Loading...
HomeMy WebLinkAboutWATERFIELD P.U.D., 2ND FILING - FINAL - 7-95D - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSC. Redline comments have been addressed with this resubmittal. 14. See attached Response Letter addressed to Mr. Ron Gonzales. 15. The crosswalk issue has been resolved and we have changed the plans accordingly. 16-21. The subdivision plat and utility plans have been corrected as requested. 22. Vertical curb will be used along the tighter portions of Muscovy, a 6' walk with a sidewalk easement will be shown on the plans. The street will be 36' flowline to flowline. 23. A pedestrian access easement will be provided on the east side of Lot 48, as part of the dedicated Tract F for a future connection. 24. An 12' pedestrian access easement has been added to the plans and a note stating "Possible future trail connection to be designed by others." 25. This pedestrian crossing has been added to the plans. 26. The bicycle lanes have been added to the Signage and Striping Plan sheets of the Utility Plans. 27. Acknowledged. 28-34. See attached Response Letter addressed to Mr. Basil Harridan of the City of Fort Collins Engineering Department. 35. Corrected. 36. Corrected. 37. The label and drawing have been changed to a 4' high, Western 3-rail fence with mesh. If you have any questions regarding the revisions or these comments, please call. Sincerely, OALtk l mz,th,� Cathy Mathis VF RIPLEY ASSOCIATES, Inc. 6. a. See revised Civil Plans — a note has been added to the Overall Utility Plan and the Water Plans. b. The proposed storm sewer along East Vine Drive appears to be not in conflict with the 3-phase electrical line. 7. a. Acknowledged. b. The PSC easement has been added to all of the plans. C. Acknowledged. d. Acknowledged. e. A utility coordination meeting would be encouraged by the applicant's representative, Greg Seebohm, of Double Eagle Construction. 8. a. The bicycle lanes have been added to the Signage and Striping Plan sheets of the Utility Plans. b. Rollover curb will be used along the tighter portions of Muscovy, and an attached 6' walk with a sidewalk easement will be shown on the plans. The street will be 36' flowline to flowline. C. A trail has been shown conceptually, with a note stating "Possible future trail connection to be designed by others." d. This pedestrian crossing has been added to the plans. 9. The spelling of the street has been corrected. 10. See revised Utility Plans. 11. See attached Response Letter addressed to Mr. Basil Harridan of the City of Fort Collins Stormwater Utility. 12. a. We will not be moving Conifer Street at this time. The street is shown on the plans at a conceptual level only. A note has been place on the site plan sheets stating "Possible Future Alignment of Conifer Street to be Designed and Constructed By Others." b. See revised plans for the re -configured water quality pond. C. See detail sheet of the Utility Plan set. d. See detail sheet of the Utility Plan set. e. The pipe has been removed from the wetland. f. A mitigation plan is included with this resubmittal. g. This is a 20' wide utility easement. h. The label and drawing have been changed to a 4' high, Western 3-rail fence with mesh. i. A note has been added to the site and landscape plans. 13. a. We have added the water main to all of the plans. b. The water main is now shown and labeled on the plat. 1 March 15, 2000 Steve Olt Planning Department 281 North College Avenue Fort Collins, CO 80524 Re: Response to staff comments: Waterrield PUD 2"d Filing, Final Dear Steve: We have reviewed staff comments dated December 29, 1999 and have the following responses: The Historic Preservation Planners are most likely referring to the Plummer School on the First Filing. The two outlots are not owned by this applicant nor are they a part of this PUD. 2. The civil engineer states that Lot 48 is adjacent to Tract F, which will be dedicated for utility, drainage, and pedestrian access. Therefore, we feel a separate side lot easement is not necessary. 3. The requested pedestrian connection has been added to the plans. 4. a. The topography lines have been removed from the site and landscape plans. b. The elevations have been changed. C. The label has been changed to a 4' high, Western 3-rail fence with mesh. d. Acknowledged. e. Pole -mounted parking lot lights are shown on the site and landscape plans. f. The one street tree per lot will not be installed by the developer, but will be the responsibility of the homebuilder or the homeowner. There is no way to know at this time where driveways are going to go and if we show street trees on the PUD document, which is not a construction document, we risk The potential of a landscape contractor taking the PUD drawings literally and planting the trees in the wrong place. We suggest a note in the landscape notes stating that each lot will be provided with one street tree. g. Phasing lines have been added to the landscape plan sheets. 5. Acknowledged. VF RIPLEY ASSOCIATES INC. Landscape Architecture Urban Design Planning 401 West Mountain Avenue State 201 Fort Collins. CO 40521-2604 1'1111NE (970) 224-5828 1 \\ 'i7111224-1662