Loading...
HomeMy WebLinkAboutWATERFIELD P.U.D., 2ND FILING - FINAL - 7-95D - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETRevisions Routing Sheet Item: Date: oy a6 ; o zli /m FILE: PROJECT PLANNER ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION LIGHT & POWER MAPPING / DRAFTING FORESTRY FCLWD/ELCO/BOXELDER FIRE POLICE ADVANCE PLANNING STREETS R.O.W. PLANNING WATER CONSERVATION POST OFFICE US WEST PUBLIC SERVICE SCHOOLS: POUDRE / THOMPSON CABLE TV STATE HIGHWAY DEPARTMENT DITCH COMPANY RAILROAD: UP or BN/CS REA/DOE /PRPA o; TOTAL Rev. 5-07.97 Project: Wwa� Zoou�►c, Date: Ia j22/97 Planner: Pi I -o6tkx , Traffic Operations: Far- Beear r — Engineer: swc R �ANr-> e->op Items Requested Site land I Plat Utility I Drainage Rpt Other Items Required Engineering 2 z Redlined Items Being Returned Site I land Plat I Utility I Drainage R t Other Items Being Returned Stormwater Traffic Operations Trans. Planning Tran*rt Natural Resources -a uP= ZEFt-,7T Park Planning Totals Other: Note: All redlined items should be returned with the resubmittal/ revisions.