HomeMy WebLinkAboutNEW BELGIUM BREWERY, 2ND FILING - PDP / FDP - 1-95B - CORRESPONDENCE - (3)CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE: April 28, 1997
ITEM:
APPLICANT:
LAND USE DATA:
COMMENTS:
New Belgium Brewery Multi -Phase Expansion
New Belgium Brewery c/o Merl Haworth, Neenan Company, 2620
East Prospect Road, Fort Collins, CO. 80524.
Request for multi -phase expansion of the brewery. First phase
would be for 12 new holding tanks immediately north of the
existing structure. Future phases are anticipated to be constructed
annually and could include up to eight phases. New areas include
10,000 square feet of additional warehouse space, new mechanical
room, new brewhouse, new loading dock, new office, and other
miscellaneous space for the operation of the brewery. Site includes
additional land to the north and east for.a new total of about eight
acres.
The site is zoned "I," Industrial, which allows for a brewery. Please be aware that.in.the..
Industrial zone, the maximum allowable.parking is .75 spaces per. employee. Parking for..
bicycles should be provided.at a minimum of 5% of the,car parking..
2. Shared access with the existing private drive on the north would be up to the City of Fort
Collins Streets Facility. Please contact Larry Schneider, 221-6615, for further
information.
3. The expansion would require the relocation of the existing electrical transformer. A new
larger transformer must be sized according to .the anticipated electrical needs for the
ultimate build -out. A Commercial One ("C-1") Form will be required to determine
entrance capacity. A one inch diameter conduit will be required to connect the new
transformer to the building. A telephone line will need to be provided at the new electrical
meter location. For further information, please contact Monica Moore, 221-6700.
4. If a new larger water service is needed for the building, then a new water plant investment
fee and raw water acquisition fee must be paid that covers the difference between the cost
of the old water tap and the new water tap. There is a 12 inch diameter water main and an
eight inch diameter sanitary sewer main in Buckingham available to serve the expansion.
A sanitary sewer line is available in Linden Street if needed. For further information,
please contact Roger Buffington, 221-6681.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO. 50522-OSSO (970) 221-675(1
PLANNING DEPARTMENT
13. You should verify whether the Street Oversizing Fee for the 12 new tanks is applicable as
this land area was included in the original building permit. The Street Oversizing Fee for.
the newly acquired land area will be $7,292 per acre based on the classification of a micro -
brewery as a light industrial land use, For further information regarding the assessment
.and .estimation'of the Street Oversizing Fee, please contact Matt Baker, 221-6605.
14. It is strongly recommended that we hold a neighborhood information meeting to discuss
both short and long term expansion plans with the Buckingham neighborhood. You
initiate the request at the appropriate time. The City will prepare the notification area for
the mailing list.. The list should be on self-adhesive labels, 33 labels per sheet. We charge
.50 cents per name. The City will set up and facilitate the meeting.
5. The new additions to the building are subject to the new non-residential energy code
adopted in July of 1996. For further information regarding the applicable Uniform
Building Code, and the locally adopted amendments, please contact Sharon Getz, 221-
6760.
6. The site plan on the Preliminary Development Plan must show the location of the all the
existing fire hydrants that serve the expanded property. For any walls in excess of 100
feet in length, there must be an approved fire door. For pallet racks, or "high pile storage"
in the new warehouse in excess of 12 feet in height, there must be special venting as per
the Fire Code. For further information on Fire Code issues, please contact Roger Frasco,
221-6570.
7. The site is located in the Poudre River Drainage Basin. Presently, there.is no storm
drainage fee in this particular basin but fees are contemplated for consideration sometime
in 1997. The fee is applicable at the time of building permit issuance.
8. For the immediate installation of the 12 new tanks, please provide verification that this
area was analyzed in the original Drainage Report and Grading and Drainage Plan and that
construction in this area can be accommodated by the existing storm drainage system.
9. For the future phases, the original Drainage Report and Grading and Drainage Plan must
be updated to include the new. areas. The Erosion Control Plan should be prepared so that
each phase anticipates the amount of land disturbed and the erosion control bond can be
estimated without having to re -submit documents on a phase -by -phase basis. For further
information, please contact Glen Schlueter, 221-6589.
10. For the immediate request (12 new tanks), please provide information on how many new
employees, if any, will be hired in order to assess the parking capacity. For the future
phases, one of the submittal requirements is to prepare a Traffic Impact Study.. The study
should address all modes of travel, including bikes, pedestrians, and transit. Please contact
Eric Bracke, 221-6630, to set up a meeting to discuss the scope of the Traffic Impact
Study.
11. For the immediate request, the Engineering Department will require an updated Utility.
Plan that addresses the area of the 12 new tanks. For the future phases, new Utility Plan
should be prepared that includes the new land area. Public improvements (sidewalk, curb,
gutter) will be required to be extended along the newly purchased frontages along
Buckingham and Linden. A Development Agreement will be needed. It is anticipated that
the Development Agreement will address what public improvements will be required at
each particular future phase. For further information, please contact Mike Herzig, 221-
6750.
12. The owners of the Coy Ditch will be a signature party on the Final Plan for the future
phases.
,
Comn, ity Planning and.EnvironmentL ervices
Current Planning
City of Fort Collins
Mr. Merl Haworth
Neenan Company
2620 East Prospect Road
Fort Collins, CO 80524
Dear Mr. Haworth:
April 28, 1997
For your information, attached is a copy of the Staffs comments concerning the
Request for multi -phase expansion presented before the Conceptual Review Team
on April 28, 1997.
The comments are offered informally by Staff to assist you in.preparing the detailed
components of the project application. Modifications and additions to these comments
may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the
review process, please feel free to call me at 221-6750.
Sincerely,
T. J�to�
Ted Shepard
City. Planner
TS/vrm
cc: Eric Bracke,. Streets Department
Stormwater Department
Project Planner
File