Loading...
HomeMy WebLinkAboutRAFFERTY'S PUD - PRELIMINARY - 17-95 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (3)Ll r`"TER Di=+'d ID3nF7 AS'-'DCE.15 121'56 WALTEA DAVIDSON & ASSOCIATES Consulting Engineers & Surveyors May 3, 1995 Mr. Allan Blankenship Maxwell Architects, Inc. 631 Second Ave. S. Suite 1 F Nashville, Tennessee 37210 RE: Rafferty's Fort Collins WDA # 9509 Dear Allan; We have addressed the questions that have been raised on the review of the preliminary plans for The Fort Collins Rafferty s with the following exceptions: 1. Several comments that were made on sheet SD-1 were requesting information that was on sheet SU-1. The only purpose that was intended for sheet SD-1 was to outline the drainage area for the detention basin. In order to avoid this confession the drainage divide was added to sheet SU-1 and Sheet SD-1 was eliminated. 2. The exact location of the existing sanitary sewer manholes have not been determined at this time. This information will be obtained during the detailed survey of the property and will be shown on final plans. 3. The exact size of internal piping of storm drainage from the parking lot to the detention basin have not been determined at present and will be furnished to the City with the final plans. 4. The Final plat and dedication of the drainage easements required will be completed after the boundary and topographic survey of the property is completed and furnished to the City at the time final plans are submitted. If you have any questions please contact us. Yours Walter H. Davidson, P.E. cc: Mr. David Coode