Loading...
HomeMy WebLinkAboutGLENMOOR P.U.D., 2ND & 3RD FILING - PRELIMINARY / FINAL - 8-95C - CORRESPONDENCE - STAFF'S PROJECT COMMENTSLadies' Orchid and the Preble's Meadow Jumping Mouse [LUC 3.4.1(0)(2)], (3) the Natural Resources requirement for a letter from the Army Corps of Engineers stating that you have obtained the required permits [3.4.1(0)(1)], (4) the Natural Resources requirement that a Wetland Mitigation Plan must be submitted to and approved by the City of Fort Collins Natural Resources Department, and (5) You must change either the retaining wall configuration or the sanitary sewer location, but you cannot have the wall on top of the sewer; this situation must be corrected. c. All other outstanding issues (as specified in the attached comment sheets) must be resolved prior to final compliance approval. Be sure and return all your reclined plans when you resubmit. If you have any questions about these or any other issues related to this project please feel free to call be at 221-6750. VA urs truly, N Troy Y City Planner CC: Ed and Marsha Flemming (Owners) I Commu ✓ Planning and Environmental, Current Planning Citv of Fort Collins STAFF REVIEW COMMENTS Richard A. Rutherford Stewart & Associates P.O. Box 429 Fort Collins, CO 80522 vices August 16, 2000 Staff has reviewed your revisions for the Glenmoor P.D.P., and would like to offer the following comments. COMMENTS: 1. Stormwater Department, Water/Wastewater Department, Engineering, City Forester: a. See the attached comment sheets and accompanying redlined plans. 2. Natural Resources: a. Please see the attached comment sheet and letter from the Natural Resources Department. 3. Current Planning: a. Section 2.2.11 of the Land Use Code requires that an applicant submit revisions based on this letter within 90 days or the project application becomes null and void. Your response to the City's concerns is due by November 14, 2000. A 30 day extension to this deadline is available. All requests for an extension should be directed to the Current Planning Director. If remaining issues are those that do not require plan revisions, a status report verifying continuing efforts toward resolving the issues is required within the same timeline. b. The following issues must be resolved prior to the scheduling of a type 1 hearing: (1) the Stormwater comment #1 regarding the required 1-foot of freeboard for major channels, (2) the Natural Resources requirement for a letter from the U.S. Fish and Wildlife Service for the two endangered species, Ute _wI \or[h College Avenue • P.U. Box 580 • Fort Collins, CO 80522-0580 • (L)70) 4-o750 • FAX (970) -416-2020