There are a few points we would like to get clarification on, regarding New Belgium:
1. Regarding the sidewalk shown adjacent to the northern entrance into the site: Due to
grading needed to allow for adequate drainage into the retention area, and to the
requirement for berming to screen the parking areas, we would like to propose this i
sidewalk as attached rather than detached.4lf a detached walk is required by the City,
we would like to eliminate the berming in this area to allow adequate room for the
attached walk.
2. Bus Stop Location - After discussing various locations, we would like to propose the
bus stop be relocated between the two access drives as suggested by the City
transportation department. This location would allow a bus to stop against the curb
without blocking any access drives.
3. My understanding after speaking with you is that we still need to provide two
perspectives for review by the P & Z. One perspective would be facing west towards the
foothills ( During our conversation I think we deleted this need in one case and added in
back in at the end of our conversation). We also need to provide another sketch of the
n??). These sketches should ideally use a base of a
building tephoto. We also need lto have ea key map that illustrates the location from which the
photos were taken.