Loading...
HomeMy WebLinkAboutWATERFIELD PUD, FIRST FILING - FINAL - 7-95C - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYt From: Eric Bracke To: FCI.ENG_NET(dstringer) Date: 6/23/97 1:54pm Subject: Traffic study for Summitview -Reply you are correct. The study has various destinations that different types of trips. Based on the Travel Time Study, where the majority of traffic is headed and make decisions roadway(s) need improvement. I hope this helps. Eric CC: FCI.CPES(MLUDWIG), can be assumed to be we should be able to infer on which particular From: Dave Stringer To: TS.STR.ebracke Date: 6/23/97 11:46am Subject: Traffic study for Summitview Eric, I need your input on this question. When we met with Lucia and others on the Waterfield project there was much discussion about traffic using Summitview to Timberline once this connection was built and it was my understanding that Matt Delich was going to look at this and determine what would actually happen. Is this correct? Is a study needed to support this theory? Matt has a call into me and I need to get back to him ASAP. Thanks , Dave CC: CPES.MLUDWIG P"z DaVE SrWNGeR- � ��Qrpglon3 SQTJO7 /a1F0 WILL $g- �u(a6D )r A- LA� D*T� DAX.E t n,�Fo �� E eiCrtAQOS GA PU'n 1s 6n(- raz. 4/z31&77