HomeMy WebLinkAboutWATERFIELD PUD - PRELIMINARY - 7-95B - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (4)Item No. 4 - Offsite improvements to Vine are being discussed with Mike Herzig. It is our
understanding that there may be other projects ahead of this one which would have this
same requirement.
Item No. 5 - Again we are working with Mike Herzig to resolve these issues. There are
questions we have regarding the improvements that will be addressed at time of final
design.
Item No. 6 - Mike Herzig has received copies of the preliminary design for the grade
separated interchange.
Item No. 9 - Comments from Stormwater Utility have been addressed as a separate attachment.
Item 10 a & b - By others
Item No. 14 - Based on conceptual review, we were informed that service for this site would be
provided by ELCO. The comments we received indicated that service would now be provided by
the City of Fort Collins. Based on a telephone call from Webb Jones on April 9, 1997, ELCO has
now agreed to provide service. Northern Engineering will be providing a revised site plan to
ELCO, and will coordinate design of water system based on this revised site.
Item No. 16 - Will be accounted for in final design.
Comments regarding the preliminary plat have been noted, and will be accommodated with the
final plat for the site.
Please feel free to call if you have any questions regarding this letter, or have any other questions
regarding this project.
Sincerely, j
J
Roger A. Curtiss P.E.
cc: Jim McCory - Colorado Land Source
Cathy Mathis - Vaught -Frye Architects
Lucia Liley - March & Myatt
Basil Hamdan - City of Fort Collins Stormwater Utility
Mike Herzig - City of Fort Collins Engineering Department
April 9, 1997
Mr. Mike Ludwig
Community Planning and Environmental Services
City of Fort Collins
PO Box 580
281 North College Avenue
Fort Collins, Colorado 80522-0580
RE: Waterfield PUD Preliminary
Response to City Comments
Dear Mike,
This letter is in response to the comments regarding engineering issues Northern Engineering
Services Inc. (NES) received regarding the Waterfield PUD Preliminary. Other items related to
planning and landscaping will be addressed under separate cover by other consultants. Primarily,
our response will be to comments posed by City Water and Wastewater, Stormwater, and
Engineering.
Response to comments from your letter dated February 14, 1997 to Cathy Mathis:
Item No. 1 - By others
Items No. 2, 11, 12, 14 - Items pertinent to utilities can be addressed at time of final design. When
final design for this site is submitted, we will request that the City schedule a Utility coordination
meeting to insure that all affected utility's concerns are met.
Items 3 through 7 - By others
Item 8 - General comments by Engineering
Item 1 - All of the additional Right -of -Way requirements are now being shown on the
revised site plan. In addition to the additional 55' of Right -of -Way, we have included an
additional 15' for utility easements.
Item No. 2 - By others
Item No. 3 - This parcel is not owned by the developer, and as such cannot be platted with
this project.
420 SOUTH HOWES, SUITE 202, FORT (OELINS, (OLORADO 80521, (970) 221-4158, FAX (970) 221 4159