Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY, 4TH FILING, PACKAGING HALL - FDP - 1-95G - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLIST. SkA ❑ Certification that notice has been provided to the mineral estate owner (1 copy). 0 NS ❑ Executed deeds of dedication (contingent on final approval). N/k NS ❑ Executed recorded agreements (12 copies). 1 ❑ Other information Director may require. - Natural area or environmental study - Wetland Deliniation Revised February 8, 2006 s Submittal Checksheet Final Plan Review The following information is required to be submitted, unless waived, with all applications. Any item waived must be dated and initialed by a planner with the amity of Fort Collins Current Planning Department. 15141% ❑ Application form and filing fee. ❑ Transportation Development Review Fee — please contact Engineering at 221-6605 for information. -6NA o Name and address of each owner of property within the boundaries of the development plan area. BH0. ❑ List of names of all general and/or limited partners, managers and directors and/or officers and directors of the corporation involved as either applicants or owners. BKA ❑ Final site plan. See the submittal requirements for specific information to be presented on the final site plan. (30 copies 24" x 36" — folded). N1>1 ❑ Subdivision Plat (23 copies 24" x 36" — folded). 10AM ❑ Architectural elevations (8 copies 24" x 36" — folded). $HA ❑ Landscape Plan. See the submittal requirements for specific information to be presented on the landscape plan. (20 copies 24" x 36" — folded). NS ❑ Drainage and erosion control report (4 copies). NS ❑ Final utility and drainage plans (13 copies 24" x 36" — unfolded). ❑ Requirements for utility plans checklist (1 copy). ZONE'. ❑ An update of the Transportation Impact Analysis (TIA) (7 copies). DONE ❑ Soils report (2 copies). DONE ❑ Subsurface Hydrologic Study (4 copies). Revised February 8, 2006