Loading...
HomeMy WebLinkAboutGLENMOOR PROPERTY - REZONING - 8-95 - CORRESPONDENCE -4( 16. Please be aware that Glenmoor P.U.D. may be phasing their development and that the new street may not be extended to your north property line. If, not extended, you will have to tie in and arrange a payback from the adjacent developer. 17. A 36 foot wide local street may now be placed within a 48 foot wide right-of-way. 18. Glenmoor will have to be paved all the way to Plum.. If there are extensive street cuts for the water line, then an overlay may be required. For further information on public improvements, the Utility Plans, or the Development Agreement, please contact Mike Herzig, 221-6750. N 4 7. For any structures greater than a duplex, all ground floors must be handicap accessible. Please contact Sharon Getz, Plans Examiner, 221-6760, for handouts and information on compliance with all local, state, and federal requirements for handicap accessibility. 8. All units must be within 400 feet of a fire. -hydrant. All exterior portions of all buildings must be within 150 feet of an approved fire access roadway. 9. The Parkland Development Fee is $779 per unit payable at the time of building permit issuance. 10. The wetland area should be delineated. Any disturbance of the. wetland area must be in compliance with the requirements of the Army Corps of Engineers. It is.preferable that any re- alignment or re -design of the channel be kept as natural as possible. il. The site is located in the Canal Importation Drainage Basin. The Storm Drainage Fee is $6,181 per acre subject to the runoff coefficient. Please be aware that the Drainage Plan account for offsite flows that enter the property. Onsite detention may not be required if it can be demonstrated that developed flows can be discharged ahead of the peak flows of the West Plum Channel. 12. A HEC II run will be required. As an infill project, be sure that storm flows do not back up onto adjacent properties. The Grading Plan should include offsite information to see how onsite development fits into the surrounding area. Offsite grading may be required. You are encouraged to work with Poudre R-1 on transitioning grades in the Moore School playground area. An Erosion Control Plan, Drainage Plan„ and Grading Plan will be required. An Erosion Control Bond will be required. For further information, please contact Glen Schlueter, Stormwater Engineer, 221-6589. 13. The traffic impact analysis that was done for Glenmoor P.U.D. should be updated. The trip generation assumptions should be compared with the proposed'development to see if there is an impact on the surrounding streets and intersections. For further information on the scope'of the traffic study, please contact Tom Vosburg, Transportation Planner, 221-6608. 14. The Street Oversizing Fee is $584 per unit payable at the time of building permit issuance. 15. A set of Utility Plans must be prepared designing the public improvements that will serve the property. A Development Agreement will be prepared obligating the developer to construct the public improvements according to the approved plans. CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: January 9, 1995 ITEM: Glenmoor Subdivision between Orchard and Plum APPLICANT: Mr. Kint Glover, 2101 Lindenmeier Road, Fort Collins, CO. 80524. LAND USE DATA: Request for a mix of duplexes and four-plexes on nine lots located north of Glenmoor Drive (extended) between Plum and Orchard, east of Taft Hill Road. Property is zoned R-M and R-L. Kel7,1,i:i`�'I=fa 1. The property is located in two zoning districts. Duplexes and four-plexes are permitted uses in the R-M, Medium Density Residential Zone District. These uses, however, are not permitted in the R-L, Low Density Residential Zone District and must be processed as a planned unit development (P.U.D.). 2. For the permitted uses, the minimum lot size for a duplex is 6,000 square feet. The minimum lot size for anything greater than a duplex is 9,000 square feet. Minimum lot width must be 75 feet. 3. A rezoning of the R-L area to R-M requires a recommendation by the Planning and Zoning Board and two readings by City Council. 4. Electrical power will be brought down from the north with.the Glenmoor P.U.D. Normal development charges will apply. The units will be served from the front lot line. For further information, please contact Kevin Westhuis, 221-6700. 5. The nearest sanitary sewer is located east of the property. The sewer is not very deep in this area. Re -alignment of the channel may cause a problem with the shallow sewer line. 6. The water main will be extended down from the north with the Glenmoor P.U.D. Normal charges will apply. The water conservation standards for landscaping will apply. For further information on water and sewer issues, please contact Roger Buffington, 221-6681. COMMUNITY PLANNING & ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-OS80 (303)221-6750 PLANNING DEPARTMENT H Comm ty Planning and Environmental :vices Planning Department January 9, 1994 Mr. Kint Glover 2101 Lindenmeier Road Fort Collins, Co 80524 Dear Mr. Glover: For your information, attached is a copy of the Staff's comments concerning Glenmoor Subdivision between Orchard and Plum, presented before the Conceptual Review Team on January 9, 1995. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Siy n�l, Ted Shepard, AICP Senior Planner TS/gjd Attachments cc: Transportation Department Stormwater Department Project Planner File 281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6750 FAX (303) 221-6378 TDD (303) 224-6002