site pond. Please clarify when ditch company signatures will be obtained. Topic: Floodplain Number: 100 Created: 4/11 /2006 [4/11/06] A Floodplain Use Permit will need to be provided prior to construction. Topic: Off -site Pond Design Number: 106 1Created: 4/13/2006 [4/13/06] Please provide a revised pond grading plan. Please specify how the off -site pond will be vegetated. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: Plat Number: 65 Created: 12/21 /2005 [4/11/06] The hydrant near the new process water treatment building is to be relocated soon. It would seem to be most efficient for New Belgium to revise easement on this plat. In addition, provide easement for the west hydrant that is now shown to be relocated. Check easement for the hydrant near the sanitary sewer that is being relocated. And add easement in the gap between the water main easements with the reception numbers of 2002077114 and 2002067374. [1/25/06] Also, check easement for the fire hydrant recently re -located north of the new building near the waste treatment facilities to see if additional easement is needed. Location of that hydrant on Sheet 4 is incorrect. [12/21/051 Provide easement for the re -located fire hydrant. Page 3 19 Topic: General Number: 90 Created: 1 /30/2006 [4/11/061 Carried over for reference as the plans currently indicate the use of the off -site temporary pond. [1/30/06] The creation of the temporary detention pond on the south side of Buckingham Street requires the responsibility of frontage improvements for Buckingham and First Street abutting the pond per 24-95 of the City Code. This item will need more discussion, after hearing and as discussion continues with the Bohemian Foundation. Number: 107 Created: 4/18/2006 [4/18/06] On all the documents other than the plat, please add "4th Filing" after "New Belgium Brewery" in order to help tie it to the plat and the order from previous filings. Number: 108 Created: 4/18/2006 [4/18/06] Please add the word "access" after "pedestrian" to read as "pedestrian access easement" for the "pedestrian easement" dedications shown on the plat (or just remove "pedestrian" and call it "access easement"). Number: 109 Created: 4/19/2006 [4/19/06] Please add an access ramp on the northwest corner of the Third Street and Buckingham Street intersection. Topic: Plan Approval Number: 105 Created: 4/12/2006 [4/12/06] Before the final plan approval signatures on the plat and plans (as appropriate) and/or signed offsite easements must be secured. Topic: Plat Number: 29 Created: 9/2/2005 [4/11/06] With the plat now revised to show "PIE" and a blank area for a reception number, the intention appears to be that an easement from the Ditch Company is intended to be finalized prior to the plat being signed, in which case the Ditch Company signature block wouldn't appear to be needed anymore (provided that the easement is conveyed). If a direction is established in which an agreement with the Ditch Company is not finalized, the information on the plat will likely need to be modified in some manner. [1 /30/06) Carried over for reference as unresolved. The creation of an "irrigation easement" on the plat is problematic as the certificate of dedication has noted that easements shown are dedicated to the City and the Coy Ditch is mainly a private system. [12/21/05] Appears to be unresolved. The plat shows an irrigation easement while the certificate of dedication states easements are conveyed to the City and the irrigation line is not the City's. [9/2/05] The plat indicates an "irrigation easement" which appears to be dedicated with the plat. As the dedication statement dedicates all easements to the City, it appears this ditch easement should be indicated otherwise. More than likely, an easement will need to be dedicated to the Coy Ditch Co. by separate document, with the recording information provided on the plat. Number: 92 Created: 1 /30/2006 [4/12/06] Technical Services provided comments redlined with Engineering's Plat. Please ensure they are routed a copy of the plat with the next resubmittal. [1/30/06] Technical Services provided the following comments: Pa,-e 2 STAFF PROJECT REVIEW City of Fort Collins BHA DESIGN, INC. Date: 04/19/2006 LUKE OLDENBURG 4803 INNOVATION DR. FORT COLLINS, CO 80525 Staff has reviewed your submittal for NEW BELGIUM BREWERY, PACKAGING HALL & BUCKINGHAM ST PDP & AMENDED ODP AND FINAL PLANS - TYPE II, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Marc Virata Topic: Buckingham Street Plans Number: 41 Created: 9/13/2005 [4/11/06) The current plan appears to have changed from the previous further reducing the amount of cover over the irrigation pipe. The previous proposal was not to standard but we agreed internally to accept; the present proposal is problematic though. We need the minimum clearance shown on the previous plan which as a result appears water main lowerings are needed. [1/30/06] The cover amount with the HERCP pipe is still not per standards however it is acknowledged that the amount will be acceptable given the constraints. [12/21/05] The profile sheet for the Coy Ditch does not show a proposed grade line tosee if this issue was resolved. [9/13/05] The amount of cover over the crossing in which the realigned ditch ties into is less than standard. That combined with the structure being corrugated metal raises a general concern. We would want to see the corrugated metal pipes removed and replaced with twin elliptical pipes (RCP?) to achieve better cover and provide a pipe type that is to standard. Number: 46 1 Created: 9/14/2005 [4/11/06] The information now shown specifies curve radii as 5' in some locations. The 15' curve radius should be used in all location as specified for FLC 1 and FLC 2. [1/30/06] Carried over, appears to be unresolved. [12/21/051 Appears to be unresolved. With the curb extensions, this information is needed. [9/14/05] Provide flowline curve/line table data for verification. The inset parking narrowing appears fine bt I'd like to see the radii specified just to be sure. Number: 95 Created: 1 /30/2006 [4/11/06] Comment does not appear to have been addressed._ I __-- [1/30/06] The street repair limits shown with the signing and striping plan shows that the patching limits will need to be expanded as the eastbound through lane does not match up with the patching limits. Please expand the patching limits. Number: 103 Created: 4/11 /2006 [4/11/061 A phasing plan appears to be needed if the Developer is definitively going to pursue postponing the road improvements so that it is clear what improvements are proposed and needed with the development of the onsite facility that may fall within and external to the "onsite" portion. Page 1