Loading...
HomeMy WebLinkAboutWATERFIELD PUD - PRELIMINARY - 7-95B - CORRESPONDENCE - CITY STAFF65.00 2.47 10.86 0.25 10.61 70.00 2.35 11.10 0.27 10.84 75.00 2.22 11.26 028 10.98 80.00 2.10 11.34 0.30 11.03 85.00 2.00 11.47 0.32 11.15 90.00 1.90 11.54 0.34 I1.20 95.00 1.80 11.54 0.36 11.18 100.00 1.70 11.47 0.38 11.09 105.00 1.65 11.69 0.40 11.29 110.00 1.60 11.88 0.42 11.46 115.00 1.55 12.03 0.44 11.59 120.00 1.50 12.15 0.45 11.69 125.00 1.45 12.23 0.47 11.76 130.00 1.40 12.28 0.49 11.79 135.00 1.35 12.30 0.51 11.79 140.00 1.30 12.28 0.53 11.75 145.00 1.25 12.23 0.55 11.68 150.00 1.20 12.15 0.57 11.58 155.00 1.17 12.20 0.59 11.62 160.00 1.13 12.24 0.61 11.63 THE REQUIRED POND SIZE = 11.78894 ACRE -FT THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 130 MINUTES 75.00 2.22 10.70 0.47 10.23 80.00 2.10 10.77 0.50 10.27 85.00 2.00 10.90 0.53 10.37 90.00 1.90 10.96 0.56 10.40 95.00 1.80 10.96 0.59 10.37 100.00 1.70 10.90 0.62 10.27 105.00 1.65 11.11 0.66 10.45 110.00 1.60 11.28 0.69 10.60 115.00 1.55 11.43 0.72 10.71 120.00 1.50 11.54 0.75 10.79 125.00 1.45 11.62 0.78 10.84 130.00 1.40 11.67 0.81 10.86 135.00 1.35 11.68 0.84 10.84 140.00 1.30 11.67 0.87 10.79 145.00 1.25 11.62 0.90 10.71 150.00 1.20 11.54 0.94 10.60 155.00 1.17 11.59 0.97 10.63 160.00 1.13 11.62 1.00 10.63 THE REQUIRED POND SIZE = 10.85633 ACRE -FT THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 130 MINUTES DETENTION POND SIZING BY FAA METHOD Developed by Dr. James Guo, Civil Eng. Dept., U. of Colorado Supported by Denver Metro Cities/Counties Pool Fund Study Denver Urban Drainage and Flood Control District, Colorado EXECUTED ON 04-08-1997 AT TIME l 1:28:04 PROJECT TITLE: TYPE IN THE PROJECT TITLE **** DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = 2.00 BASIN AREA (acre)= 65.01 RUNOFF COEF = 0.71 ***** DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) = 100.00 INTENSITY(IN/RR)-DURATION(MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100 120 150 190 INTENSITY 9.0 7.3 5.2 4.2 3.5 3.0 2.6 2.1 1.7 1.5 1.2 1.0 ***** POND OUTFLOW CHARACTERISTICS: MAXIMUM ALLOWABLE RELEASE RATE = 4.53 CFS OUTFLOW ADJUSTMENT FACTOR = 1 AVERAGE RELEASE RATE = 4.53 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR. ***** COMPUTATION OF POND SIZE RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE -FT ACRE -FT ACRE -FT 0.00 0.00 0.00 0.00 0.00 5.00 9.00 2.88 0.03 2.85 10.00 7.30 4.68 0.06 4.62 15.00 6.25 6.01 0.09 5.92 20.00 5.20 6.67 0.12 6.54 25.00 4.70 7.53 0.16 7.38 30.00 4.20 8.08 0,19 7.89 35.00 3.85 8.64 0.22 8.42 40.00 3.50 8.97 0.25 8.73 45.00 3.25 9.38 0.28 9.09 50.00 3.00 9.62 0.31 9.30 55.00 2.80 9.87 0.34 9.53 60.00 2.60 10.00 0.37 9.63 65.00 2.47 10.31 0.41 9.91 70.00 2.35 10.55 0.44 10.11 DETENTION POND SIZING BY FAA METHOD Developed by Dr. James Guo, Civil Eng. Dept., U. of Colorado Supported by Denver Metro Cities/Counties Pool Fund Study Denver Urban Drainage and Flood Control District, Colorado ............. EXECUTED ON 04-09-1997 AT TIME 07:52:26 PROJECT TITLE: WATERFIELD **** DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = 1.00 BASIN AREA (acre)= 77.12 RUNOFF COEF = 0.63 ***** DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) = 100.00 INTENSITY(IN/HR)-DURATION(MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100 120 150 180 INTENSITY 9.0 7.3 5.2 4.2 3.5 3.0 2.6 2.1 1.7 1.5 1.2 1.0 ***** POND OUTFLOW CHARACTERISTICS: MAXIMUM ALLOWABLE RELEASE RATE = 2.75 CFS OUTFLOW ADJUSTMENT FACTOR = 1 AVERAGE RELEASE RATE = 2.75 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR. ***** COMPUTATION OF POND SIZE RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE -FT ACRE -FT ACRE -FT 0.00 0.00 0.00 0.00 0.00 5.00 9.00 3.04 0.02 3.02 10.00 7.30 4.93 0.04 4.89 15.00 6.25 6.33 0.06 6.27 20.00 5.20 7.02 0.08 6.94 25.00 4.70 7.93 0.09 7.83 30.00 4.20 8.50 0.11 8.39 35.00 3.85 9.09 0.13 8.96 40.00 3.50 9.45 0.15 9.30 45.00 3.25 9.87 0.17 9.70 50.00 3.00 10.12 0.19 9.93 55.00 2.80 10.39 0.21 10.18 60.00 2.60 10.53 0.23 10.30 -I-ep-rcrla, PTAs N A- 4 was 1 to ,d.P o ^ - 3-7. e:, lac. . 1ST�2.1�NOFF C�.t�E�PIGiEAlT - �, ZG �S �P P06mo �-rz � • SS ���,��� use71, v, c>S Vs 2 yam.-►-I-►s-rz�rla. �eur.,orf = �o.z�l.oxo.�o����.�� 1J or D I PAC-(�`h.:;' I VjTb L& I'�a . 74eZePOee , 1Z.ELE-04-5E FeCXYN PDQ p ° WT—MTLn r tDS v lG✓ No-r V I zecTl>1 F=aom vv-),O..0 S 1t1= OL-'l -ou-/ . �'pa.WApllgy gllTutr'Ilva y����" Q' (y�y SIP ��'I ��r,'r. � Y , '{... . r( L•.Y'. , P9 a � �.•pa A%Q.M/• / �1 •,"�::1 1•'tuja.; e..a i i2iYM'n'.Iri+�. • ,`, Hi•{i.' 1 r 33 i e \\•�� IIII •�•`p so 7 +gip\W: 1 ♦e T 7 N 4495 � w ♦ 1 aai Norlhrx 'I hrBlack ow �t.N919Y+ -rx 9/ unc n I_9 ..-B RUNG N a �IIERN + ...... ••...... Trs WNTO ' r FORT — CO Y ems- N93 +• ARPARS......-. :. 19 ♦'�: i—-------� Inn • ■ \ I ■ f-» j -• I Lwn ♦� ••� 35 low • I' i_' Park goer\ ' r`1 � � \ W'vtI � Yam' II \ i • • • .♦' ;� J. IftEr 116 Inf 7 .a Ix 1� `--_+.1••1 �y,. ..�2+ lAI1 •• eel st --.•.-r 1 1 .. p 111 Euwa Paru r 4 1 1 i �Ps/ern � r r�1Te.� 1✓uTt Nv �r�.s i �..1 I I G but�tiD �L C»� - �7 �I o 1 -�o• Zo�1,2S��i�/z d.aS'/a `3�-7 rnIN �7NG.Er�1T2A"1�O Z��jO L1= 7Z.CU �� = zi M1Q I� �C = 'Z�)-1 t Z I = I I t-> cnr, i si Ca .2o��I o 2-5EP)1 s� C -7� . t� �� = 27 e S cis 0 0 0 ',�jE Lj,$IL_L hfr' r�MC C, Cl)L1 -Ty r=o? Z7, cJ c 5 ►..I oT1= = 2-77 , � e--� < 100 GAS b2-IC,lt,jAL DESic=u LU.4s pEs�v,D Tb IOp cos 1�-)-2D"� Il-Fe SITE a'+ \3j ILt_- be Uj / (fJ 1 EZ�DNI S5WALG OT.I 1k7U.! Kl - STZZ,,aM StOE -PF IEfz-t6briloN D�Tr-AN We have also reviewed comments contained in the report and on the preliminary Utility plans and can address these comments at time of final design. Thank you for your time and consideration. Please feel free to call if you have any questions regarding this letter. Sincerely, Roger Curtiss P.E. - Northern Engineering Services, Inc. cc: Jim McCory - Colorado Land Source Mike Ludwig - City of Fort Collins could provide approximately 11.2 acre-feet of storage, based on an outlet at elevation of approximately 4940, and a 100 year high water surface elevation of 4945. In our original design the wetlands is being utilized for some detention storage. In our original calculations, we assumed a high water surface elevation of 4952, with a pond outlet of 4950. This resulted in storage volume of approximately 16.58 acre-feet. We used a release rate of 12.75 cfs, and calculated a required storage volume of 7.62 acre-feet. As we discussed, we could utilize more of the available storage in this wetlands area by reducing the outflow. Attached are revised pond calculations showing a reduced outflow of 2.75 cfs, resulting in a required detention storage needed to 11.79 cfs, still well below the existing capacity. Since the runoff from this pond is not directly released into the Lake Canal, but into detention pond 2, this should not directly reduce the amount of permissible release from the site, based on the 2 year historic rate of Basin H4. At time of final design, a SWMM model will be developed for this site to account for routing, and differences in detention volumes. The excess volumes shown in both ponds should account for any small additional requirements that a SWMM model might reveal. Item No. 4 - Historic values were recalculated for Basin H-4 using a runoff coefficient of 0.20. Item No. 5 - There is only one outlet to the Lake Canal, and it is being sized for the historic rate. There is a small amount of developed runoff from Vine Drive which due to grade cannot be routed through detention pond 2. At time of final design the peaks from both the pond and undetained portion of Vine Drive will be analyzed to insure that the peak discharge from the site does not exceed the agreed to historic rates. Item No. 6 - We are working with the Ditch Company, and will get a letter of intent as soon as possible. Item No. 7 - Again we have made contacts with the affected parties, and will endeavor to obtain letters of intent as soon as possible. Item No. 8 - These will be provided at time of final design. Item No. 9 - The original runoff calculations have the frequency adjustment factor already included. The attached detention calculations have been modified to include the adjustment factor. Item No. 10 - We will coordinate design of drainage conveyance with the landscape consultant. Item No. 11 - OK April 9, 1997 Mr. Basil Harridan City of Fort Collins Utility Services Stormwater 235 Mathews Fort Collins, Colorado 80522 RE: Waterfield PUD Preliminary Stormwater comments dated January 22, 1997 Dear Basil, This letter is in response to Stormwater comments regarding project #7-95B Waterfield PUD Preliminary dated January 22, 1997. Our response to your comments is also based on our meeting of April 3, 1997. Item No. I & 2 - Our original design included routing 100 cfs from upstream through the Waterfield site. This was based on the Cooper Slough Master plan. We will now design to accommodate the historic 100 year flows through our site. Attached are preliminary calculations for this upstream basin, and a copy of the USGS map which was used to determine the approximate boundaries for this basin. We found the historic flows to be approximately 27.5 cfs. Since our original design was for 100 cfs, this should not be a problem. The preliminary intent is to design an interception swale just to the south of the Irrigation ditch to intercept any overtopping that may occur. The upstream overflow can then be routed through the Waterfield site. The purpose of the interception swale is that it may be difficult to isolate where overtopping may occur. Item No. 3 - Generally, it is assumed that the Wetland area would eventually overtop. At that point, then basins H1-H4 would be historically drain to Lake canal. We are in the process of preparing an analysis of how this wetlands is fed, and it's relationship to the water surface elevation of the Larimer and Weld Canal. From our initial findings, the water surface elevation in the wetlands is directly related to the water surface in the ditch. Therefore, if the Larimer and Weld Canal was assumed full, it is highly unlikely that the wetlands would completely retain runoff from basins H1-H3. This will be investigated further at time of final design. For the purposes of this preliminary however, we assumed that basins H 1-H3 are completely retained in the wetlands area. Attached are calculations showing what the 2 year historic rate is for Basin H4 only. This also uses a historic runoff coefficient of 0.20. The historic rate for basin H-4 was found to be approximately 4.54 cfs. This rate was then used to recalculate the required on -site detention. The resulting detention requirement was found to be approximately 10.86 acre- feet (Calculations for this is all attached). Attached also is a preliminary design of a pond which 420 SOUTH HOWES, SUITE 202, FORT (OLLINS, (OLORADO 80521, (970) 221-4158, FAX (970) 22 1.4 159