HomeMy WebLinkAboutGLENMOOR P.U.D, 2ND & 3RD FILING - PRELIMINARY / FINAL - 8-95C - CORRESPONDENCE -with 90 degree angles on Plum Channel.
e) Address water quality issues in the channel and wetland treatment is a
possibility.
Please contact Basil Hamdan at 221-6035 if you have questions about
these comments.
3. The Light and Power offered the following comments:.
a) The normal development charges will apply.
Please contact Doug Martine at 221-6152 if you have questions about
these comments. `
4. The Water and Wastewater Departments offered the following comments:
a) The developer must evaluate the extension of sanitary sewer from
Glenmoor on the north or from Taft rather than through the easement
at the south side of the site. Due to the number of units in this project,
it is desirable to loop the water main from Glenmoor back t the main in
Taft; however, this may be dependent upon the cross-section on the
Plum Creek channel adjacent to Taft.
b) The water conservation standards for landscape and irrigation will
apply to the project.
c) Plant investment fees and water rights will be due at time of building
permit,
Please contact Roger Buffington at 221-6854 if you have questions about
these comments.
5. The Poudre Fire Authority offered the following comments:
a) The street widths and location of fire hydrants must meet
requirements.
b) We are beginning to require fire extinguisher units in each unit.
Please contact Roger Frasco at 221-6570 if you have any questions
about these comments.
7. The Engineering Department offered the following comments:
a) The ROW on Taft Hill is 57'/z now rather than 50'. Add a 15' utility
easement. (Check with the utility companies for possible conflicts with
Plum Creek).
b) Under the new Land Use Code (in effect March 28) you will have to
submit a project development plan. The project development plan will
generally specify the uses of land, the layout of landscaping,
circulation, architectural elevations, and building and preliminary plat.
The PDP is more specific than the Preliminary submittals for the
LDGS.
c) Density is no longer calculated on a gross acreage basis. The new
Land Use Code calculates density on a net basis. This is relevant as it
might increase the overall density of the project. The minimum
density in the MMN district is 12 du/acre (calculated on a net acre of
residential land).
d) In the MMN district, any on -street parking within or immediately
adjacent to the site can be counted toward the parking requirement of
the subject use. For each two-family and multi -family dwelling, the
following table identifies the number of parking spaces.
Number of bedrooms/dwelling unit
Parking spaces per dwelling unit
One or less
1.5
Two
1.75
Three
2.0
Four and above
2.5
e) Attached and multi -family dwellings which face a second street or
connecting walkway are exempt from subsection (1) through (4) of
Article 3, Section 5, E Garage Doors, of the Land Use Code.
However, the facade oriented to the second street or walkway spine
shall include windows, doorways, and a structured transition from
public to private areas using built environments such as porch
features, pediments, arbors, low walls, fences, trellis work, and/or
similar elements integrated with plantings.
f) You may choose to submit both Project Development Plan and Final
Plan concurrently.
Please contact Leanne Lawrie at 221-6750 if you have questions about
these comments.
b) Street oversizing fee for this is $895 per unit for attached housing on
separate lots.
c) Improvements will be required along Taft Hill including detached
sidewalks (like the ones to the north). Check the current street
standards. .
d) The internal street will need to be done according to the new street
standards (30' wide).
e) We would like to see the cul-de-sacs pulled in to allow more land to be
built upon.
f) If the street is .extended, may require an offsite easement
(construction and grading for access from adjoining property).
g) Detached sidewalks along Glenmoor Drive will be required.
h) Overlay Glenmoor so that it is equal to or better than condition.
Please contact Mike Herzig at 221-6750 if you have questions .about
these comments.
8. Traffic Operations noted that you will have to submit a Traffic Impact
Analysis. Contact Eric Bracke at 221-6062 for details on what this includes.
9. The Natural Resources Department offered the following comments:
a) We will need to schedule a time to meet and review any wetlands
disturbance. (This is to be done in the field.)
b) It is recommended to design the new channel in a natural fashion so
that it is not too heavily manicured.
c) You will need to submit an erosion control plan for fugitive dust
emissions and soil erosion.
d) It is recommended that trash collection is curbside and that a provision
is placed in the homeowner's association that people use the same
trash hauler. There is a city requirement for recycling for anything less
than eight units.
e) Is there a possible easement through Glenmoor Drive PUD to allow for
pedestrian and bicycle access? What about crossing Plum Creek to
Taft Hill Road for such access?
Please contact Susie Gordon at 221-6265 if you have questions about
these comments.
10. The Current Planning Department offers these following comments:
a) You will need to submit an A.P.O. (a list of affected property owners)
for notification of affected owners with 500' of the property.
y � r
MEETING DATE: March 17, 1997
ITEM: Glenmoor PUD 2"d and 3' Filing
APPLICANT: Dick Rutherford
Stewart and Associates
103 South Meldrum
Fort Collins, Colorado 80521
LAND USE DATA:
Request for 43 single-family townhomes, with the following breakdown: 9
structures consisting of four units, one structure with three units, and two
structures with two units each, located on 4.52 acres. These units are intended
to be the same as the twenty single-family townhomes to the north.
COMMENTS:
1. The Zoning Department offered the following comments:
a) The property is in the MMN-Medium Density Mixed Used —zoning
district. The use is a permitted use and is a type 1, administrative
review.
Please contact Gary Lopez at 221-6760 if you have questions about these
comments.
2. The Stormwater Utility offered the following comments:
a) This site is located within the canal improvement basin where fees are
$6,181/acre and it is subject to the runoff coefficient reduction.
b) The standard drainage and erosion control reports will need to be
submitted.
c) It was suggested that you review the Plum Channel update (as part of
the Glenmoor PUD) for the design of the channel.
d) Need to show that the 129 year event can be contained in this channel
/FO
Commur. Planning and Environmental vices
Current Planning
City of Fort Collins
March 21, 1997
Dick Rutherford
Stewart and Associates
103 South Meldrum
Fort Collins, Colorado 80521
RE: Conceptual Review Comments
Dear Mr. Rutherford:
For your information, attached is a copy of the Staffs comments Glenmoor PUD,
2"6 and 3' Filing which was presented before the Conceptual Review Team on
March 17, 1997.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Leanne Lawrie 8A)
Project Planner
xc: Eric Bracke
Stormwater Utility/Glen Schlueter
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750