Loading...
HomeMy WebLinkAboutWATERFIELD PUD, FIRST FILING - FINAL - 7-95C - CORRESPONDENCE -In addition, I have tentatively outlined deadlines associated with the September 4 and 18 Planning and Zoning Board Hearings: September 4. 1997 P& Z Meeting 8/29/97 P & Z Worksession 8/26/97 P & Z Agenda due to paper 8/25/97 Deliver Packets to P & Z 8/21/97 APO letters mailed 8/20/97 P & Z Packet to printer 8/19/97 PMT's, Renderings, Revisions due 8/15/97 Staff Memos due to Planning Director 8/6/97 Development Review meeting (set 9/4/97 agenda). 7/15/97 Revision deadline for 8/6/97 Development Review meeting 7/2/97 Comments from City Staff 6/3/97 latest submittal date September 18 1997 P & Z Meeting 9/12/97 P & Z Worksession 1 9/9/97 P & Z Agenda due to paper 9/8/97 Deliver Packets to P & Z 9/4/97 APO letters mailed 9/3/97 P & Z Packet to printer 9/2/97 PMT's, Renderings, Revisions due 8/29/97 Staff Memos due to Planning Director 8/20197 Development Review meeting (set 9/18/97 agenda). 7/29/97 Revision deadline for 8/20/97 Development Review meeting 7/16/97 Comments from City Staff 6/17/97 latest submittal date Please distribute this letter to each of the applicant's consultants as necessary. Sincerely, Michael Ludwig City Planner • Plummer School buffering (fencing, landscaping)? need fence detail • Senior Cottages layout - pedestrian connections N-S and E-W, backing conflicts, curb ramps, landscaping, building materials/colors • Bull Run Apartments landscaping (trees in front of buildings), pedestrian connections, curb ramps • Commercial/Day Care finalize building materials/colors, landscaping, pedestrian connections, plaza's, colored renderings/computer generated photos • County Road 11 - resolve location with reference to Weiss property may need to shift road to the east or get easements. • Easements for off -site street improvements on Vine to the west for the developer to build the off -sites (box culvert in particular). • Shift County Road 11 to the east at the north end 100- 200. • Get ditch company permission to use the maintenance road south of the Larimer Weld Canal. • Irrigation pipe on the west side of Summitview is a plastic pipe that will not support a street on top of it. • Street names: arterial and collector street names should come from an approved list. • R.O.W. dedication or reservation? Discuss with Matt Baker. • Improvements to Vine Drive and Summitview as part of Bull Run application. City code requires off -site improvements prior to first building permit. • Ditch company agreement for drainage to be accepted by Lake Canal. Work with Don Magnuson, Superintendent of Cache la Poudre Irrigation. • Work with Water and sewer district(s) to satisfy their requirements. • accommodate for City waterline extension in design of Summitview (County Road 9E) f /° Comi._anity Planning and Environmental Services Current Planning City of Fort Collins May 21, 1997 Lucia Liley March and Myatt 110 E. Oak Street Fort Collins, CO 80524 Dear Lucia, Based upon our phone conversation this morning, I am aware of the time constraints associated with the development of the Bull Run Apartments as a part of the Waterfield PUD. After talking with Alan Krcmarik the City's Finance Director, it is my understanding that the Bull Run Apartment project property must be purchased by Brisben Companies and have Final PUD approval by the end of September 1997 in order to meet the State's requirements for bond allocation. Due to this time constraint, I feel that it is imperative that a great deal of project coordination occur on the part of the City and developer. The following is a preliminary list of issues to address / information to provide at the time of Final PUD application(s) for the Waterfield PUD. This list is based upon my notes from the May 19 Preliminary PUD hearing and preliminary conversations with the City's Engineering, Stormwater, Natural Resources, and Water and Wastewater development review staff. Additional issues may arise during the review of the Final PUD application(s). Discussion is needed to determine which items are specifically applicable to the Bull Run Apartment timeline and which are applicable to the remainder of the Waterfield PUD. Please review the following list and compare it with your notes for completeness. Issues to address/Information to provide: • Wetland wildlife corridor9 water source? basements? setbacks on west? setbacks of lots 59 -66? acquisition? best management practices referenced at Preliminary, pre-treatment prior to release into wetland? • Rail -road switching yard decibel readings? 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020