HomeMy WebLinkAboutNEW BELGIUM BREWERY, 4TH FILING, PACKAGING HALL - FDP - 1-95G - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS97. 1) Added notes to specify disturbed area to be seeded or landscaped.
2) Revised drainage report to state silt fence on north and east only.
101. 1) Added notes to specify to remove or plug and flowfill.
2) By others to decide if escrow or not. Outlet pipe is proposed with phase
1, see revised plans.
3) Added Phasing Plan
69. Added water line lowering table
86. Yes. 2"
87. See revised plat
88. See Revised utility plans.
104. Added detail
May 3, 2006
Hello Ted;
Here are responses to comments on New Belgium Brewery, dated April 19, 2006.
41. See revised profile.
46. See revised horizontal plan
95. Street repair limits has been expanded to the striping. Cut lines have been
removed and noted as to not be located under automobile wheel paths.
103. Added Phasing Plans
90. Temporary detention pond is still being proposed
107. Added FOURTH FILING to all of the utility construction plans and site and
landscape plan.
108. Revised to say "access easement'
109. Added ramp
105. Acknowledged
29. A signature place for the ditch owners is not shown, but a signature spot for
Darin Atteberry, City Manager has been shown. The language will
convey the tract of land to the City and the City is not responsible for
maintenance of the ditch.
92. Acknowledged
102. Acknowledged, PIE is now defined on the plat.
110. Acknowledged
99. See revised plat.
100. Acknowledged. Will obtain prior to construction
106. Added notes to specify native dry land grass to be planted.
65. See revised Plat