Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY, 4TH FILING, PACKAGING HALL - FDP - 1-95G - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS97. 1) Added notes to specify disturbed area to be seeded or landscaped. 2) Revised drainage report to state silt fence on north and east only. 101. 1) Added notes to specify to remove or plug and flowfill. 2) By others to decide if escrow or not. Outlet pipe is proposed with phase 1, see revised plans. 3) Added Phasing Plan 69. Added water line lowering table 86. Yes. 2" 87. See revised plat 88. See Revised utility plans. 104. Added detail May 3, 2006 Hello Ted; Here are responses to comments on New Belgium Brewery, dated April 19, 2006. 41. See revised profile. 46. See revised horizontal plan 95. Street repair limits has been expanded to the striping. Cut lines have been removed and noted as to not be located under automobile wheel paths. 103. Added Phasing Plans 90. Temporary detention pond is still being proposed 107. Added FOURTH FILING to all of the utility construction plans and site and landscape plan. 108. Revised to say "access easement' 109. Added ramp 105. Acknowledged 29. A signature place for the ditch owners is not shown, but a signature spot for Darin Atteberry, City Manager has been shown. The language will convey the tract of land to the City and the City is not responsible for maintenance of the ditch. 92. Acknowledged 102. Acknowledged, PIE is now defined on the plat. 110. Acknowledged 99. See revised plat. 100. Acknowledged. Will obtain prior to construction 106. Added notes to specify native dry land grass to be planted. 65. See revised Plat