HomeMy WebLinkAboutWATERFIELD P.U.D., 2ND FILING - FINAL - 7-95D - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETRevisions Routing Sheet
Item:
Date: oy
a6 ; o zli /m
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
MAPPING / DRAFTING
FORESTRY
FCLWD/ELCO/BOXELDER
FIRE
POLICE
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE / THOMPSON
CABLE TV
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
REA/DOE /PRPA
o;
TOTAL
Rev. 5-07.97
Project: Wwa� Zoou�►c, Date: Ia j22/97
Planner: Pi I -o6tkx , Traffic Operations: Far- Beear r —
Engineer: swc R �ANr-> e->op
Items Requested
Site land I Plat Utility I Drainage Rpt Other Items Required
Engineering 2 z
Redlined Items Being Returned
Site I land Plat I Utility I Drainage R t Other Items Being Returned
Stormwater
Traffic Operations
Trans. Planning
Tran*rt
Natural Resources
-a uP= ZEFt-,7T
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.