HomeMy WebLinkAboutWATERFIELD PUD - PRELIMINARY - 7-95B - SUBMITTAL DOCUMENTS - ROUND 2 - TRAFFIC STUDYRPR-07-1997 22:51 ITTHEW DELICH PE 3036695034 P.04
lanes may be implemented when improvements occur related to
this and other developments. I would not argue against
implementation of the left -turn lanes at this intersection.
2. I agree that left -turn lanes are needed on Vine at Merganser
Drive and Wood Drive. The need for right -turn lanes at these
streets will not occur until the longer range future.
If there are further concerns or questions pertaining to these
responses, please contact me.
TOTAL P.04
APR-07-1997 22:51 "9TTHEW DELICH PE 3036695034 P.03
the City Structure Plan, a reasonable interpretation would indicate
that the extension of Conifer between Merganser Drive and CR9E
occurs north of the irrigation ditch. This would require a single
structure over that ditch. This could be accomplished by turning
Conifer slightly to the north and continuing to CR9E, or providing
off set intersections along Merganser Drive. in my judgment, an
alignment north of the irrigation ditch is more appropriate.
Another consideration should be the nebulous design of the "Mixed -
use District" shown on the Fort Collins City Plan. Until more
definition is given to this area, perhaps this leg of Conifer
should be subject to further review.
S. No comment
4. The primary direction of travel in the short range future will
be to the west along Vine Drive. As other things occur in the
future (Mixed -Use District, Timberline Extension), the
importance of Vine Drive will moderate with regard to this
development.
5. No comment
B. As per a number of meetings in March, a preliminary design is
underway. I have provided traffic forecasts for the Vine/CR9E
intersection to Northern Engineering Services. Northern
Engineering Services will determine the right-of-way needs.
Transportation Planning
1. Pedestrian walkways at the ends of cul-de-sacs are relevant
if there is someplace to walk to. These walkways are
appropriate to access another street that is beyond the bulb
of a cul-de-sac or a park, open space, school, etc. that can
be accessed through such a facility.
2. Bike lanes are included in the standard crops section for
these streets.
3. Frank Vaught and I discussed the possibility of vehicular
access or a drop-off area east of the school. Care must be
taken not to provide through access that would encourage non -
school traffic to go right passed the school.
4. No comment
Traffic operations
1. There is no doubt that left -turn lanes on all legs of the
Vine/Lemay intersection will improve the operation at this
intersection. However, using the short range forecasts, I
demonstrated that acceptable operation could -be achieved
without implementation of left --turn lanes. These left -turn
APR-07-1997 22:50
n
ITTHEW DELICH PE
3036695034 P.02
W
C3
t-
0
LL
LL
t
TO:
M10ORAPDUM
Jim McCort', Colorado Land Source
Fort Collins Staff
FROM: Matt Delich -700vl
DATE: April 7, 1997
SUBJECT: Waterfield PUD - Response to comments related to
traffic study (File: 9644MEM1)
This memorandum responds to comments regarding traffic
and transportation aspects of the Waterfield PUD. The
comments were made by Engineering (Mike Herzig),
Transportation Planning (Kathleen Reavis), and Traffic
Operations (Fred Jones). The following response addresses
each numbered comment from each department. A "no comment"
indicates that a traffic response is deemed to be not
appropriate.
Engineering
1. No comment
2. The forecasted volumes on Merganser Drive indicate that
it could be classified as either a collector street
(without parking) or a minor arterial street. The only
functional difference between these two streets is
provision of a continuous median lane on a minor
arterial. The necessary turn lanes can be incorporated
into the street design at appropriate locations if the
collector street classification is selected. The minor
arterial street classification would ensure that there
would be adequate pavement throughout. its length
regardless of where intersections might occur.
Classification of this street is the City's call.
The forecasts on Mood Duck Drive just north of Vine Drive
are collector street volumes. These volumes will
dissipate as wood Duck Drive penetrates the site. This
street will function as a collector street even though
there may be segments that do not have collector level
traffic volumes.
While it was always understood that Conifer would
eventually.be built from Lemay to Merganser (CR11), it
was not clear if Conifer would proceed through this site
or be north of this site. The current site plan clearly
does not have. Conifer going through this site. In
reviewing both the Fort Collins Master Street Plan and