Loading...
HomeMy WebLinkAboutEVERGREEN PARK, LOTS 18 & 19 - IL SITE PLAN REVIEW - 53-94 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSS� r Evergreen Park, I-L Site Plan Review December 28, 1994 Page 2 Preliminary calculations indicate that the proposed interior landscaping is 2% of the total area of the south parking lot and north loading area. The, five foot landscape adjacent to the north loading area curb is required by code. The review of this submittal does not include future uses on Lot 17. Future uses will be required to submit a separate I-L Site Plan submittal for Lot 17. However, the project as shown, will be assessed fees based on the total acreage of Lots 17, 18, and 19. Staff recommends the removal of the "skeleton" future office / manufacturing / warehouse and Lot 17 from this I-L Site Plan to avoid being assessed fees for undeveloped land. The 6% interior landscaping and 5' buffer requirements must either be met or: 1) a request for a variance would need to be approved by the Zoning Board of Appeals; or 2) the I-L Site Plan would need to be withdrawn and this project be re- submitted as a P.U.D. D,�, 5. Item #7 on the comment letter dated October 24, 1994 stated: A bike rack must be added to the site plan. Staff has been unable to locate the bike rack on'the revised Site Plan . Please clarify. This completes the review comments at this time. An administrative hearing will not be scheduled until all materials have been reviewed. Please contact me at 221-6206 if you have any questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. Sincerely, 10-� Michael Lu wig Project Planner xc: Kerrie Ashbeck Stormwater Utility file/Project Planner Comn ity Planning and Environmenta Planning Department City of Fort Collins December 28, 1994 Joe Frye Vaught -Frye Architects 1113 Stoney Hill Drive Fort Collins, CO 80525 Dear Joe, rvices Planning staff has reviewed your "revised" documents for. the Evergreen Park, Lots 17, 18, 19: I-L Site Plan Review that were received December 21, 1994, and would like to offer the following comments: 1. Utility and Drainage Plans are currently being reviewed. The Engineering Department will forward the comments to you after December 30, 1994. 1 (2. Item #3 on the comment letter dated October 24, 1994, stated: Hater and sewer utilities should be shown on the landscape plan also. No trees should be planted within 10' and no shrubs within 4' of any existing or proposed service lines, meter pits, or utility lines. Proposed service lines, meter pits, or utility lines on Lots 17, 18, 19 are not shown and must be added to the landscape plan. ,k 3. Item #5 on the comment letter dated October 24, 1994 stated: The utility easement width adjacent to the right-of-way should be such that from the back of walk to the rear line of the utility easement is 13' minimum. The utility easement scaled ilk' on the original submittal and remained ilk' on the revised plans. �.4. Item #6 on the comment letter dated October 24, 1994 stated: The parking lot landscaping does not most code requirements. The south parking lot and north loading area must contain interior landscaping which is equivalent to 6% of the total area of that parking/loading area. A five foot landscape buffer must be installed adjacent to the north loading area curb. 281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6750 FAX (303) 221-6378 TDD (303) 224-6002