HomeMy WebLinkAboutPROSPECT GREENS PUD - PRELIMINARY - 15-95 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSMr. Steve Olt
May 3, 1995
Page Four
limits. We do not feel that holding the approval of this project to deciding on a more
inclusive policy is fair or possibly legal, since there are no known policies addressing this
issue at this time that we are aware of. We are willing to discuss the possibility of sharing
our access with the property to the west should it develop in the future. Any dedications
for this event would have to be equitably compensated in the future should they occur.
22. 1 believe that the revised plans clearly answer these questions. The Street is to be a
Public street.
23. The revised site plan shows existing trees and what will happen to them
24. Scales have been corrected on the appropriate plans.
25. A note has been added to the site sign elevation requiring compliance with City
Ordinances/Codes.
This completes our answers to the review comments of your letter. Please feel free to contact me
should you have any further questions that require answers or should you have any issues that
we have not addressed.
�. •Illy
Robe
Principal
Enc
CC Ron Young
Larry Pedersen
Parsons & Associates
Mr. Steve Olt
May 3, 1995
Page Three
system on the site. Based on several informal meetings with Staff prior to Preliminary
submittal we have already shuffled Garages back some to accommodate utilities and
ROW requirements. With the submittal of these revisions the Street ROW has been
expanded to approximately 44 feet with 9.5 feet easements on each side of the street in
addition. Minimum 6' easements along the east and west property lines will be required
for Cable TV and Telephone. In addition to these easements at east and west property
lines a minimum 10 foot drainage swale is required to accommodate storm water
requirements. If Garages are pushed back the minimum that would be allowed by these
other constraints no purpose will be served except creating longer driveways. The fronts
of the homes through their front porches are already at their limits as far as moving closer
to the street with out encroaching on required easements as earlier described.
We have attempted to vary the street scape by clustering garages and structures in
irregular patterns on both sides of the street to create interest. Two garages have been
turned 90 degrees in this effort. Landscaping has been used to further create scale and
reduce the impact of building mass. Some variance in set back can also be used but is
really limited because of the constraints earlier discussed.
16. See 15.
17. We have rearranged some of the landscaping to make open space more usable. We do
not agree that there are to many units on the site. The Project supports City Policies for
Increased densities and does not approach those densities preferred in those policies.
Point Chart Calculations support more units on the site than are presently shown. So
density has already been reduced below that allowed. This project is on the City' bike trail
less than 1/3 of a mile by Bike Trail from a major park area. Additionally, a playground
area on Poudre R-1 property exists within 200 feet of the site at the Discovery Center to
the west. Lesher Junior High School is across Prospect Street from the site with a
controlled cross walk access within 250 feet of the site. There is plenty of opportunity for
recreation within reasonable distances for this project. Open areas on the project are
intended to provide street scape variety and interest as well as to provide space for less
active recreation.
18. Most fencing has been removed from the site east and west boundaries based on
discussion with Staff. Some fencing remains at the north end of the site between the
existing home in the northeast corner and the new home located near there. Fencing will
be wood, painted, of staggering pickets, 5 feet +/_ high.
19. See Parson's Comments.
20. See Parson's Comments.
21. Don't really know how to respond to this comment. We do not have any control over other
properties other than ours so can not address this issue beyond our own property line
Mr Steve Olt
May 3, 1995
Page Two
d. The whole works have been added to the Site Plan.
e. A note has been added to the Landscape Plan about completion of work.
3. The Property lines have been shown on the site plan along with building foot print set
back dimensions. Set back have been altered as required to meet UBC requirements for
separation of buildings and eave line projections.
4. See Parson's Comments.
5. See Parson's Comments.
6. See Parson's Comments. (Attachments submitted to the appropriate engineering entity.)
7. See 6. Above.
8. See 6. Above.
9. The conservation standards have been reviewed and are reflected on the revised
landscape plan as appropriate.
10. Tree protection notes have been added to the landscape plan.
11. The sidewalk has been widened to eight feet. Since this width is wider than the "normal"
4 feet required it is our understanding that the developer will be reimbursed by the City
for the cost of the additional width. We have also relocated the walk to the east side of
the property so that active recreation space can be more effectively utilized.
12. Natural Resources Division:
a. "Dry Land" grasses will not be used. Precise final requirements will be coordinated
with the Natural Resources Division.
b. Proposed activities anticipated in the open space would be for activities like
Frisbee, Picnicking, Touch Football, etc. The area will be mowed.
13. We believe the Off -set will not be an issue. Our traffic study will be amended as
appropriate to address this issue.
14. See the Landscape Plan revisions. We will work out final plantings and configurations with
the City as may be reasonably required.
15. We have straightened the walkway out as best we could through some of the green areas
between homes. Minimum City requirements for driveway length drive the side walk
ARCHITECTURAL HORIZONS
May 3, 1995
Mr. Steve Olt, Project Planner
Community Planning and Environmental Services
City of Fort Collins
P.O. Box 580
Fort Collins, CO. 80522-0580
PO Box 271217
Fort Collins, Colorado 80527
RE: Response to Staff Comments of Preliminary Submittal for Prospect Greens PUD.
Dear Steve,
This letter along with the revised Site Plan and Landscape Plan will constitute our response to
City comments received in our office on April 19, 1995. Responses to engineering issues are
being submitted by Parsons and Associates directly to the Engineering Department along with
their written response. I am including a copy of the comments prepared by Parson's with this
letter for your convenience.
The remainder of this letter will follow the format of your April 14, 1995 letter to us in which you
presented comments from the various City Staffs.
Response:
Public Service:
a. See Parson's Comments.
b. See Parson's Comments.
C. See Parson's Comments. These issues will be further coordinated in preparing
final Landscape Plans to assure that trees do not interfere with Gas Lines or other
utilities as appropriate. A note has been added to the Landscape Plan.
d. This is not an issue on the revised plans. Porches, steps, etc. will not encroach on
easements.
2. Zoning Department:
a. Lot Dimensions have been added to the Site Plan. See Parson's Comments.
b. See Parson's Comments
C. Lots of dimensions have been added.