HomeMy WebLinkAboutNEW BELGIUM BREWERY, 2ND FILING - PDP / FDP - 1-95B - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTN WhltcLAve
-- h
S Sher ood St
D 3
mc mS
Mel run StPnD
m S Ho es St
S Mns n StCOLLE
E
......... �.._:............�........__....._._.
�(i A,
"'-._..........._.....;�i.........----
;
_-------- t._...._....... .
a ,r P SaC
r a
I \.i
:x
r c
i4
i
\\ � First St
'
d
_��' Second 0 St
Th rd m St
m
r
m co 00
n
a
n
�
'
m O
D
<3
m T
p
C.
Martine St
m
0
p
r\
Altn Vest St
LEMAY
AVE,
....................... j................
................................. .......................
O p
�....
_
3
0
u. o
h �
r.
o'
a
a`
a�
H
ff
a
VICINITY MAP
NOT TO SCALE
1
1
1�
1
1
1
1
1
1
1
1
1
1
1
1
1
1
'1
OVERDETENTION CALCULATIONS (FAA METHOD)
Project Name:
NEW BELGIUM BREWERY
Project No.:
9067.02
By:
JCY
Checked By:
Date:
6/24/97
BASIN "A"
- CHECK EXISTING DETENTION
Basin Area =
1.18 ac
Total Area =
1.18 ac
Composite "C" Value =
0.98
Allowable release =
2 cfs
Net Allowable Release =
2 cfS
TIME (min) I (in/hr) DEVELOPED NET ALLOWABLE RELEASED DELTA DELTA
VOLUME (cf) RELEASE (cfs) VOLUME (co VOLUME (cf) VOLUME (ac-ft)
5
8.9
3088
2
600
2488
0.057
t0
6.5
4510
2
1200
3310
0.076
15
5.3
5464
2
1800
3664
0.084
20
4.4
6147
2
2400
3747
0.086
25
3.9
6765
2
3000
3765
0.086
30
3.5
7285
2
3600
3685
0.085
35
3.2
7771
2
4200
3571
0.082
40
2.9
8049
2
4800
3249
0.075
45
2.7
8430
2
5400
3030
0.070
50
2.6
8846
2
6000
2846
0.065
55
2.4
8968
2
6600
2368
0.054
60
2.3
9367
2
7200
2167
0.050
65
2.2
9696
2
7800
1896
0.044
70
2.1
9957
2
8400
1557
0.036
75
2.0
10147
2
9000
1147
0.026
80
1.9
10269
2
9600
669
0.015
85
1.8
10616
2
10200
416
0.010
90
1.7
10616
2
10800
-184
-0.004
95
1.7
10876
2
11400
-524
-0.012
100
1.6
11101
2
12000
-899
-0.021
105
1.5
11147
2
12600
-1453
-0.033
110
1.5
11448
2
13200
-1752
-0.040
115
1.5
11570
2
13800
-2230
-0.051
120
1.4
11657
2
14400
-2743
0.063
Required Volume
I.
APPENDIX B
HYDROLOGIC CALCULATIONS
1
1
1_1
1
1
JR Engineering, Ltd. (970) 491-9888
2620 East Prospect Road, Suite 190, Fort Collins, Colorado 80525 07/08/97
NEW BELGIAN BREWERY FIRST FILING
EROSION CONTROL COST ESTIMATE
JOB NO. 9067.02 COMPLETED BY: DWK
ITEM
DESCRIPTION
UNITS
I UNIT COST
I QUANTITY
TOTAL COST
1
I SILT FENCE
LF
1 $3.00
1 285
1 $855.00
2
1 STRAW BALE BARRIER
LF
1 $150.00
1 5
1 $750.00
PRELIMINARY COST $1,605.00
TOTAL COST WITH FACTOR OF 150% $2,407.50
CITY RF.CF.F.r)mr. r09T
ITEM
DESCRIPTION
UNITS
I UNIT COST
IQUANTITY
ITOTALCOST
1
I RESEED/MULCH
ACRE
$650.00
7.2
$4,660.50
PRELIMINARY COST
FACTOR OF 150%
ESCROW AMOUNT = $6,990.75
X:\906702\EROSCOST.WB2 PAGE 1 of 1
CONSTRUCTION SEQUENCE
STANDARD FORM C
PROJECT: NEW BELGIAN BREWERY FERMENTATION TANKS
SEQUENCE FOR 1997 ONLY COMPLETED BY: DWK DATE: 06/22/97
Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an
approved schedule may require submitting a new schedule for approval by the City Engineer.
1997
MONTH JULY AUGUST SEPTEMBER I OCTOBER NOVEMBER DECEMBER
Demolition
Grading
Wind Erosion Control:
Soil Roughing
Perimeter Barrier
Additional Barriers
Vegetative Methods
Soil Sealant
Other
Rainfall Erosion Control
Structural:
Sediment Trap/Basin
Inlet Filters
Straw Barriers
Silt Fence Barriers
Sand Bags
Bare Soil Preparation
Contour Furrows
Terracing
Asphalt/Concrete Paving
Other
Vegetative:
Permanent Seed Planting
Mulching/Sealant
Temporary Seed Planting
Sod Installation
Nettings/Mats/Blankets
Other
BUILDING CONSTRUCTIO
STRUCTURES: INSTALLED BY: CONTRACTOR MAINTAINED BY: DEVELOPER
VEGETATION/MULCHING CONTRACTOR: TO BE DETERMINED BY BID
DATE SUBMITTED: 06/97 APPROVED BY CITY OF FORT COLLINS ON:
JR Engineering, Ltd.
2620 E. Prospect Rd., Ste. 190, Fort Collins, Colorado 80525
EFFECTIVENESS CALCULATIONS
(970)491-9888
PROJECT:
NEW BELGIAN BREWERY FIRST FILING
STANDARD FORM B
COMPLETED BY:
DWK
DATE:
07/08/97
EROSION CONTROL
C-FACTOR
P-FACTOR
METHOD
VALUE
VALUE
COMMENT
BARE SOIL
1.00
1.00
SMOOTH CONDITION
ROUGHENED GROUND
1.00
0.90
ROADS/WALKS
0.01
1.00
GRAVEL FILTERS
1.00
0.80
SILT FENCE
1.00
0.50
STRAW MULCH
0.06
1.00
ESTABLISHED GRASS
0.08
1.00
BUILDING/DRIVE
0.01
1.00
MAJOR
PS
EROSION CONTROL
SUB
AREA
BASIN
(0/0)
DEVICES
BASIN
(Ac)
CALCULATIONS
AC
SILT FENCE
E
5.25
SILT FENCE
100%
BUILDING/DRIVE
2.58
ROADS/WALKS
0.00
STRAW/MULCH
2.67
WEIGHTED C-FACTOR
0.04
WEIGHTED P-FACTOR
0.80
EFF
97.17
OVERALL EFFECTIVENESS = 97.45
> 78.8, O.K.
XA906702\NBB EFF1.WB2 PAGE 2 OF 2
JR Engineering, Ltd.
2620 E. Prospect Rd., Ste. 190, Fort Collins, Colorado 80525
EFFECTIVENESS CALCULATICINR
(970)491-9888
PROJECT: NEW BELGIAN BREWERY FIRST FILING STANDARD FORM B
COMPLETED BY: DWK DATE: 07/08/97
EROSION CONTROL C-FACTOR P-FACTOR
METHOD VALUE VALUE COMMENT
BARE SOIL 1.00 1.00 SMOOTH CONDITION
ROUGHENED GROUND 1.00 0.90
ROADS/WALKS 0.01 1.00
GRAVEL FILTERS 1.00 0.80
SILT FENCE 1.00 0.50
STRAW MULCH 0.06 1.00
ESTABLISHED GRASS 0.08 1.00
BUILDING/DRIVE 0.01 1.00
MAJOR
PS
EROSION CONTROL
SUB
AREA
BASIN
(%)
DEVICES
BASIN
(Ac)
CALCULATIONS AC
78.8
SILT FENCE
A
1.18
SILT FENCE 100%
BUILDING/DRIVE 0.89
ROADS/WALKS 0.00
STRAW/MULCH 0.29
WEIGHTED C-FACTOR 0.02
WEIGHTED P-FACTOR 0.50
EFF 98.89
B
1.03
SILT FENCE 0.00
BUILDING/DRIVE 0.45
ROADSIWALKS 0.00
STRAW/MULCH 0.58
WEIGHTED C-FACTOR 0.04
WEIGHTED P-FACTOR 0.80
EFF 96.95
SILT FENCE
C
0.44
SILT FENCE 100%
BUILDING/DRIVE 0.00
ROADS/WALKS 0.44
STRAW/MULCH 0.00
WEIGHTED C-FACTOR 0.01
WEIGHTED P-FACTOR 0.80
EFF 99.20
STRAW BALE BARRIER
D
0.51
SILT FENCE 0.00
BUILDING/DRIVE 0.18
ROADS/WALKS 0.00
STRAW/MULCH 0.33
WEIGHTED C-FACTOR 0.04
WEIGHTED P-FACTOR 0.80
EFF 96.61
XA906702\NBB EFFI.WB2 PAGE 1 OF 2
JR ENGINEERING, LTD.
RAINFALL PERFORMANCE STANDARD EVALUATION STANDARD FORM A
PROJECT: NEW BELGIAN BREWERY FIRST FILING
COMPLETED BY: DWK DATE: 06/27/97
DEVELOPED
ERODIBILITY
Asb
Lsb
Ssb
Lb
Sb
PS
SUBBASIN
ZONE
(AC)
(FT)
(%)
(FT)
(%)
(%)
A
1.18
340
3.0
B
1.03
120
1.0
C
0.44
635
0.4
D
0.51
275
1.6
E
5.25
690
1.0
8.41
1
1
1 43.0
1 1.3
1 78.8
PS is taken from Table 8-a (Table 5.1, Erosion Control Reference Manual) by interpolation.
Required PS = 78.8
1'
1
APPENDIX D
' EROSION CONTROL EFFECTIVENESS CALCULATIONS,
' SCHEDULE, AND COST ESTIMATE
H
11
H
1
' Project No.:
Project Name:
9067.02
New Belgium Brewery First Filing
Detention Pond Volume
By: DWK
Date: 6/30/97
Contour
Surface
Incremental
Cumulative
Elevation
Area
Volume
Volume
(ft.)
(sq. ft.)
(cu. ft.)
(cu. ft.)
46.00
0
0
0
47.00
7663
3832.00
3832
48.00
16381
12022.00
15854.00
49.00
24611
20496.00
36350.00
' Required Volume =
Total Volume =
' Retention Pond Volume
1
0.71 ac-ft
0.71 ac-ft @ 4948.73
Contour
Surface
Incremental
Cumulative
Elevation
Area
Volume
Volume
(ft.)
(sq. ft.)
(cu. ft.)
(cu. ft.)
51.00
0
0
0
52.00
1285
643
643
53.00
2790
1395.00
2038.00
54.00
9078
4434.00
6472.00
.Required Volume =
' Total Volume =
0.15 ac-ft
0.15 ac-ft @ 4954.00
OVERDETENTION CALCULATIONS (FAA METHOD)
Project Name:
NEW BELGIUM BREWERY
Project No.:
9067.02
By:
JCY
Checked By:
Date:
6/24/97
BASIN "E" DETENTION REQUIREMENTS
Basin Area =
5.25 ac
Total Area'=
5.25 ac
Composite "C" Value =
0.74
Allowable release =
1.15 cfs
Net Allowable Release =
1J5 CIS
TIME (min) I (in/hr) DEVELOPED NET ALLOWABLE RELEASED DELTA DELTA
VOLUME (cf) RELEASE (cfs) VOLUME (cf) VOLUME (cf) VOLUME (ac-ft)
5
8.9
10373
1.15
345
10028
0.230
10
6.5
15152
1.15
690
14462
0.332
15
5.3
18357
1.15
1035
17322
0.399
20
4.4
20653
1.15
1380
19273
0.442
25
3.9
22727
1.15
1725
21002
0.482
30
3.5
24476
1.15
2070
22406
0.514
35
3.2
26107
1.15
2415
23692
0.544
40
2.9
27040
1.15
2760
24280
0.557
45
2.7
28322
1.15
3105
25217
0.579
50
2.6
29720
1.15
3450
26270
0.603
55
2.4
30128
1.15
3795
26333
0.605
60
2.3
31469
1.15
4140
27329
0.627
65
2.2
32576
1.15
4485
28091
0.645
70
2.1
33450
1.15
4830
28620
0.657
75
2.0
34091
1.15
5175
28916
0.664
80
1.9
34499
1.15
5520
28979
0.665
85
1.8
35664
1.15
5865
29799
0.684
90
1.7
35664
1.15
6210
29454
0.676
95
1.7
36538
1.15
6555
29983
0.688
100
1.6
37296
1.15
6900
30396
0.698
105
1.5
37448
1.15
7245
30203
0.693
110
1.5
39462
1.15
7590
30872
0.709
115
1.5
38869
1.15
7935
30934
0.710
120
1.4
39161
1.15
8280
30881
0.709
Required Volume
OVERDETENTION CALCULATIONS (FAA METHOD)
Project Name:
NEW BELGIUM BREWERY
Project No.:
9067.02
By:
JCY
Checked By:
Date:
6/24/97
BASIN "D" RETENTION REQUIREMENTS
Basin Area =
0.51 ac
Total Area =
0.51 ac
Composite "C" Value =
0.63
Allowable release =
0.0 cfs
Net Allowable Release =
9A
TIME (min) I (in/hr) DEVELOPED NET ALLOWABLE RELEASED DELTA DELTA
VOLUME (cf) RELEASE (cfs) VOLUME (cf) VOLUME (cf) VOLUME (ac-ft)
5
8.9
858
0
0
858
0.020
10
6.5
1253
0
0
1253
0.029
15
5.3
1518
0
0
1518
0.035
20
4.4
1708
0
0
1708
0.039
25
3.9
1880
0
0
1880
0.043
30
3.5
2024
0
0
2024
0.046
35
3.2
2159
0
0
2159
0.050
40
2.9
2236
0
0
2236
0.051
45
2.7
2342
0
0
2342
0.054
50
2.6
2458
0
0
2458
0.056
55
2.4
2492
0
0
2492
0.057
60
2.3
2603
0
0
2603
0.060
65
2.2
2694
0
0
2694
0.062
70
2.1
2766
0
0
2766
0.064
75
2.0
2819
0
0
2819
0.065
80
1.9
2853
0
0
2853
0.065
85
1.8
2950
0
0
2950
0.068
90
1.7
2950
0
0
2950
0.068
95
1.7
3022
0
0
3022
0.069
100
1.6
3084
0
0
3084
0.071
105
1.5
3097
0
0
3097
0.071
110
1.5
3181
0
0
3181
0.073
115
1.5
3215
0
0
3215
0.074
120
1.4
3239
0
0
3239
0.074
Required Volume = 2 X 0.07 = 0.14 ac-ft
I.
1
APPENDIX C
' DETENTION/RETENTION POND CALCULATIONS
11
11
1
7
JR EnginesrbV
0
SUBDIVISION:
New Belgium Brewery
CALCULATED BY: PPK
STORM DRAINAGE SYSTEM DESIGN DATA
STORM 100 yr(developed) d= 1.25
DATE OWSN7
D.P.
BASINS
to
ROUTING FLOWTIME
tL
td
C
INTENSIT
AREA
DIRECT
RUNOF
OTHER
RUNOFF
TOTAL
RUNOFF
STREET/CHANNEL
PIPE
STREET/CHNL
IPIPE
REMARKS
LENGTH
CHANNEL
PIPE
SLOPE
ICAPACITY
SLOPE
SIZE
CAPACIT
DESIG
VELOCIT
DESIG
VELOCITY
LOC.
(min)
(fl)
(min)
(min)
(min)
(inmr)
(ac)
Ids)
Ids)
(cis)
(%)
ids)
(%)
(in)
(cis)
Ids)
(ttls)
(cis)
(a/s)
1
2
3
4
4a
5
6
7
8
9
10
11
12
13
1 14 14e
15
16
17
18
19
20
21
22
23
A
A
5.5
5.5
0.78
8.80
1.18
10.10
10.1
.
B
B
10.0
10.0
0.56
7.20
1.03
5.15
5.2
From Water, Waste 8 Land
Report
C
C
5.0
5.0
0.95
9.00
0.44
3.96
4.0
From Water, Waste 8 Land
Report
D
D
6.4
8.4
0.50
8.50
0.51
2.69
2.7
1.80 L
74.8
E
E
10.9
10.9
0.59
6.98
5.25
27.19
27.2
1.80 L
74.8
Notes: 1. Column 4a identifies the type of diannel used to calculate the velocity for the travel time calculations
2. Column 14a identifies whether the street is a main arterial, collector, or local street for use in the street capacity calculations.
Strom Drainage Design and TKhn" Creeds
JR Engineering
0
SUBDIVISION:
New Belgium Brewery
CALCULATED BY: PPK
TIME OF CONCENTRATION
STORM 100 yr
DATE 06/25/97
cf = 1.25
ti = 1 87(1.1 - C x QDD^0.5
S^(1/3)
tc = ti + tL
SUB -BASIN DATA
INITIAL/OVERLAND TIME
TRAVEL TIME
FINAL
tc
REMARKS
DESIG:
AREA
C
LENGTH
SLOPE
ti
LENGTH
SLOPE
VELOCITY
tL
(ac)
(ft)
N
(min)
(ft)
N
(ft/s)
(min)
(min)
1
2
3
4
5
6
7
7a
8
9
10
11
12
A
1.18
0.78
100
0.50
3.0
240
PA
0.70
1.59
2.5
5.5
B
1.03
0.56
10.0
C
0.44
0.95
5.0
D
0.51
0.50
25
2.00
3.6
250
PA
0.60
1.47
2.8
6.4
E
5.25
0.59
25
2.00
2.7
665
PA
0.50
1.34
8.3
10.9
Note: Column 7a codes the channel type for velocity calculations.
Storm Drainage Design and Technical Criteria
JR Engineering
0
SUBDIVISION
New Belgium Brewery
CALCULATED BY PPK
STORM DRAINAGE SYSTEM DESIGN DATA
STORM 10 yr(developed) d= 1.00
DATE 00,25197
D.P.
BASINS
toll
ROUTING
FLOW
TIME
tL
tc'
C
INTENSIT
AREA
DIRECT
RUNOF
OTHER
RUNOFF
T TAIL
RUNOFF
TREET/
HANNEL
PIPE
STREET
PIPE
REMARKS
LE NGT
CHANNEL
PIPE
SLOPE
CAPACITY
SLOPE
SIZE
CAPACITY
DESIG
VELOCITY
DESIG
VELOCITY
LOC.
(min)
(R)
(min)
(min)
(min)
(INhr)
(go)
(de)
(do)
(do)
(%)
(do)
(%)
(In)
(ds)
(de)
(R/s)
(ds)
(fVe)
1
2
3
4
4a
5
6
7
6
9
10
11
12
13
14 14a
15
16
17
18
19
20
21
22
23
A
A
10.1
10.1
0.78
2.51
1.18
2.3
2.3
B
B
C
C
D
D
T3
7.3
0.50
2.81
0.51
0.7
0.7
0.60 L
5.4
E
E
12.1
12.1
0.59
2.31
6.25
7.2
7.2
1.00 L
6.9
Notes: 1. Column 4a identifies the type of channel used to calculate the velocity for the travel time calculations
2. Column 14a identifies whether the street is a main arterial, collector, or local street for use in the street capacity calculations.
Storm Drainage Design and Technical Gnarl
JR Engineering
0
SUBDIVISION:
New Belgium Brewery
CALCULATED BY: PPK
TIME OF CONCENTRATION
STORM 10 yr
DATE 06/25/97
cf = 1.00
ti = 1.870.1 - C x Cf)D^0.5
S^(1/3)
tc = ti + tL
SUB -BASIN DATA
INITIAUOVERLAND TIME
TRAVEL TIME
FINAL
tc
REMARKS
DESIG:
AREA
C
LENGTH
SLOPE
ti
LENGTH
SLOPE
VELOCITY
tL
(ac)
(ft)
N
(min)
(ft)
N
(ft/s)
(min)
(min)
1
2
3
4
5
6
7
7a
8
9
10
11
12
A
1.18
0.78
100
0.50
7.6
240
PA
0.70
1.59
2.5
10.1
B
1.03
0.56
C
0.44
0.95
D
0.51
0.50
25
2.00
4.5
250
PA
0.60
1.47
2.8
7.3
E
5.25
0.59
25
2.00
3.8
665
PA
0.50
1.34
8.3
12.1
Note: Column 7a codes the channel type for velocity calculations.
PA = Paved Area, PL = Pasture& Lawns, GW = Grassed Waterway,
Storm Drainage Design and Technical Criteria
JR Engineering
Weighted Runoff Coefficients
Project No: 9067.02 PPK
New Belgium Brewery 06/25/97
This sheet calculates the composite "C" values for the Rational Method.
Design
Area
Impervious
"C"
Pervious
"C"
,tota
(ac.)
,imp
(ac.)
Percent
Imperv.
Percent
Pervious
Comp.
"C"
A
0.95
0.25
1.18
0.89
75.4
24.6
0.78
B
0.95
0.25
1.03
0.45
43.7
56.3
0.56
C
0.95
0.25
0.44
0.44
100.0
0.0
0.95
D
0.95
0.25
0.51
0.18
35.3
64.7
0.50
E
0.95
0.25
5.25
2.58
49.1
50.9
0.59
SITE
8.41
4.54
54.0
46.0
0.63
EE
Storm Drainage Design and Technical Criteria
I.
1
APPENDIX A
' MAPS AND FIGURES
1
t
1
1
t
H
1
F
'
6.2 Irrigation
Ditches
'
The Coy Ditch runs along the southerly portion of this site. The proposed improvements, with
the the
exception of storm sewer crossing for the outlet pipe from the proposed detention pond,
do not impact said ditch.
6.3 Ditch Company Approval
'
Ditch Company Approval is required for the pipe crossing previously discussed and a
signature block has been added to the storm pipe profile sheet.
6.4 Maintenance Agreements
'
The developer will be responsible for the maintenance of all temporary and permanent
drainage structures.
7. REFERENCES
1
1. City of Fort Collins, "Storm Drainage Design Criteria and Construction Standards",
' (SDDCCS), dated May 1984, revised January 1997.
' 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual',
Volumes 1 and 2, dated March, 1969, and Volume 3 dated September, 1992.
' 3. "Drainage and Erosion Control Report for New Belgium Brewery, Fort Collins,
Colorado', Water, Waste & Land, Inc., March 30, 1995 (WW&L Report)
4. "Final Drainage, Erosion and Storm Water Quality Study East Vine Streets Facility
tP.U.D., Phase One Final, City of Fort Collins", RBD. Inc. Engineering Consultants,
Updated June 28, 1993.
1 8
' placed as shown on the utility plan prior to earthwork operations. (See Appendix for erosion
control plan and details.) The measures are designed to limit the overall sediment yield
increase due to construction as required by the City of Fort Collins. A construction schedule
is contained in the Appendix which shows the proposed construction starting in August 1997.
' 5.1 Dust Abatement
During the performance of the work required by these specifications or any operations
appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the
' Contractor shall furnish all labor, equipment, materials, and means required. The Contractor
shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance,
and to prevent dust nuisance, and to prevent dust which has originated from his operations
' from damaging crops, orchards, cultivated fields, and dwellings, or causing a nuisance to
persons. The Contractor shall be liable for any damage resulting from dust originating from
' his operations under these specifications.
' 5.2 Maintenance
All temporary and permanent erosion and sediment control practices must be maintained and
' repaired as needed to assure continued performance of their intended function. Maintenance
is the responsibility of the Owner.
' 5.3 Permanent Stabilization
For disturbed areas and soil stockpiles shall be seeded and mulched within 30 days of
' disturbance. Vegetation shall not be considered established until a ground cover is achieved
which is demonstrated to be mature enough to control soil erosion to the satisfaction of the
' City Inspector and to survive severe weather conditions.
6. MISCELLANEOUS
' 6.1 Variances
There are no variances requested with the development of the New Belgium Brewery First
Filing.
1 7
3.7 Allowable Street Flow Capacities
' The New Belgium Brewery First Filing does not impact any street flows on the adjacent
streets. Therefore, detailed calculations are not required or provided in this report.
' 3.8 Curb Inlet Design
There are no curb inlets required or proposed with the development of the New Belgium
' Brewery First Filing.
' 3.9 Storm Sewer Design
There is one storm sewer proposed with the development of this site consisting of the outfall
' pipe from the proposed detention pond in the southeast corner of the site. This pipe will be
a 12" RCP as preliminarily approved by City Storm Drainage. (See Appendix for
Calculations.)
4. DETENTION/RETENTION
There are two facilities proposed with the New Belgium Brewery First Filing, a detention
pond and a retention pond. The detention pond (pond E) will be located in the southeast
portion of the site. This pond will outfall through a proposed 12" RCP into the existing
underground storm sewer pipe in First Street.
The retention pond (pond D) proposed for the westerly portion of the site has a total
contributing area of 0.51 acres (Subbasin D). In the design for the original brewery, this area
drained around the north side of the building to Pond A. However, due to the location of the
' proposed expansion, the grades do not allow adequate fall for this area to continue to outfall
around the north side of the building. In order to minimize the size of this pond, all of the off -
site runoff from Linden Street north of the proposed entrance in the northwest corner of the
site are being diverted onto the site at that point and are routed to the proposed detention pond
' (pond E) in the southeast corner of the site.
5. EROSION CONTROL
' Erosion and sedimentation will be controlled on -site by the use of silt fence which will be
installed prior to commencing any earthwork operations. Straw bale barriers will also be
1 6
' adjustment factor, C is the runoff coefficient, and I is the rainfall intensity in inches per hour.
The frequency adjustment factor, Cf, is 1.0 for the initial 10-year storm and 1.25 for the major
' 100-year storm.
' The appropriate rainfall intensity information was developed based on rainfall intensity
duration curves in the SDDCCS Manual.
' In order to utilize the rainfall intensity curves, the time of concentration is required. The
' following equation was used to determine the time of concentration:
' t'=t;+t, (2)
where tc is the time of concentration in minutes; t is the initial or overland flow time in
' minutes, and t, is the travel time in the ditch, channel, or gutter in minutes. The initial or
overland flow time is calculated with the SDDCCS Manual equation:
t; = [1.87(1.1 - CCf)LosJ/(S)oaa (3)
' where L is the length of overland flow in feet (limited to a maximum of 500 feet), S is the
' average slope of the basin in percent, and C and Cf are as defined previously.
All hydrologic calculations associated with the sub -basins shown on Figure 3.1 are attached
' in the Appendix of this report. Table 3.1 provides a summary of the design flows for all
Subbasins and Design Points (DP's) associated with this site.
* All information for these basins taken from W W&L Report.
G7
LJ
I.
1 3.5 Proposed Drainage Plan
' A qualitative summarization of the drainage patterns within each subbasin and at each design
point is provided in the following discussion paragraphs.
' Runoff from Subbasin A is conveyed to the existing detention area proposed and
constructed as part of the original New Belgium Brewery. (Pond A in the WW&L
Report.) The overall size of this pond has been reduced as a result of the proposed
expansion. The outlet for this pond is into the existing underground storm sewer
system that was designed and constructed as part of the original brewery and is
' adequate to accommodate the revised runoff.
Subbasin B runoff is conveyed to the existing detention area proposed and constructed
' as part of the original New Belgium Brewery. (Pond B in the WW&L Report.) This
basin and pond are not being modified with this expansion and no analysis has been
completed for this basin.
' Runoff from Subbasin C is conveyed to the existing inlet on Buckingham Street that
' was proposed and constructed as part of the original New Belgium Brewery. This
basin is not being modified with this expansion and no analysis has been completed
for this basin.
' Runoff from Subbasin D is conveyed to a proposed retention pond (Pond D) located
in the westerly portion of the site adjacent to Linden Street.
Runoff from Subbasin E is conveyed to a proposed detention pond (Pond E) in the
southeast corner of this site. The outlet for this pond will be through a proposed pipe
' into the existing underground storm sewer in First Street.
' 3.6 Hydrologic Analysis of the Proposed Drainage Conditions
The Rational Method was used to determine both 10-year and 100-year peak runoff values for
each Subbasin. Runoff coefficients were assigned utilizing Table 3-2 of the SDDCCS
' Manual.
' As stated above, the Rational Method was used for all hydrologic analyses for the project site.
The Rational Method utilizes the SDDCCS equation:
' Q = CrCIA (1)
' where Q is the flow in cfs, A is the total area of the basin in acres, Cr is the storm frequency
1 4
1 3. DEVELOPED FLOWS
' 3.1 Method
The Rational Method was used to determine both the 10-year and 100-year flows for the sub -
basins indicated in this drainage report. A detailed description of the hydrologic analysis is
provided in Section 3.6 of this report.
'
Detention is required for this site and was provided in two detention ponds (Ponds A and B)
'
for the original New Belgium Brewery. In order to accommodate the increased flows resulting ..
from the proposed expansion of the brewery, additional storage will be provided in the form
'
of a small retention area (Pond D) in the westerly part of the site and a new detention pond
(Pond E) in the southeast portion of the site.
' The release rates for this site were calculated in the aforementioned WW&L Report and those
values have been utilized for this study. Therefore, the hydrologic analysis was conducted for
' developed flows only. The resulting 10-year and 100-year runoff values were used to compute
discharges at specific design points.
' 3.2 Offsite Flows
' Offsite flows enter this site from the north and west. These areas are identified on the attached
"Final Drainage and Erosion Control Plan" and calculations are included in the Appendix,of
this report.
1
3.3 Onsite Flows
' Flows within this site will take the form of overlot and street flow. All proposed grading has
been designed to carry flows away from structures to the existing and proposed
' detention/retention areas.
' 3.4 General Flow Routing
The site runoff will, in general, be routed to the southeast comer of the site to conform to the
' existing flow patterns. The final drainage pattern for this area has been developed to minimize
the amount of reconstruction on site and to utilitze existing drainage patterns and facilities
where possible. This will also enable the flows released from this site to be limited to historic
' rates.
1
3
1
reports for specific sites in this area and discussions with City Stormwater Staff.
' Information for this report was also gathered from the following studies:
1. "Drainage and Erosion Control Report for New Belgium Brewery, Fort Collins,
Colorado', Water, Waste & Land, Inc., March 30, 1995 (WW&L Report)
' 2. "Final Drainage, Erosion and Storm Water Quality Study East Vine Streets Facility
' P.U.D., Phase One Final, City of Fort Collins", RBD. Inc. Engineering Consultants,
Updated June 28, 1993.
' The overall drainage plan for the New Belgium Brewery First Filing has been prepared to be
consistent with the above reports and the results of discussion with City Staff.
2. EXISTING DRAINAGE
1
Currently, offsite flows enter this site from a small area to the north via overland flow and
from the west from Linden Street through an existing sidewalk chase/concrete pan that was
designed and constructed as part of the original New Belgium Brewery. The flows leave the
' site through a detention pond (Pond A) that outlets into an existing underground storm sewer
system that was designed and constructed as part of the original New Belgium Brewery. Said
' existing storm sewer system outlets into a swale along the west side of First Street and is
conveyed to the Cache La Poudre River.
' In addition, the City of Fort Collins has constructed an area inlet near the outlet of the
aforementioned underground storm sewer system that was connected to an existing
' underground storm sewer pipe in First Street. (Phis pipe also outlets into the Cache La Poudre
River.) The intent of said area inlet was to collect the minor flows in this area to mitigate the
' standing water in the outfall swale during low flow (minor rainfall events and on -site
irrigation) with the flows from the major storm still being conveyed to the Cache La Poudre
' River via the outfall swale.
2
1. INTRODUCTION
' 1.1 Project Location
The New Belgium Brewery First Filing is the proposed expansion of the existing New
Belgium Brewery. This project is located in Section 12, Township 7 North, Range 69 Hills
West of the Sixth Principal Meridian, in the City of Fort Collins, Colorado. (See FIGURE 1 -
' VICINITY MAP.) More specifically, this site is bounded on the south by Buckingham Street,
on the west Linden Street, on the north by the City of Fort Collins' Streets Facility, and on the
' east by un-platted. property. The site contains approximately 7.17 acres.
1.2 Site Characteristics
' The topography of this site is broken into two distinct areas, the existing brewery and the area
of the proposed expansion. The existing brewery consists of a building, drive and parking
' area, landscaped area, and a sparse grassy area at the rear of the building. The area of the
proposed expansion consists of average covered pasture land. This site slopes to the southeast
' at approximately one percent (1%).
' 1.3 Purpose and Scope of Report
This report defines the proposed final drainage and erosion control plan for the New Belgium
Brewery First Filing, including consideration of all on -site and tributary off -site runoff.
1.4 Design Criteria
' This report was prepared to meet or exceed the submittal requirements established in the City
of Fort Collins' "Storm Drainage Design Criteria and Construction Standards" (SDDCCS),
dated May 1984 and Revised January 1997. Runoff computations were prepared for the 10-
year minor and 100-year major storm frequency utilizing the rational method.
' Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual"
(UDFCD), 1984, developed by the Denver Regional Council of Governments, has been
' utilized.
' 1.5 Master Drainage Basin & Other Drainage Reports
This site is included in the Cache La Poudre River Master Drainage Basin. It is our
' understanding that a master plan and report does not exist for this basin. Therefore, drainage
outfall points and release rates have been determined through review of previous drainage
' 1
1
' L
' APPENDIX A
MAPS AND FIGURES.......................................................10
APPENDIX B
' HYDROLOGIC CALCULATIONS 11
......................................
' APPENDIX C
' DETENTION/RETENTION POND CALCULATIONS ...................... 12
APPENDIX D
EROSION CONTROL EFFECTIVENESS
CALCULATIONS, SCHEDULE, AND COST ESTIMATE ................... 13
' APPENDIX B
' HYDROLOGIC CALCULATIONS ...................................... 14
1
1
'
ii
I. k
' TABLE OF CONTENTS
PAGE
CERTIFICATIONS............................................................ i
TABLE OF CONTENTS....................................................... ii
'
1. INTRODUCTION.......................................................I
1.1 Project Location...................................................1
'
1.2 Site Characteristics................................................. 1
1.3 Purpose and Scope of Report .........................................1
1.4 Design Criteria .................................................... 1
'
1.5 Master Drainage Basin & Other Drainage Reports ........................ 2
2. EXISTING DRAINAGE..................................................2
'
3. DEVELOPED FLOWS ................................................... 3
3.1 Method...........................................................3
'
3.2 Offsite Flows......................................................3
3.3 Onsite Flows.....................................................3
'
3.4 General Flow Routing .............................................. 3
3.5 Proposed Drainage Plan .............................................4
3.6 Hydrologic Analysis of the Proposed Drainage Conditions ................. 4
3.7 Allowable Street Flow Capacities ..................................... 6
3.8 Curb Inlet Design ............................. ..... . .. 6
3.9 Storm Sewer Design...............................................6
4. DETENTION/RETENTION............................................... 7
5. EROSION CONTROL ................................................... 7
6. MISCELLANEOUS.....................................................7
6.1 Variances........................................................7
6.2 Irrigation Ditches .................................................. 8
' 6.3 Ditch Company Approval ................................... 8
6.4 Maintenance Agreements . ......... 8
' 7. REFERENCES.........................................................8
1
July 8, 1997
Mr. Basil Hamdan
City of Fort Collins
Stormwater Utility
135 Mathews
Fort Collins, CO 80521
RE: Final Drainage and Erosion Control Study for New Belguim Brewery First Filing.
Basil;
We are pleased to submit to you for your review and approval, this Final Drainage and Erosion
Control Study for New Belguim Brewery First Filing. All computations within this report have been
completed in compliance with the City of Fort Collins Storm Drainage Design Criteria.
We appreciate your time and consideration in reviewing this submittal. Please call if you have any
questions.
Sincerely,
JR Engineering, Ltd.
Prepared by:
David Klockeman, P.E.
Project Manager
Reviewed by;
Patricia Kroetch, P.E.
Project Manager
1
1
1
1
1
1
1
1
1
�1
1
1
1
n
FINAL DRAINAGE AND
EROSION CONTROL REPORT
NEW BELGIUM BREWERY FIRST FILING
(POUDRE RIVER DRAINAGE BASIN)
Prepared for:
NEW BELGIUM BREWING COMPANY
500 LINDEN
FORT COLLINS, COLORADO 80524
Prepared by:
JR Engineering, Ltd.
2620 East Prospect Road, Suite 190
Fort Collins, Colorado 80525
(970)491-9888
July 8, 1997
Job Number 9067.02