Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY, 2ND FILING - PDP / FDP - 1-95B - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSJ I.J. 3 line as required We have revised the layout of the handicap parking spaces as requested The visitor lot will remain as it exists today, with one handicap space provided. We have grouped the two required spaces for the employee parking into the parking area nearest the building to provide the most convenient access to the building entrance. All comments regarding the plat have been addressed JR Engineering is awaiting final comments from the Engineering and Stormwater Departments. JR will submit the plat along with revised utility drawings at a separate time. This concludes our clarifications of the comments and the plan revisions. Please feel free to call if you have any questions or need additional information. Sincerely, b ign inc. ruce A. H design design October 3, 1997 LANDSCAPE ARCHITECTURE URBAN DESIGN Ted Shepard PLANNING City of Fort Collins Current Planning 281 North College Avenue Fort Collins, CO 80521 RE: New Belgium Brewery Revised Plans The attached plans have been modified to reflect the changes that you mentioned in BHA DESIGN, INC. your letter of September 19. All comments are completed in full with the 2000 V E R M O N T exception of the clarifications outlined below. The responses are numbered FT COLLINS, CO 80525 according to your letter. TEL 303 223-7527 FAX 303 226-3855 Comment Response 1.C. The Employee Entrance has been indicated In addition, we have noted on the site plan all visitor and employee entrances, receiving doors, and loading docks for all phases. LD. The area north of the Proposed Warehouse Phase One is a paved apron to serve the loading docks in this area. Each loading dock indicated will be provided with one truck bay each. The apron configuration in this area has been reconfigured at the request of the building owners to allow for adequate turning movements for the trucks backing into these docks. Additional evergreen trees have been provided along the east edge of this apron area to help screen the loading area. Trailer storage is intended to occur in the area north of the Phase Three Proposed Warehouse during Phase One only. Pallet/recycle storage for Phase One will be moved to the northeast corner of the existing Brewery Building and will be screened with a 6' ht. solid fence. I believe the line on the plans to which you have referred is the drainage easement line that was recently vacated. We have removed this line from the site and landscape plans to avoid further confusion. I.H. We have indicated the tank farm `envelope' with a dashed line to differentiate it from the actual building envelopes. We still show its dimensions so we can indicate its distance from the nearest property