HomeMy WebLinkAboutNEW BELGIUM BREWERY, 4TH FILING, PACKAGING HALL - FDP - 1-95G - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLIST.
SkA ❑ Certification that notice has been provided to the mineral estate owner (1 copy).
0 NS ❑ Executed deeds of dedication (contingent on final approval).
N/k NS ❑ Executed recorded agreements (12 copies).
1 ❑ Other information Director may require.
- Natural area or environmental study
- Wetland Deliniation
Revised February 8, 2006
s
Submittal Checksheet
Final Plan Review
The following information is required to be submitted, unless waived, with all
applications. Any item waived must be dated and initialed by a planner with the
amity of Fort Collins Current Planning Department.
15141% ❑ Application form and filing fee.
❑ Transportation Development Review Fee — please contact Engineering at 221-6605
for information.
-6NA o Name and address of each owner of property within the boundaries of the development
plan area.
BH0. ❑ List of names of all general and/or limited partners, managers and directors and/or officers
and directors of the corporation involved as either applicants or owners.
BKA ❑ Final site plan. See the submittal requirements for specific information to be presented on
the final site plan. (30 copies 24" x 36" — folded).
N1>1 ❑ Subdivision Plat (23 copies 24" x 36" — folded).
10AM
❑ Architectural elevations (8 copies 24" x 36" — folded).
$HA ❑ Landscape Plan. See the submittal requirements for specific information to be presented
on the landscape plan. (20 copies 24" x 36" — folded).
NS ❑ Drainage and erosion control report (4 copies).
NS ❑ Final utility and drainage plans (13 copies 24" x 36" — unfolded).
❑ Requirements for utility plans checklist (1 copy).
ZONE'. ❑ An update of the Transportation Impact Analysis (TIA) (7 copies).
DONE ❑ Soils report (2 copies).
DONE ❑ Subsurface Hydrologic Study (4 copies).
Revised February 8, 2006