Loading...
HomeMy WebLinkAboutWATERFIELD PUD, FIRST FILING - FINAL - 7-95C - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTSWater Uti.-aes Stormwater City of Fort Collins April 17, 1998 Colorado Land Source 8101 East Prentice Avenue, Suite M180 Englewood, Colorado 80111 Re: Waterfield PUD Dear Sir: I am writing to inform you of a stormwater issue regarding the proposed Waterfield PUD. On April 13, 1998, it was discovered by City Stormwater staff that the "Hydrologic Model Update for the Lower Dry Creek Basin Master Drainage Plan" (Lidstone and Anderson, 1997) identifies an off -site basin to the east (108.0 acres) that drains through the proposed Waterfield PUD site under existing conditions. In addition, this study identifies a future outfall for this off -site basin to drain along the north side of Vine Drive to Dry Creek. It is a requirement for all developments to pass 100-year off -site historic drainage through the development. Waterfield PUD is required to pass this off -site flow from the east because it is an existing condition. On April 16, 1988, a meeting was held with Bud Curtis of Northern Engineering to discuss the matter. It was discussed with Bud that the first step in resolving the issue was to determine how much of this off -site basin drains through Waterfield PUD. The off -site basin is defined on a master plan level. However further study could be completed to define the off -site drainage patterns to greater detail. The additional study of off -site drainage patterns would need to be reviewed and approved by the City. This is a significant issue that may alter the design of the proposed site. We will be working with Bud to resolve this issue. Please call Basil Hamdan or myself at 221-6589, if you have any questions. Matthew Fater Civil Engineer Water Utilities-Stormwater Division cc: The Brisben Company Northern Engineering Services Tim Blanford Mike Ludwig 2-5 Mathews Street • rO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6589 • FAX (970) 221-6259