HomeMy WebLinkAboutPROSPECT GREENS PUD - PRELIMINARY - 15-95 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (3)4. Revisions made RESPONSE TO STORMWATER COMMENTS RE: PROSPECT GREENS P.U.D 1. Easement as necessary will be handled at time of Final 2. Added to plans 3. Will be added at time of Final 4. Revisions made 5. Addressed 6. Vicinity map added 7. Will be addressed at time of Final 8. Will be addressed at time of Final 9. It is shown 10. Note will be added 11. Will be addressed at time of Final 12. We do not propose or desire a water quality detention pond 13. Addressed 14. Straw bales added to grading plan 15. Boundaries of flood plain were shown on the plans 16. OK 17. Note added to plan 18. Will be addressed at time of Final 19. Will be addressed at time of Final S. T IJE 1 Y - E+!ff. Fn.r RESPONSE TO ENGINEERING COMMENTS RE: PROSPECT GREENS P.U.D. 1. Request for variance to street width was submitted with original submittal package. SITE PLAN: Comments addressed by Architectural Horizons PLAT: 1. Lot revisions made 2. It will be Tract "A" of the final plat? Its use is open space and blanket drainage easement 3. Revision made 4. Easements shown 5. Description added 6. Additions made 7. Revisions made 8. Will take place at time of Final UTILITY PLANS: 1. Note revised 2. Note added 3. Scale is correct OVERALL UTILITY PLAN: 1. Services shown 2. Note added to cross section 3. Scale is correct ryH•.c•- z-'y5 T1_1E 1 1 7 014 F'nr- s•-r.s t=is •_•c F 9a RESPONSE TO WATER/WASTEWATER COMMENTS RE: PROSPECT GREENS P.U.D PER RED -LINED PLANS: I. Fire hydrant at cul-de-sac added 2. Existing sewer depth data added. Water line will be above existing sewers 3. The 30" sewer is lower than the 24" sewer 4. 5' separation has now been shown from curb and gutter to sewer and water lines. Please note the need for 2 additional manholes. It maybe possible to eliminate a manhole if sewer line in a few places could be placed closer than 51. Please review 5. Existing homes are serviced and proposed to remain as such. f•l F=• 'r' - 2- y 5 T 1_1 E 1 1 7 E 4 P o. r s �• r� s R s s, a c _ P 0. 2- . • RESPONSE TO STAFF COMMENTS PER THE APRIL 14, 1995 LETTER FROM STEVE OLT TO ROBERT SUTTER RE: PROSPECT GREENS P.U.D. PAGE 2 18. Addressed by Architectural Horizons 19. Stormwater requirements are being addressed with stormwater utility 20. To be addressed at Final 21. Addressed by Architectural Horizons 22. Street shall be public 23. Addressed by Architectural Horizons 24. Addressed by Architectural Horizons 25. Addressed by Architectural Horizons Pl P, Y t�• TUE 1 1 - 0 = F•n_r- sc,r-t -E. Fi- a C. - RESPONSE TO STAFF COMMENTS PER THE APRIL 14, 1995 LETTER FROM STEVE OLT TO ROBERT SUTTER RE2 PROSPECT GREENS P.U.D. 1. a) Revisions were made following a utility coordination meeting on April 26, 1995. b) See comment (a) c) Note added to utility plan and addressed by Architectural Horizons d) Addressed by Architectural Horizons 2. a) Revisions/Additions made b) Footprints removed (this is a preliminary plat) c) Addressed by Architectural Horizons d) Addressed by Architectural Horizons e) Addressed by Architectural Horizons 3. Addressed by Architectural Horizons 4. Note added to plat. Will be addressed at time of Final 5. Added to preliminary plat 6. See attachment 7. See attachment 8. See attachment 9. Addressed by Architectural Horizons 10. Addressed by Architectural Horizons 11. Revisions made to sidewalk on applicable plans 12. Addressed by Architectural Horizons 13. Addressed by Architectural Horizons 14. OK 15. Addressed by Architectural Horizons 16. Addressed by Architectural Horizons 17. Addressed by Architectural Horizons