HomeMy WebLinkAboutGLENMOOR DRIVE PUD - PRELIMINARY - 8-95A - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTCurrent Planning
SUBMITTAL CHECKSHEET
The following checksheet is to be used in the preparation of a complete submittal of a
Preliminary PUD Plan
1. Application form (1 copy)
✓ 2. Filing Fee: $1640 + $10 per sheet of subdivision plat PP
✓ 3. Legal description of property (2 copies) on 8 1/2" x I sheet olwo� Q
4. A current list of names and addresses of all owners of record of real
/ property within 500 feet
V 5. Planning Objectives (25 copies)
.6. Completed point charts (3 copies)
7. Energy conservation worksheets (3 copies)
✓ 8. Architectural elevations (5 folded copies) _..---
9. Site plan (25 folded copies)
10. Landscape plan (16 folded copies)
11. Utility plans (10 unfolded copies)
12. Street cross sections (5 unfolded copies)
1 13. Physiographic data (2 copies)
— 14. Preliminary drainage report and plans and grading plans (4 copies)
J 15. Preliminary subdivision plat (21 folded copies)
V 16. Traffic impact analysis (4 copies)
17. Hazardous materials impact analysis (4 copies) .
18. Other documentation
19. Signage (circle one)
Large
S.F. 100 or more D.U.
M.F. 100 or more D.U.
Non -Res 50,000 S.F. or more
Non -Res w/regional impact
Small'
S.F. up to 100 D.U.
M.F. up to 100 D.U.
Non -Res 25,000-50,000 S.F.
All other projects not listed