14. See attached Response Letter addressed to Mr. Ron Gonzales.
15. The crosswalk issue has been resolved and we have changed the plans
accordingly.
16-21. The subdivision plat and utility plans have been corrected as
requested.
22. Vertical curb will be used along the tighter portions of Muscovy, a
6' walk with a sidewalk easement will be shown on the plans. The
street will be 36' flowline to flowline.
23. A pedestrian access easement will be provided on the east side of Lot 48, as
part of the dedicated Tract F for a future connection.
24. An 12' pedestrian access easement has been added to the plans and a note
stating "Possible future trail connection to be designed by others."
25. This pedestrian crossing has been added to the plans.
26. The bicycle lanes have been added to the Signage and Striping
Plan sheets of the Utility Plans.
27. Acknowledged.
28-34. See attached Response Letter addressed to Mr. Basil Harridan of the City
of Fort Collins Engineering Department.
35. Corrected.
36. Corrected.
37. The label and drawing have been changed to a 4' high, Western 3-rail
fence with mesh.
If you have any questions regarding the revisions or these comments, please call.
Sincerely,
OALtk l mz,th,�
Cathy Mathis
VF RIPLEY ASSOCIATES, Inc.
6. a. See revised Civil Plans — a note has been added to the Overall
Utility Plan and the Water Plans.
b. The proposed storm sewer along East Vine Drive appears to be not
in conflict with the 3-phase electrical line.
7. a. Acknowledged.
b. The PSC easement has been added to all of the plans.
C. Acknowledged.
d. Acknowledged.
e. A utility coordination meeting would be encouraged by the
applicant's representative, Greg Seebohm, of Double Eagle
Construction.
8. a. The bicycle lanes have been added to the Signage and Striping
Plan sheets of the Utility Plans.
b. Rollover curb will be used along the tighter portions of Muscovy,
and an attached 6' walk with a sidewalk easement will be shown on
the plans. The street will be 36' flowline to flowline.
C. A trail has been shown conceptually, with a note
stating "Possible future trail connection to be designed by
others."
d. This pedestrian crossing has been added to the plans.
9. The spelling of the street has been corrected.
10. See revised Utility Plans.
11. See attached Response Letter addressed to Mr. Basil Harridan of the City
of Fort Collins Stormwater Utility.
12. a.
We will not be moving Conifer Street at this time. The street
is shown on the plans at a conceptual level only. A note has been
place on the site plan sheets stating "Possible Future Alignment of
Conifer Street to be Designed and Constructed By Others."
b.
See revised plans for the re -configured water quality pond.
C.
See detail sheet of the Utility Plan set.
d.
See detail sheet of the Utility Plan set.
e.
The pipe has been removed from the wetland.
f.
A mitigation plan is included with this resubmittal.
g.
This is a 20' wide utility easement.
h.
The label and drawing have been changed to a 4' high,
Western 3-rail fence with mesh.
i.
A note has been added to the site and landscape plans.
13. a. We have added the water main to all of the plans.
b. The water main is now shown and labeled on the plat.
1
March 15, 2000
Steve Olt
Planning Department
281 North College Avenue
Fort Collins, CO 80524
Re: Response to staff comments: Waterrield PUD 2"d Filing, Final
Dear Steve:
We have reviewed staff comments dated December 29, 1999 and have the
following responses:
The Historic Preservation Planners are most likely referring to the
Plummer School on the First Filing. The two outlots are not owned
by this applicant nor are they a part of this PUD.
2. The civil engineer states that Lot 48 is adjacent to Tract F, which will
be dedicated for utility, drainage, and pedestrian access. Therefore,
we feel a separate side lot easement is not necessary.
3. The requested pedestrian connection has been added to the plans.
4. a.
The topography lines have been removed from the site and
landscape plans.
b.
The elevations have been changed.
C.
The label has been changed to a 4' high, Western 3-rail fence
with mesh.
d.
Acknowledged.
e.
Pole -mounted parking lot lights are shown on the site and
landscape plans.
f.
The one street tree per lot will not be installed by the
developer, but will be the responsibility of the homebuilder or
the homeowner. There is no way to know at this time where
driveways are going to go and if we show street trees on the
PUD document, which is not a construction document, we risk
The potential of a landscape contractor taking the PUD
drawings literally and planting the trees in the wrong place.
We suggest a note in the landscape notes stating that each lot
will be provided with one street tree.
g.
Phasing lines have been added to the landscape plan sheets.
5. Acknowledged.
VF RIPLEY
ASSOCIATES INC.
Landscape Architecture
Urban Design
Planning
401 West Mountain Avenue
State 201
Fort Collins. CO 40521-2604