Loading...
HomeMy WebLinkAboutLANDINGS OFFICE PARK P.U.D. - FINAL - 10-95A - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSJUL-19-95 WED 11:54 P.61 Posbftr branci �tax transmittal ensminy► memo iti t� s__ 7671 Ro�po9es July 14, 1995� City of Fort Collins 281 N. College Fort Collins, CO 80525 RE: Landings Office Park Storm Drainage Dear sirs: We have looked at the drainage plan for this project and are in agreement with how the proposed storm water will proceed from this project Into our ditch. One exception we have is that we require that the grassy Swale to the south of project be continued directly into the ditch and nQt be constructed with riprap or grout as shown. Furthermore, we agree to indicate our approval to the Landings Office Park storm drainage plan by our signature on the plat. Yours truly, hn Strachan President, Larimer Canal #2 J to� v NOTE: THSSOR1p7NAND NOT A SURVEY NO SU I3 WERE NOA$SET FOR THIS PROKCT. WRADO REVISED ISEF'ORTPRELIM'HARY INFORMATION ONLY. „.. ter., Fu.E NO. EXH1BiT E CALF BATE uR....^ - 1 Ot 1 , A91+,,Opc1 A 06/22/06 R8 — JUL-14-95 FR.I_ IZ;95 LANDSTAR CDMPANIES TEL:1-303-667-7151 wi a, P� OM C ACb ".p. 9W � , n5"I 7 LOW P.05 Jul 1IS95 9:54 N0.005 P.03 EXHIBIT A DRAINAGE EASEMENT p mmii p,p�ppo�r ►im 0 100 .r... 1-1 so 200 $CAI.I": 1"m100' JUL-14-95 FRI 13:23 P.04 �ANDSTAR COMPANIES TEL, 303-667-7151 Jul 1 `5 9:54 No.005 P.02 A-9224•ESM AE CR1pTI0N FOR pRATNAGS SZ+ISNT_ the Weat Halt of Section 34# Township 7 North That portion Of Larimer County. Colorado. described Range 69 WBst of the 6th P.M., as follows: 36 the West line of the Ncz•thw�st Quarter of 3eotiion as Considering s contained herein bearingNorth tand d South and with all bearincJ relative commencing at the No wfaet to the intersectionC, of said nof at20 oar CNF 28" 44' 32" East 2772.12the Southerlyy right-of-way of haf aw10 drainage pips with innin� of the Centerlinea easement Drive and the True point of Tghence a Ong said drainagOff foot drainage beginning of a tan�,ent cuzvena A radius of centerline South 26 44100' East x2.54 Peet; Cricnrve oath v to t East 18.58 feet to ah central angle of 53 3110711 Northwest, having along the arc of said curve and 200.00 feet; thence Southwesterly having B continuing along said easement centerline 186.82 feet O ,e beginning of a tangent curveanconcave adius of 161.60 afeets said central angle of 27.51#58's tangent from in d curve and Southwesterly along the arc of said curve and dantinuiniq along easement Centerline 78.60 feet; thence tang i continuing along saat id xoxima a Centerline Of o he La iller9 �� 480.00 feet to the applengthened to meet Canal No • of said eassmentntO be shortened d'ten d or 1enq center) ne . sidelines right -Of -way line of Boardwalk Drive. with said Southerly U JUL714-95 FRI 13:23 P.03 a one or try to get wo sen enceAt my0xt memo from John Straken, President 'olf Larimerr County Ditcht02 indicating the above. Thank you, Steve and Basil, for your assistance with this Project. Best regards. dk Enc. JUL-14-95 FRI 13:22 p,02 m To: Susanne Edminster From: Glen Schlueter )� IP Date: rebruary 14, 1995 subj: Easement across S.I.D. Property @ JFK & Boardwalk Jon pxouty has contacted me since our telephone conversation on February 9th. His engineer has an approximate size of the easement needed. They believe it may fit in 10 feet or a maximum of 20 feet. In order to confine the water to this small of an easement a swale would have to be constructed. Jon is *proposing to construct the swale as any future developer of the property would have to do. So in other words there would be an improvement to the property not devaluation of the property. The future owner would have to dedicate an easement to handle the off site. drainage and construct the swale since there is already an existing pipe draining water from the street onto the property. Jon proposes the Swale follow the western property line which is usually what is done. If the new owner wants it in a different location it is simply shown on the plat which easements are vacated and which are being added. If you have any questions or want to discuss this just give me a call at 6065_ Thanks cc: Jonathan J. Prouty JUL-14-95 FRI 13:22 _AGUNITAS COMPANY a' 3307 S. Cei303 2 lege Ave. .5000 FAX 2 6 5 25g, CO 80525 F A Pages Including Cover Sheet: — TO: 1tSteve Olt Basil Harridan FROM: Jon Prouty DATE: July 14, 1995 RE: Landings 1. Enclosed is a copy of the off -site legal description and a map showing how it is configured. Also enclosed is a copy of the letter from Suzanne Edminster Indicating the City,s approval to this drainage Swale. My understanding is that the City legal and surveying people are looking at this with regard to technical correctness and will get us the necessary off -site easement ASAP which may be after final Landings Office Park approval. I have discussed this with Basil and he agrees that since this Is an easement from the City to the City that above described arrangement is okay. 2. All the water from the site goes one way or another into the Larimer County Canal #2 and is not a very large amount Having met with the ditch company, they feel that an agreement is not necessary, the proposed plans look okay with one exception, and that their sign off on the plat will be their approval. P.01 The one exception is that they do not want grouted rock where the swale enters the ditch as the grouted rock used where the storm water from the post office enters the ditch has caused them some problems. in the alternative, they will prefer to see grassy Swale just continued straight into the ditch with no riprap or grout. Activity A: ALL DEVELOPMENT CRITERIA ALL CRITERIA I APPLICABLE CRITERIA ONLY Is the c.. tenon Will the c.-terior� acclicabte7 b satisfied? CRITERION 5 = s of Yes No If no, please explain G � Al. COMMUNITY -WIDE CRITERIA. 1.1 Solar Onentaticn I I I I 1.2 Cernorehensive Plan I I I I/ I 1.3 Wildlife Habitat I I I✓I i 1.4 Mineral DepCsit 1 10 I 1 -T. 5 Ecciocically Sensitive Areas I reserved I I I 1.6 Lands of AcricCitural Imocrtance I reserved 1.7 Enerav CCnseriaticn I I ✓I ! ' I I 1.8 Air Qualitv 1 I ✓I I ✓ 1.9 Water Quality I I./1 I I I 1.12 Residential Density I I I ✓I I A 2 NE11G'r'EGRH00D COMPA721LlTY CRITE:R.IAI I 2. 1 Ve.nicuiar. Pec=sirian. Bike Trensccration I It/1 I 2.2 Buiidir.c Pacer .ant and Orientation I I J I 1 L 9 Nat cl t-ect, reS 2.4 Ve^icular Circulation and Pa,, 2.5 ErnergenC.V ACCesj _ 2.� Pecestran Circulation 2.7 Arc; ,itec;ure 2.8 Buucme Heic_r.: and Views 2.9 Shading 2.10 Soler Access 2.11 Historic Resources 2.12 Setbacks 2.13 Landsc=oe 2.14 Sicns 2.15 Site Lichtinc 2.16 Noise and Vibration 2.17 Glare or Heat 2.18 Hazardous Materials A 3. ENGINEERING CRITERIA 3.1 Utility Capacity 3.2 Desicn Standards 3.3 Water Hazards 3.4 Gecloeic Hazards U !✓I I ✓ I I ! I I I I ✓ I i I I I i l I I I I I ✓1 I ✓ I I ✓I I-" . I I I I ✓I ✓1 I ✓ I I Tv I I� ✓i I ✓ I Land Development Guidance System for Planned Unit Developments The City of Fort Collins, Colorado, Revised h 1994 -61- IA-5 usj - May 22, 1995 Planning and Zoning Board Members c/o Planning Department City of Fort Collins 281 N. College Fort Collins, CO 80522 RE: Landings Office Park / Final Approval Dear Planning and Zoning Board Members We believe the Landings Office Park represents a creative way to solve the need for ownership of office space by small office users. Traditionally, small office users, virtually regardless of their financial strength, have faced difficult challenges in their efforts to own office space - a) the complexities of land ownership, development and construction, b) difficulties in obtaining financing, and c) lack of efficiencies of scale necessary to make their project economically feasible. We have created this office project in an effort to overcome these obstacles and meet the needs of this market segment. We believe this small, well designed, well landscaped, attractive residential scale office project will meet these needs and also will be an appropriate and attractive use for this prominent site on Boardwalk immediately north of the post office and bordered by JFK and Landings. We respectively request your favorable consideration and approval for our Landings Office Park. Sincerely, �-, " J athan J. Prouty President dk 3307 South College Avenue, Suite 200, Fort Collins, CO 80525 • (303) 226-5000 - Fax (303) 226-5125 �8 w ■ Ills I �6 io 1 .�1� II 1 .li �.al�l� �i3lfil��j • ��L w�4K Gam. TYPICAL PLANT UST FOR FOUNDATION k...... �PLANTMGS AND INTERIOR ISLANDS vo*.sa xue ca«Lx x..c vecwouG rotes ��.... a Px.� w .s.. p T1TIfi1L IgImATION PLNtt.tl. p.TAIL Gut. r.f. ^�+^*� �• �� "'� .Tmw! =MwtM M v_Y _G xsA bbSV n usr4 bca�aR. MrpK r ..Nv 4xrt ny.r[ eetMO .M.c[ ..q W M, i W e11ty Irt t.i W .� N Wert rw_ ..— eraxw> >eMv .ry nete.M 9'"^tit..• P be comxtnt. tY I PLANT LIST FOR TREE AND ENTRY PLANTINGS eo*nut xGe. camp. xG.e K owYm. e r Wu u u xwe tl[ r 416 M r lronlro. � MBPkY SeY•x w w.e ` 3' eG ]O }L4 .Y. esJRs 4an.Pv. G.bv. t.n.. Y [I i1 .Gas Inuum ur G Ga qlL] �'nOc I . .urG xr� l.vaY.o- Y'sa 'ab i PLANT NOTES wr, Z- LANDINGS OFFICE PARK P.U.D. LA G FINAL LANOSCAPE PLAN 77, o`�i�m�nR i I. ! I i 3 , .tic' A W lW I� SOE ELEVATION FRONT ELEVATION VKMi" N PLANNNG AND ZONNG OWNER'S CERTMATION BOARD APPROVAL a�a.-ar�rrsr .L4. � I II � I' o..e✓wmuw �rrs— - r- - I LLow I � III I i I 9 lil sn , tl nG AYOW�W / 2y� li VIUCHT IRYR LANDINGS ^� � OFFICE PARK P.U.D. � N VICINITY MAP 07/18/95 10-95A LANDINGS OFFICE PARK PUD Final DINGS OFFICE PARK PU❑ Landings Office Park PUD, Final, 410-95A July 24, 1995 P & Z Meeting Page 5 planned unit development final plan was conditionally approved; or, if not so executed, that the developer or the City staff, at said subsequent monthly meeting, apply to the Board for an extension of time. The Board shall not grant any such extension of time unless it shall first find that there exists with respect to said planned unit development final plan certain specific unique and extraordinary circumstances which require the granting of the extension in order to prevent exceptional and unique hardship upon the owner or developer of such property and provided that such extension can be granted without substantial detriment to the public good. If the staff and the developer disagree over the provisions to be included in the development agreement, the developer may present such dispute to the Board for resolution. The Board may table any such decision, until both the staff and the developer have had reasonable time to present sufficient information to the Board to enable it to make its decision. (If the Board elects to table the decision, it shall also, as necessary, extend the term of this condition until the date such decision is made.) If this condition is not met within the time established herein (or as extended, as applicable), then the final approval of this planned unit development shall become null and void and of no effect. The date of final approval for this planned unit development shall be deemed to be the date that the condition is met, for purposes of determining the vesting of rights. For purposes of calculating the running of time for the filing of an appeal pursuant to Chapter 2, Article II, Division 3, of the City Code, the "final decision" of the Board shall be deemed to have been made at the time of this conditional approval; however, in the event that a dispute is presented to the Board for resolution regarding provisions to be included in the development agreement, the running of time for the filing of an appeal of such "final decision" shall be counted from the date of the Board's decision resolving such dispute. Landings Office Park PUD, Final, #10-95A July 24, 1995 P & Z Meeting Page 4 5. Storm Drainage: The Larimer County Canal #2 is located just to the north of this property, cutting diagonally from northwest to southeast between South College Avenue and Landings Drive. Surface stormwater from this development will contribute to the canal; therefore, the ditch company must be part of the utility plan approval with the final P.U.D. Also, an off -site drainage easement is required on a City -owned property south and east of this site (east of the Post Office). The City is granting a 10' wide easement for a grass -lined swale (to be constructed by this developer) along the western boundary of the City's property. A location drawing and legal description for the easement has been submitted to the City. Also, submission of written approval from the Larimer County Canal #2 to accept the drainage flows from this development has been submitted. Final P.U.D. approval is dependent on the City accepting the location and the granting of the drainage easement and the Larimer County Canal #2 Ditch Company signing of the utility plans. The condition of preliminary approval relating to the requirement for an off -site drainage easement and ditch company approval has been met. FINDINGS of FACT/CONCLUSIONS: In evaluating the request for the Landings Office Park P.U.D., - Final, staff makes the following findings of fact: * It is in conformance with the Landings Office Park P.U.D., Preliminary. * It meets the applicable All Development Criteria in the L.D.G.S. * The three conditions of preliminary P.U.D. approval have been met. * The project location is excluded from the Residential Neighborhood Sign District; therefore, all aspects of proposed signage will be regulated by the Fort Collins Sign Code that is administered by the Zoning Department. RECOMMENDATION: Staff recommends approval of the Landings Office Park P.U.D. - Final - 910-95A, with the following condition: The Planning and Zoning Board approves this planned unit development final plan upon the condition that the development agreement, final utility plans, and final P.U.D. plans for the planned unit development be negotiated between the developer and City staff and executed by the developer prior to the second monthly meeting (September 25, 1995) of the Planning and Zoning Board following the meeting at which this Landings Office Park PUD, Final, #10-95A July 24, 1995 P & Z Meeting Page 3 Landscaping: The project will have deciduous street trees in parkways between the streets and sidewalks on the three sides adjacent to streets; a mix of deciduous, ornamental, and evergreen trees throughout the site; shrub beds with building foundation plantings; and shrub beds at the entries to the project. Parking: The project is providing 133 parking spaces (this includes 8 handicapped spaces) for Phases One and Two. This represents 3.7 parking spaces per 1,000 square feet of leasable floor area (133/36), which is considered to be adequate for the proposed uses in the office park. The parking ratio satisfies the Planning and Zoning Board's condition of preliminary P.U.D. approval. Signage: The property is excluded from the Residential Neighborhood Sign District. All signage for this development is subject to the strict regulations of the City Sign Code that is administered by the Zoning Department. 4. Transportation: There will be three points of access to this development: A full movement curb -cut from Boardwalk Drive; Full movement from Landings Drive to the east; Full movement, possibly to become right-in/right-out only in the future, from J.F.K. Parkway to the west. An access easement for a potential future vehicular connection to the north, at the northwest corner of the site, is being dedicated with this project. This will enable a future connection from this office park to the property to the north when it develops. Two future pedestrian links are identified on the final Site Plan & Plat that will enable pedestrian connections from this office park to the property to the north when it develops. These links will be made from sidewalks east of Building 4 and west of Building 6. Landings Office Park PUD, Final, #10-95A July 24, 1995 P & Z Meeting Page 2 COMMENTS: 1. Back rg ound: The surrounding zoning and land uses are as follows: N: rp- unplatted and undeveloped S: rmp; existing U.S. Post Office E: rp; existing single family residential (High Pointe P.U.D.) W: hb; existing community/regional retail (ShopKo P.U.D.) The Landings Office Park P.U.D., Preliminary was approved by the Planning and Zoning Board on April 25, 1995 for 36,000 total square feet of floor space on 3.2 acres with the following three conditions: I . provision of an off -site drainage easement across City -owned property to the south and approval by the Larimer County Canal #2 2. minimum parking ratio requirement of 3.7 spaces per 1,000 square feet of floor space 3. maximum total floor area of 36,000 square feet in all eight buildings 2. Land Use: This is a request for final P.U.D. approval for an office park with 36,000 square feet of floor space combined office and storage) in 8 separate buildings on a 3.2 acre site. The project is planned to be developed in two phases, Phase One being Buildings 1 - 7 (the eastern 3/4 of the project, adjacent to Boardwalk Drive and Landings Drive) and Phase Two being Building 8 (on the west, adjacent to J.F.K. Parkway). It is in conformance with the Landings Office Park P.U.D., Preliminary and meets the All Development Criteria of the L.D.G.S. The total leasable square footage for all 8 buildings (combined office and storage) is 36,000 square feet. The buildings are shown with basements that may be used for office or storage. This meets the condition of preliminary approval. 3. Design: Architecture: The buildings are shown to be two-story with basements, approximately 25' in height, with a maximum building height of 30'. They will be residential in size and character, including sloped roofs with (typically) a 1-1/2 to 1 pitch. The building facades will be predominantly of a wood shiplap siding, with stucco accent panels at the ends and stucco columns at the main entries. The roof materials will be "random edge cut" fiberglass shingles. ITEM NO. 2 MEETING DATE 7/24/95 STAFF Steve Olt PLANNING AND ZONING BOARD l STAFF REPORT PROJECT: Landings Office Park P.U.D., Final - 410-95A APPLICANT: Lagunitas Company c/o Vaught -Frye Architects 1113 Stoney Hill Drive Fort Collins, CO. 80525 OWNER: Lagunitas Company 3307 South College Avenue, 4200 Fort Collins, CO. 80525 PROJECT DESCRIPTION: This is a request for final planned unit development (P.U.D.) approval for an office park with 36,000 square feet of floor space (combined office and storage) in 8 separate buildings on a 3.2 acre site. The property is located on the north side of Boardwalk Drive between Landings Drive and J.F.K. Parkway and is zoned rp - Planned Residential. RECOMMENDATION: EXECUTIVE SUMMARY: Approval with a condition This request for final P.U.D. approval: * Is in conformance with the Landings Office Park P.U.D., Preliminary; * meets the applicable all Development Criteria of the Land Development Guidance System (L.D.G.S.); * meets the three conditions of preliminary P.U.D. approval; * is located on a site that is excluded from the Residential Neighborhood Sign District; therefore, all aspects of proposed signage will be regulated by the Fort Collins Sign Code that is administered by the Zoning Department. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750 PLANNING DEPARTMENT